Planning application
Lamerwood House Codicote Road Wheathampstead Hertfordshire Al4 8Gb
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Construction of agricultural shed
As published by the council, reference 5/2017/2711
Application record
- Reference
- 5/2017/2711
- Type
- (Minor) All Other Developments
- Status
- Approved
- Decision
- Granted As published: DC3 Conditional Permission
- Received
- 25 Sep 2017
- Validated
- 5 Oct 2017
- Decided
- 23 Nov 2017
- Ward
- Wheathampstead
- Parish
- Wheathampstead
- Decision by
- Delegated
- Postcode
- AL4 8GB
Site history
Applications at this address on the St Albans register
This site has had 4 applications since 2017: 2 approved, 1 refused.
-
5/2026/1250 Awaiting decision
Lamerwood House Codicote Road Wheathampstead Hertfordshire Al4 8Gb
Discharge of Conditions 5 (hard and soft landscaping) and 6 (soft landscaping) of planning permission 5/2022/2969 dated 30/08/2023 for Demolition of existing dwelling, removal of hardstanding and various structures and construction of replacement dwelling
-
5/2026/1102 Granted
Lamerwood House Codicote Road Wheathampstead Hertfordshire Al4 8Gb
Discharge of Condition 3 (existing and proposed slab levels) of planning permission 5/2022/2969 dated 31/08/2023 for Demolition of existing dwelling, removal of hardstanding and various structures and construction of replacement dwelling with basement, se
-
5/2017/1848 Refused
Lamerwood House Codicote Road Wheathampstead Hertfordshire Al4 8Gb
Prior Approval - Construction of tractor shed
Timeline
Dates from the published record
-
25 Sep 2017
Received by St Albans
-
5 Oct 2017
Validated
Checked as complete and ready for consideration.
-
23 Nov 2017
Decision issued: DC3 Conditional Permission
-
25 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
St Albans granted permission on 23 November 2017, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on St Albans's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Lamerwood House Codicote Road Wheathampstead Hertfordshire Al4 8Gb
Prior Approval - Construction of tractor shed
Refused Other 5 docsSmall domestic -
Lamerwood House Codicote Road Wheathampstead Hertfordshire Al4 8Gb
Discharge of Condition 3 (existing and proposed slab levels) of planning permission 5/2022/2969 dated 31/08/2023 for Demolition of existing dwelling, removal of hardstanding and various structures and construction of replacement dwelling with basement, se
Granted Conditions Demolition 6 docsDomestic -
Lamerwood House Codicote Road Wheathampstead Hertfordshire Al4 8Gb
96% historically approved · decision due ~26 Aug
Discharge of Conditions 5 (hard and soft landscaping) and 6 (soft landscaping) of planning permission 5/2022/2969 dated 30/08/2023 for Demolition of existing dwelling, removal of hardstanding and various structures and construction of replacement dwelling
Awaiting decision Conditions Demolition 19 docsDomestic