Planning application
10 Fernhurst Close Stone Staffordshire ST15 8PS
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Lawful Development Certificate - Proposed rear single storey extension
As published by the council, reference 23/37163/LDCPP
Application record
- Reference
- 23/37163/LDCPP
- Type
- Lawful Development Cert Proposed Public
- Status
- Decided
- Decision
- Granted As published: Permitted Development
- Received
- 27 Feb 2023
- Validated
- 9 Mar 2023
- Decided
- 2 May 2023
- Ward
- St Michaels And Stonefield
- Parish
- Stone Town
- Postcode
- ST15 8PS
Timeline
Dates from the published record
-
27 Feb 2023
Received by Stafford
-
9 Mar 2023
Validated
Checked as complete and ready for consideration.
-
2 May 2023
Decision issued: Permitted Development
-
7 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Stafford granted permission on 2 May 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About lawful development applications
A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
138 Lichfield Road Stone Staffordshire ST15 8PY
80% historically approved · decision due ~14 Jul
TPO 1 1952: Horse Chestnut - Fell, tree has bleeding canker which has spread through tree and large limbs have died off.
Awaiting decision Trees -
8 Park House Drive Stone ST15 8QR
TPO 79 1980 (G1): Norway Maple - Removal of epicormic growth from main stem. Beech - Reduction of crown by 2-3m over building, dieback could also be reduced back and crown to be reduced back from telecom lines
Granted Trees 6 docs -
Domestic
-
10 Westover Drive Stone Staffordshire ST15 8TT
TPO 192 1997 & TPO 1 1952: Beech - Reduce branches overhanging neighbouring property by no more than 3m and remove 2 lower branches. Lime - Crown reduce and thin by 20%.
Refused Trees 8 docs -
17 Westover Drive Stone Staffordshire ST15 8TT
TPO 192 1997 (G5): Scots Pine - Fell
Refused Trees 4 docs -
14 Westover Drive Stone Staffordshire ST15 8TT
80% historically approved · decision due ~2 Sep
TPO 1 1952: Common Lime - Remove epicormic growth from centre of tree. Reduce lateral branches for approx. 3m clearance from buildings.
Awaiting decision Trees
Other lawful development applications
In Stafford
-
26/42793/LDCPP Awaiting decision
16 Robinswood Wildwood Stafford Staffordshire ST17 4QY
Lawful Development Certificate - Proposed use - small-scale, part-time home kitchen activity
-
26/42781/LDCPP Awaiting decision
35 Silkmore Lane Stafford Staffordshire ST17 4JN
Lawful Development Certificate Proposed use of the land to site a mobile home for ancillary use to the main dwellinghouse.
-
26/42792/LDCPP Awaiting decision
19 Chestnut Close Derrington Stafford Staffordshire ST18 9NJ
Lawful Development Certificate - Proposed Change of Use of a Dwelling (C3) to Residential institution (C2)
-
26/42254/LDCPP Granted
12 Lister Grove Stallington Stoke-On-Trent Staffordshire ST11 9TS
Lawful Development Certificate Proposed - Drop front kerb to the front, hardstanding to the front of the dwellinghouse, wall mounted electric charging unit less than 0.2 cubic metres
-
26/41860/LDC Withdrawn
Doxeywood Farmhouse Thorneyfields Lane Hyde Lea Stafford Staffordshire ST18 9BY
The northern range attached to the existing barn conversions was demolished and subsequently rebuilt 4-years prior to 25 April 2024.