Planning application
27A Fountain Road Bridge Of Allan FK9 4AT
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Single storey extension to rear of property, new entrance position and canopy to the front and conversion of existing garage to provide utility room, W.C. and storage rooms
As published by the council, reference 14/00188/FUL
Application record
- Reference
- 14/00188/FUL
- Type
- Full
- Status
- Conditions
- Decision
- Approve with Conditions
- Received
- 31 Mar 2014
- Validated
- 13 May 2014
- Decided
- 24 Jul 2014
- Ward
- Ward 3 Dunblane & Bridge Of Allan
- Parish
- Bridge Of Allan Community Council
- Decision by
- Delegated
- Postcode
- FK9 4AT
Timeline
Dates from the published record
-
31 Mar 2014
Received by Stirling
-
13 May 2014
Validated
Checked as complete and ready for consideration.
-
24 Jul 2014
Decision issued: Approve with Conditions
-
2 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
-
-
20 Fountain Road Bridge Of Allan Stirling FK9 4AT
Alteration of window detail to form patio doorway for flatted property
Granted Full applications Windows or glazing -
23 Fountain Road Bridge Of Allan Stirling FK9 4AT
Alteration to roof space of semi-detached dwelling incorporating dormer extension
Refused Full applications New dwelling Extension +1Domestic -
St Margarets 22 Fountain Road Bridge Of Allan FK9 4AT
99% historically approved · decision due ~19 Oct
Demolition of garage and erection of an ancillary garden room in its place
Awaiting decision Full applications Demolition 7 docs -
33 Fountain Road Bridge Of Allan FK9 4AT
Replacement conservatory involving replacement of existing glass roof, windows and doors and keeping stone base
Granted Full applications Extension Windows or glazing 6 docs
Other full applications applications
In Stirling
-
26/00207/FUL Granted
23 Newmarket Bannockburn
Change of use of first floor and attic to form 3no. flats
-
26/00307/FUL Granted
Glenbrae Glen Road Dunblane FK15 0DS
Demolition of existing lean-to-greenhouse attached to house and installation of new greenhouse
-
26/00341/FUL Granted
Reservoir Keeper 18 Carron Valley Carronbridge FK6 5JL
Proposed single storey extension to dwelling house
-
26/00338/FUL Granted
20A Melville Terrace Stirling FK8 2NQ
Single storey side extension and installation of entrance gates
-
26/00318/FUL Granted
34 Branziert Road North Killearn G63 9RF
Erection of a rear dormer and formation of raised patio area