Planning application
7 Shortwood Avenue Staines-upon-Thames TW18 4JN
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Prior Approval Notification for a single storey rear extension extending 5 metres beyond the rear wall of the original dwellinghouse, with a maximum height of 3.85 metres and eaves height of 2.9 metres. (As shown on plans 7SA-E/30092025/PD received 16.03.2026)
As published by the council, reference 26/00260/PDH
Application record
- Reference
- 26/00260/PDH
- Type
- PD Householder Prior Approval
- Status
- Decided (Prior Approval not required)
- Decision
- Prior Approval Not Required
- Received
- 16 Mar 2026
- Validated
- 18 Mar 2026
- Decided
- 24 Apr 2026
- Ward
- Staines
- Parish
- Staines ED
- Decision by
- Delegated Decision
- Postcode
- TW18 4JN
Site history
Applications at this address on the Spelthorne register
This site has had 2 applications since 2026: 2 approved, 0 refused.
-
26/00261/CPD Granted
7 Shortwood Avenue Staines-upon-Thames TW18 4JN
Certificate of Lawfulness for the proposed loft conversion facilitated by a hip to gable extension and 1 no. rear facing dormer with juliet balcony. Insertion of 3 no. rooflights on front roof slope.
Timeline
Dates from the published record
-
16 Mar 2026
Received by Spelthorne
-
18 Mar 2026
Validated
Checked as complete and ready for consideration.
-
24 Apr 2026
Decision issued: Prior Approval Not Required
-
11 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Dagenham
29 applications on PlanIndex · across 13 councils · 96% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Spelthorne granted permission on 24 April 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
7 Shortwood Avenue Staines-upon-Thames TW18 4JN
Certificate of Lawfulness for the proposed loft conversion facilitated by a hip to gable extension and 1 no. rear facing dormer with juliet balcony. Insertion of 3 no. rooflights on front roof slope.
Granted Lawful development Extension Loft or dormer 7 docs -
282 London Road Staines-upon-Thames TW18 4JX
Change of Use from a 6-Bed HMO (Use Class C4) to a 7-Bed HMO (Sui Generis)
Granted Full applications 13 docs -
193 London Road Staines-upon-Thames TW18 4HR
Non Material Amendment to increase roof height by 1.5m on proposed self storage facility building relating to planning permission 23/01524/FUL
Refused Amendments 8 docs -
Brecknock Stanwell New Road Staines-upon-Thames TW18 4HY
Change of use from dwelling house (C3) into 8 bedroom HMO (Sui Generis) for 8 people and a single storey side and rear extension.
Granted Full applications Extension 24 docsSmall domestic -
Land To The Rear Of Eaglehurst And Ashill Stanwell New Road Staines-upon-Thames
Details pursuant to condition 4 (contaminated land) reserved from Planning Permission 21/00027/FUL.
Withdrawn Conditions 5 docs
Other prior approval applications
In Spelthorne
-
26/00488/PDH Granted
94 Spelthorne Lane Ashford TW15 1UH
Amended Description: Prior Approval Notification for a single storey rear extension extending 4.0 metres beyond the rear wall of the original house, with a maximum height of 3.37 metres and a height of 2.82 metres to the eaves (As shown on plans: Location Plan received 13.05.2026 and BAL-1913 1R rev 01; 2R rev 01; 3R rev 01; 4R rev 01; 5R rev 01 received 24.06.2026)
-
26/00533/PDH Granted
141 Elizabeth Avenue Laleham Staines-upon-Thames TW18 1JN
Prior Approval Notification for a single storey rear extension extending 5.0 metres beyond the rear wall of the original house, with a maximum height of 2.94 metres and a height of 2.79 metres to the eaves (As shown on plans: 2623_1; 2; 3; 4; 5; 6 received 21.05.2026)
-
26/00527/PDH Granted
27 Jessiman Terrace Shepperton TW17 0BQ
Prior Approval Notification for a single storey rear extension extending 6.0 metres beyond the rear wall of the original house, with a maximum height of 3.0 metres and a height of 2.9 metres to the eaves (As shown on plans: PL01; 02; 03; 05; 06; 07; 08; 09; 10 received 20.05.2026)
-
26/00462/PDH Granted
52 Avondale Road Ashford TW15 3HT
Prior Approval Notification for a single storey rear extension extending 6.0 metres beyond the rear wall of the original house, with a maximum height of 3.4 metres and a height of 2.9 metres to the eaves (As shown on plans: 52 001 and Location Plan received 05.05.2026)
-
26/00479/PDH Granted
24 Osborne Avenue Stanwell Staines-upon-Thames TW19 7AF
Prior Approval Notification for a single storey rear extension extending 6 metres beyond the rear wall of the original dwellinghouse with a maximum height of 3 metres and eaves height of 2.77 metres. (As shown on plans 2039.A2.PL01 REV A and 2039.A2.PL04, received 21.05.2026)