Planning application
Canberra Stafford Road Aston By Stone Stone Staffordshire ST15 0BH
Works: Extension Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Regularisation of work now completed differing from originally consented drawings which were approved under 17/25538/FUL and a glass link extension connecting two converted areas of a single dwelling to provide better access for the disabled occupants.
As published by the council, reference 19/31339/FUL
Application record
- Reference
- 19/31339/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Allowed
- Received
- 16 Oct 2019
- Validated
- 4 Nov 2019
- Decided
- 24 Dec 2019
- Ward
- Milwich
- Parish
- Stone Rural
- Decision by
- Delegated Decision
- Postcode
- ST15 0BH
Timeline
Dates from the published record
-
16 Oct 2019
Received by Stafford
-
4 Nov 2019
Validated
Checked as complete and ready for consideration.
-
24 Dec 2019
Decision issued: Allowed
-
20 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
20 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Former Crown Inn Stafford Road Aston By Stone Stone Staffordshire ST15 0BH
Conversion of residential dwelling to 3 one bedroom apartments
Granted Full applications New dwelling 16 docsDomestic -
Aston Pool Farm Stafford Road Aston By Stone Stone Staffordshire ST15 0BH
80% historically approved · decision due ~28 Sep
Permission in Principle - Residential development for up to six dwellings
Awaiting decision Outline New dwellingSeveral homes
Other full applications applications
In Stafford
-
26/42040/FUL Granted
Unit K Part 1 Boons Industrial Estate Derrington Lane Derrington Stafford Staffordshire ST18 9NH
Retrospective application for erection of a 95m length steel security fence and gates varying in height between 3.0m and 3.6m on line of existing fence boundary.
-
26/41742/FUL Granted
Spon Farm Uttoxeter Road Milwich Stafford Staffordshire ST18 0HD
Replacement agricultural building (self and custom build)
-
26/41794/FUL Granted
Plot 17 Beacon Business Park Weston Road Stafford Staffordshire
Variation of condition 2 of planning permission no. 24/39402/FUL to allow for amendments to approved light industrial (Class E) and warehouse/ distribution (B8) units
-
26/41997/FUL Granted
Ellesmere House St Georges Hospital Corporation Street Stafford Staffordshire ST16 3AG
Proposed landscaping works
-
26/41812/FUL Granted
Darlaston Grange Farm Yarnfield Lane Yarnfield Stone Staffordshire ST15 0NE
Continued use of farmhouse as three separate dwellings and resurfacing of driveway