Matalan Unit B-C Danestrete Stevenage Herts

Decided Stevenage 25/00648/RMM

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Section 73 amendment application to planning permission ref. 20/00643/RMM relating to changes to building heights and internal configuration of phase 2 of the approved development.

As published by the council, reference 25/00648/RMM

Application record

Reference
25/00648/RMM
Status
Decided
Received
25 Aug 2025
Validated
25 Aug 2025
Decided
29 Oct 2025
Ward
Bedwell
Parish
To Follow
Decision by
Committee Decision

Site history

Applications at this address on the Stevenage register

This site has had 3 applications since 2021: 2 approved, 0 refused.

  • 21/00482/COND Granted

    Matalan Unit B-C Danestrete Stevenage Herts

    Discharge of conditions 10 (Drainage) and 21 (Noise attenuation) attached to planning permission reference 14/00559/OPM

    Decided 8 Jul 2021 Conditions
  • 21/00438/COND Granted

    Matalan Unit B-C Danestrete Stevenage Herts

    Full discharge of conditions 8 (Tree protection measures) and 18 (Asbestos) and partial discharge of conditions 12 (Wheel wash facilities), 14 (Archaeology), 17 (Dust control measures) and 19 (Construction method statement) covering Phase 1 demolition and enabling works attached to planning permission number 14/00559/OPM

    Decided 8 Jul 2021 Conditions

Timeline

Dates from the published record

  1. 25 Aug 2025

    Received by Stevenage

  2. 29 Oct 2025

    Decision issued

  3. 7 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Application: 20/00643/RMM (Decided)

Documents

Plans, drawings, consultee responses and the officer's report

74 documents on file for this application

  • DECISION NOTICE Decision Notice · 29 Oct 2025
  • NOTICE 1 Supporting Documents · 28 Aug 2025
  • APPLICATION FORM Application Form · 25 Aug 2025
  • 3RD FLOOR PLANS Drawings · 25 Aug 2025
  • 4TH FLOOR PLANS Drawings · 25 Aug 2025
  • 5TH FLOOR PLANS Drawings · 25 Aug 2025
  • 6TH FLOOR PLANS Drawings · 25 Aug 2025
  • 7TH FLOOR PLANS Drawings · 25 Aug 2025
  • 8TH FLOOR PLANS Drawings · 25 Aug 2025
  • 9TH FLOOR PLANS Drawings · 25 Aug 2025
  • 10TH FLOOR PLANS Drawings · 25 Aug 2025
  • 11TH FLOOR PLANS Drawings · 25 Aug 2025
  • 12TH FLOOR PLANS Drawings · 25 Aug 2025
  • 13TH FLOOR PLANS Drawings · 25 Aug 2025
  • 14TH FLOOR PLANS Drawings · 25 Aug 2025
  • 15TH FLOOR PLANS Drawings · 25 Aug 2025
  • 16TH FLOOR PLANS Drawings · 25 Aug 2025
  • 17TH FLOOR PLANS Drawings · 25 Aug 2025
  • 18TH FLOOR PLANS Drawings · 25 Aug 2025
  • 19TH FLOOR PLANS Drawings · 25 Aug 2025
  • 20TH FLOOR PLANS Drawings · 25 Aug 2025
  • 21ST FLOOR PLANS Drawings · 25 Aug 2025
  • SITE LOCATION PLAN Drawings · 25 Aug 2025
  • SITE PLAN EXISTING Drawings · 25 Aug 2025
  • SITE PLAN PROPOSED Drawings · 25 Aug 2025
  • SITE LEVELS STRATEGY Drawings · 25 Aug 2025
  • GROUND FLOOR PLAN Drawings · 25 Aug 2025
  • 1ST FLOOR PLANS Drawings · 25 Aug 2025
  • 2ND FLOOR PLANS Drawings · 25 Aug 2025
  • SECTIONS A-A Drawings · 25 Aug 2025
  • SECTIONS B-B Drawings · 25 Aug 2025
  • LONGITUDINAL SITE SECTIONS Drawings · 25 Aug 2025
  • ELEVATIONS NE Drawings · 25 Aug 2025
  • ELEVATIONS N-NW Drawings · 25 Aug 2025
  • ELEVATIONS INTERNAL SW Drawings · 25 Aug 2025
  • ELEVATIONS INTERNAL SE Drawings · 25 Aug 2025
  • ELEVATIONS INTERNAL NW Drawings · 25 Aug 2025
  • ELEVATIONS INTERNAL NE Drawings · 25 Aug 2025
  • ELEVATIONS DANESTRETE Drawings · 25 Aug 2025
  • EXISTING STREET SCENE ELEVATIONS Drawings · 25 Aug 2025
  • STREET SCENE ELEVATIONS Drawings · 25 Aug 2025
  • ELEVATIONS SW Drawings · 25 Aug 2025
  • ELEVATIONS SE Drawings · 25 Aug 2025
  • ELEVATIONS NW Drawings · 25 Aug 2025
  • TYPICAL BAY STUDY 1 BLOCK E Drawings · 25 Aug 2025
  • TYPICAL BAY STUDY 1 BLOCK F Drawings · 25 Aug 2025
  • TYPICAL BAY STUDY 1 BLOCK A Drawings · 25 Aug 2025
  • TYPICAL BAY STUDY 1 BLOCK B Drawings · 25 Aug 2025
  • TAT 1B2P TYPE E Drawings · 25 Aug 2025
  • TAT 2B3P WAD Drawings · 25 Aug 2025
  • TAT 2B4P TYPE A Drawings · 25 Aug 2025
  • TAT 2B4P TYPE B Drawings · 25 Aug 2025
  • TAT 2B4P TYPE C Drawings · 25 Aug 2025
  • TAT 2B4P TYPE D Drawings · 25 Aug 2025
  • TAT 2B4P TYPE E Drawings · 25 Aug 2025
  • TAT 2B4P TYPE F Drawings · 25 Aug 2025
  • TAT 3B4P TYPE A Drawings · 25 Aug 2025
  • TAT 3B6P TYPE A Drawings · 25 Aug 2025
  • TAT 1B2P TYPE A Drawings · 25 Aug 2025
  • TAT 1B2P TYPE B Drawings · 25 Aug 2025
  • TAT 1B2P TYPE C Drawings · 25 Aug 2025
  • TAT 1B2P TYPE D Drawings · 25 Aug 2025
  • PROPOSED LOBBY LAYOUT Drawings · 25 Aug 2025
  • SCHEDULE OF ACCOMODATION Drawings · 25 Aug 2025
  • CGIS Drawings · 25 Aug 2025
  • CGIS Drawings · 25 Aug 2025
  • DESIGN AND ACCESS STATEMENT PART3 Supporting Documents · 25 Aug 2025
  • DESIGN AND ACCESS STATEMENT PART4 Supporting Documents · 25 Aug 2025
  • DESIGN AND ACCESS STATEMENT PART5 Supporting Documents · 25 Aug 2025
  • DESIGN AND ACCESS STATEMENT PART6 Supporting Documents · 25 Aug 2025
  • DESIGN AND ACCESS STATEMENT PART7 Supporting Documents · 25 Aug 2025
  • DESIGN AND ACCESS STATEMENT PART1 Supporting Documents · 25 Aug 2025
  • DESIGN AND ACCESS STATEMENT PART2 Supporting Documents · 25 Aug 2025
  • CIL FORM Supporting Documents · 25 Aug 2025

Watch members (£5 a month) open the document list from here.

Open the documents

After the decision

Stevenage has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Stevenage's portal will say. Our guide explains the common types.