Planning application
50 Preston Road Shepperton TW17 0BG
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Prior Approval Notification for a single storey rear extension extending 4.35 metres beyond the rear wall of the original house, with a maximum height of 3.17 metres and a height of 2.95 metres to the eaves (As shown on plans: ART/2026/RE50PR/SPLP Rev B; ART/2026/RE50PR/EE; ART/2026/RE50PR/PE Rev B; ART/2026/RE50PR/EL; ART/2026/RE50PR/FE Rev B; ART/2026/RE50PR/PL received 19.01.2026)
As published by the council, reference 26/00052/PDH
Application record
- Reference
- 26/00052/PDH
- Type
- PD Householder Prior Approval
- Status
- Decided (Prior Approval not required)
- Decision
- Prior Approval Not Required
- Received
- 19 Jan 2026
- Validated
- 19 Jan 2026
- Decided
- 24 Feb 2026
- Ward
- Laleham And Shepperton Green
- Parish
- Laleham And Shepperton ED
- Decision by
- Delegated Decision
- Postcode
- TW17 0BG
Timeline
Dates from the published record
-
19 Jan 2026
Received by Spelthorne
-
24 Feb 2026
Decision issued: Prior Approval Not Required
-
11 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Staines-Upon-Thames
54 applications on PlanIndex · across 8 councils · 80% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About prior approval applications
How this application type works
Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.
Nearby applications
Within 500 metres
-
27 Jessiman Terrace Shepperton TW17 0BQ
Prior Approval Notification for a single storey rear extension extending 6.0 metres beyond the rear wall of the original house, with a maximum height of 3.0 metres and a height of 2.9 metres to the eaves (As shown on plans: PL01; 02; 03; 05; 06; 07; 08; 09; 10 received 20.05.2026)
Granted Prior approval Extension 14 docsSmall domestic -
58 Acacia Avenue Shepperton TW17 0AY
Erection of a two storey side and single storey rear extension (following demolition of an existing side element.
Granted Householder Extension Demolition 8 docsSmall domestic -
11 Acacia Avenue Shepperton TW17 0AZ
65% historically approved · decision due ~12 Oct
Change of use from a C3 dwellinghouse to a 5-person C4 HMO. Associated internal alterations. (part-retrospective)
Awaiting decision Full applications 175 docsDomestic -
1 Mandeville Road Shepperton TW17 0AL
Erection of a single storey side extension
Granted Householder Extension 9 docsSmall domestic -
11 Acacia Avenue Shepperton TW17 0AZ
Erection of double side extension and single storey rear extension.
Granted Householder Extension 10 docsSmall domestic -
11 Acacia Avenue Shepperton TW17 0AZ
Erection of double side extension and part single / part two storey rear extension and conversion into 2 flats
Granted Full applications New dwelling Extension 17 docsSeveral homes
Other prior approval applications
In Spelthorne
-
26/00488/PDH Granted
94 Spelthorne Lane Ashford TW15 1UH
Amended Description: Prior Approval Notification for a single storey rear extension extending 4.0 metres beyond the rear wall of the original house, with a maximum height of 3.37 metres and a height of 2.82 metres to the eaves (As shown on plans: Location Plan received 13.05.2026 and BAL-1913 1R rev 01; 2R rev 01; 3R rev 01; 4R rev 01; 5R rev 01 received 24.06.2026)
-
26/00533/PDH Granted
141 Elizabeth Avenue Laleham Staines-upon-Thames TW18 1JN
Prior Approval Notification for a single storey rear extension extending 5.0 metres beyond the rear wall of the original house, with a maximum height of 2.94 metres and a height of 2.79 metres to the eaves (As shown on plans: 2623_1; 2; 3; 4; 5; 6 received 21.05.2026)
-
26/00527/PDH Granted
27 Jessiman Terrace Shepperton TW17 0BQ
Prior Approval Notification for a single storey rear extension extending 6.0 metres beyond the rear wall of the original house, with a maximum height of 3.0 metres and a height of 2.9 metres to the eaves (As shown on plans: PL01; 02; 03; 05; 06; 07; 08; 09; 10 received 20.05.2026)
-
26/00462/PDH Granted
52 Avondale Road Ashford TW15 3HT
Prior Approval Notification for a single storey rear extension extending 6.0 metres beyond the rear wall of the original house, with a maximum height of 3.4 metres and a height of 2.9 metres to the eaves (As shown on plans: 52 001 and Location Plan received 05.05.2026)
-
26/00479/PDH Granted
24 Osborne Avenue Stanwell Staines-upon-Thames TW19 7AF
Prior Approval Notification for a single storey rear extension extending 6 metres beyond the rear wall of the original dwellinghouse with a maximum height of 3 metres and eaves height of 2.77 metres. (As shown on plans 2039.A2.PL01 REV A and 2039.A2.PL04, received 21.05.2026)