Planning application
Friary Retail Park The Green Stafford Staffordshire ST17 4BA
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of three Ultra Rapid EV charging stations for six EV bays and associated electrical equipment
As published by the council, reference 22/36840/FUL
Application record
- Reference
- 22/36840/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Granted As published: Allowed
- Received
- 29 Nov 2022
- Validated
- 13 Jan 2023
- Decided
- 15 May 2023
- Ward
- Forebridge
- Parish
- Stafford M B
- Decision by
- Delegated Decision
- Postcode
- ST17 4BA
Timeline
Dates from the published record
-
29 Nov 2022
Received by Stafford
-
13 Jan 2023
Validated
Checked as complete and ready for consideration.
-
15 May 2023
Decision issued: Allowed
-
18 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
23 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Stafford granted permission on 15 May 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
2 The Brooklands Friars Walk Forebridge Stafford Staffordshire ST17 4AD
Proposed ground floor extension to rear of existing dwelling to form utility room
Granted Householder ExtensionDomestic -
The Old Library Lichfield Road Stafford Staffordshire
80% historically approved · decision due ~15 Jun
Change of use of the ground floor from its lawful existing use as a restaurant (Use Class E(b) to residential use (Use Class C3) to form 9 self-contained apartments. (In conjunction with 26/41737/FUL)
Awaiting decision Heritage and listed buildings New dwelling -
The Old Library Lichfield Road Stafford Staffordshire
84% historically approved · decision due ~15 Jun
Change of use of the ground floor from its lawful existing use as a restaurant (Use Class E(b) to residential use (Use Class C3) to form 8 self-contained apartments. Linked with 26/41738/LBC
Awaiting decision Full applications New dwelling -
7 Lichfield Road Stafford Staffordshire ST17 4JX
Change of use of incidental open space to bin storage area, with perimeter fencing
Withdrawn Full applications 13 docs -
Chetwynd Centre 10 Newport Road Stafford Staffordshire ST16 2HE
Discharge of condition 4 on 18/28344/LBC
Granted Heritage and listed buildings 11 docs -
Chetwynd Centre 10 Newport Road Stafford Staffordshire ST16 2HE
Variation of conditions 2 (plans), 4 (materials), and 7 (access and footpaths) of permission 18/28342/FUL
Granted Full applications 30 docs
Other full applications
In Stafford
-
26/42229/FUL Granted
11 Coronation Road Stafford Staffordshire ST16 3JR
Change of use of an existing detached garden outbuilding to part-time hair salon (Use Class E)
-
25/41438/FUL Granted
The Mews Care Centre Hilcote Hall Stone Road Eccleshall Stafford Staffordshire ST21 6JX
Proposed new septic tank
-
26/41936/FUL Refused
Land East Of Ridding Bank Hanchurch Staffordshire ST4 8SD
Change of use of agricultural land to equestrian use and construction of a 20m x 40m outdoor riding arena menage with permeable sub-base, sand and fibre surface and associated drainage
-
25/41085/FUL Granted
The Oaks Doley Mill Farm Adbaston Lane Adbaston Stafford Staffordshire ST20 0RQ
Removal of condition 13 on 91/26668/OUT
-
26/42011/FUL Granted
Staffordshire Police Authority Weston Road Stafford Staffordshire ST18 0YY
Installation of new plant compound which will contribute to renewable energy for the stations power demand.