Planning application

Scottish Churches House 1 Kirk Street Dunblane FK15 0AL

Granted Stirling 19/00874/FUL Full

Works: New dwelling Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Amendment to existing Planning Permission (18/00036/FUL) to change proposals from 2No. flatted dwellings and 1No. terraced dwelling house to 2No. semi-detached dwelling houses

As published by the council, reference 19/00874/FUL

Application record

Reference
19/00874/FUL
Type
Full
Status
Decided
Decision
Approve with Conditions
Received
5 Nov 2019
Validated
8 Nov 2019
Decided
8 Jan 2020
Ward
Ward 3 Dunblane & Bridge Of Allan
Parish
Dunblane Community Council
Decision by
Delegated
Postcode
FK15 0AL

Timeline

Dates from the published record

  1. 5 Nov 2019

    Received by Stirling

  2. 8 Nov 2019

    Validated

    Checked as complete and ready for consideration.

  3. 8 Jan 2020

    Decision issued: Approve with Conditions

  4. 8 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice

1 application on PlanIndex

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Scottish Churches House 1 Kirk Street Dunblane FK15 0AL

    19/00876/LBC Submitted 5 Nov 2019 1m away

    Alterations of offices to form 2No. semi-detached dwelling houses

    Granted Heritage and listed buildings New dwelling 5 docs
    Domestic
  • Carroncraig 2 Sinclair Street Dunblane FK15 0AH

    TREENQ-2026-075 Submitted 27 Aug 2026 15m away

    99% historically approved · decision due ~22 Oct

    Crown reduce by 50% and shape accordingly 1no. Beech tree (T.1) and fell 1no. Holly (T2)

    Awaiting decision Trees 2 docs
  • Carroncraig 2 Sinclair Street Dunblane FK15 0AH

    25/00690/LBC Submitted 16 Dec 2025 18m away

    Extension and alterations to dwelling including replacement of glazed roof of conservatory with single ply membrane, and formation of full height doorway at rear and alterations to form a new window

    Granted Heritage and listed buildings Extension Windows or glazing 8 docs
    Small domestic
  • Carroncraig 2 Sinclair Street Dunblane FK15 0AH

    25/00689/FUL Submitted 16 Dec 2025 19m away

    Extension and alterations to dwelling including replacement of glazed roof of conservatory with single ply membrane, and formation of full height doorway at rear

    Granted Full applications Extension Windows or glazing 8 docs
    Small domestic
  • Cathedral Square Cottage 7 Kirk Street Dunblane FK15 0AL

    26/00024/LBC Submitted 19 Jan 2026 36m away

    Demolish and rebuild the external west facing wall including insertion of new timber, double glazed sash and case windows.

    Granted Heritage and listed buildings Demolition Windows or glazing 11 docs
  • Cathedral Square Cottage 7 Kirk Street Dunblane FK15 0AL

    26/00023/FUL Submitted 19 Jan 2026 37m away

    Demolish and rebuild the external west facing wall including insertion of new timber, double glazed sash and case windows.

    Granted Full applications Demolition Windows or glazing 11 docs

In Stirling

  • 26/00207/FUL Granted

    23 Newmarket Bannockburn

    Change of use of first floor and attic to form 3no. flats

    20 Apr 2026 Full applications
  • 26/00307/FUL Granted

    Glenbrae Glen Road Dunblane FK15 0DS

    Demolition of existing lean-to-greenhouse attached to house and installation of new greenhouse

    17 Jun 2026 Full applications
  • 26/00341/FUL Granted

    Reservoir Keeper 18 Carron Valley Carronbridge FK6 5JL

    Proposed single storey extension to dwelling house

    6 Jul 2026 Full applications
  • 26/00338/FUL Granted

    20A Melville Terrace Stirling FK8 2NQ

    Single storey side extension and installation of entrance gates

    2 Jul 2026 Full applications
  • 26/00318/FUL Granted

    34 Branziert Road North Killearn G63 9RF

    Erection of a rear dormer and formation of raised patio area

    22 Jun 2026 Full applications