Planning application
Land And Buildings At Former Killearn Hospital Killearn
Works: Demolition Trees Major scheme
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of 89No. dwelling houses with (in principle) erection of 5No. Class 4/Class 1 buildings and care home facility, demolition of remaining buildings and remediation of the site, with associated infrastructure, open space, landscaping drainage and tree works
As published by the council, reference 20/00098/FUL
Application record
- Reference
- 20/00098/FUL
- Type
- Full
- Status
- Decided
- Decision
- Granted As published: Approve - Subject to Section 75
- Received
- 7 Feb 2020
- Validated
- 13 Feb 2020
- Decided
- 24 Oct 2022
- Ward
- Ward 2 Forth & Endrick
- Parish
- Killearn Community Council
- Decision by
- Planning Panel
Timeline
Dates from the published record
-
7 Feb 2020
Received by Stirling
-
13 Feb 2020
Validated
Checked as complete and ready for consideration.
-
24 Oct 2022
Decision issued: Approve - Subject to Section 75
-
9 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
39 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Stirling granted permission on 24 October 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land 230M South West Of Essangal Cottage Killearn
Erection of dwellinghouse and garage, including foul drainage, upgrade of access and ground mounted Solar Photovoltaic Panels
Withdrawn Full applicationsDomestic -
Land Northwest Of Oakwood Garden Centre Killearn
Application under Section 42 of the Town and Country Planning (Scotland) Act to vary Condition 1 of Planning Permission 23/00747/FUL to extend the temporary permission until 28th February 2025
Granted Full applications 3 docs -
Blane River Cottage Killearn G63 9QH
Redevelopment of dwelling house involving the raising of the roof and erecting two storey pitched roof extensions
Granted Full applications Extension 11 docsDomestic -
Home Farm Killearn Glasgow G63 9QH
Erection of fishing lodge with cafeteria and fishing control kiosk (renewal of consent under Article 5 of procedure order)
Granted Full applications -
Home Farm Killearn G63 9QH
Building a residential development of 11 dwellings comprising 7 for re-development, 3 new build and 1 new build replacing existing farm house
Granted Full applications New dwelling 42 docsMajor scheme -
Small domestic
Other full applications
In Stirling
-
26/00356/FUL Granted
1 Strathview Terrace Balfron G63 0PS
Removal of existing sun lounge and erection of single storey extension
-
26/00471/FUL Awaiting decision
Endrick Cottage Polmaise Road Stirling FK7 9JH
Alterations and extensions to dwellinghouse
-
26/00295/FUL Granted
The Peak Stirling Sports Village Forthside Way Stirling FK8 1QZ
Installation of a new external chiller plant, to support the PEAK Leisure Centre's Ice Rink, with the introduction of a foundation slab and surrounding perimeter security fence with the adjacent existing chiller equipment being decommissioned and left insitu
-
26/00400/FUL Withdrawn
Endrick Cottage Polmaise Road Stirling FK7 9JH
Alterations and extensions to dwellinghouse
-
26/00465/FUL Awaiting decision
16 Randolph Terrace Stirling FK7 9AD
Removal of a redundant timber gate in the Williamfield Avenue boundary wall and infilling of the wall opening in blockwork, harled and painted to match the existing wall. Reinstatement of a storm-damaged timber gate between the front and side garden.