Planning application
Succough Farm Killin FK21 8SY
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Construction of 100 kW hydro electric generating scheme with reinforced concrete intake structure with Coanda intake screens, buried pressure pipeline, access track to intake and traditional built powerhouse with outfall to the Ardeonaig burn
As published by the council, reference 15/00042/FUL
Application record
- Reference
- 15/00042/FUL
- Type
- Full
- Status
- Conditions
- Decision
- Granted As published: Approve with Conditions
- Received
- 1 Feb 2015
- Validated
- 1 Feb 2015
- Decided
- 16 Jul 2015
- Ward
- Ward 1 Trossachs & Teith
- Parish
- Killin Community Council
- Decision by
- Delegated
- Postcode
- FK21 8SY
Timeline
Dates from the published record
-
1 Feb 2015
Received by Stirling
-
16 Jul 2015
Decision issued: Approve with Conditions
-
2 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Stirling granted permission on 16 July 2015, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
West Brae Cottage Killin FK21 8SY
Erection of external deck and stair
Granted Full applications 6 docs -
Brae Lodge Ardeonaig FK21 8SY
Application under Section 150(1)(c) of the Town and Country Planning (Scotland) Act 1997 to clarify compliance with condition 5 of applications S/05/00653/DET and 21/00627/FUL to allow each of the three chalets to be sold or let individually for use as temporary holiday accommodation or holiday letting accommodation
Granted Lawful development 3 docs -
Abernethy Trust Ardeonaig Killin Perthshire FK21 8SY
Erection of two wind turbines
Granted Full applications
Other full applications
In Stirling
-
26/00414/FUL Granted
34 Coneyhill Road Bridge Of Allan FK9 4EL
Replacement of an existing sunroom with a conservatory on the rear/side of the property
-
26/00514/FUL Awaiting decision
Foin Aven 2 Airthrey Avenue Bridge Of Allan FK9 4QX
Proposed internal alterations and construction of a single storey rear extension to replace an existing conservatory.
-
26/00410/FUL Granted
14 Forglen Road Bridge Of Allan FK9 4BH
Addition of privacy screened roof deck onto existing single story flat roof and erection of rear dormer
-
26/00503/FUL Awaiting decision
Vacant Premises 72A Murray Place Stirling FK8 2BX
Change of use of first-floor premises to form an indoor managed cue sports venue (Class 11 Assembly and Leisure)
-
26/00505/FUL Awaiting decision
4 Hirst Court Fallin FK7 7HZ
Single storey side extension