Planning application
195 Clare Road Stanwell Staines-upon-Thames TW19 7EF
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Prior Approval Notification for a single storey rear extension extending 5 metres beyond the rear wall of the original house, with a maximum height of 2.75 metres and a height of 2.75 metres to the eaves (as shown on location plan/block plan and plan no's EA/195/PA/1A, /1B, and /1C rec'd 26.11.2024).
As published by the council, reference 24/01391/PDH
Application record
- Reference
- 24/01391/PDH
- Type
- PD Householder Prior Approval
- Status
- Decided (Prior Approval not required)
- Decision
- Granted As published: Prior Approval Not Required
- Received
- 26 Nov 2024
- Validated
- 26 Nov 2024
- Decided
- 7 Jan 2025
- Ward
- Stanwell North
- Parish
- Stanwell And Stanwell Moor ED
- Decision by
- Delegated Decision
- Postcode
- TW19 7EF
Timeline
Dates from the published record
-
26 Nov 2024
Received by Spelthorne
-
7 Jan 2025
Decision issued: Prior Approval Not Required
-
25 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Engineers Associates Agent, an engineering consultancy registered in Tonbridge
Dissolved · incorporated 2017 · Tonbridge
39 applications on PlanIndex · across 8 councils · 70% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Spelthorne granted permission on 7 January 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
134 Clare Road Stanwell Staines-upon-Thames TW19 7EH
Certificate of lawfulness application to demonstrate that the existing dwelling has been converted into 2 self contained flats for an uninterrupted period in excess of four years.
Granted Lawful development New dwelling 12 docsDomestic -
104 Clare Road Stanwell Staines-upon-Thames TW19 7EH
Prior Approval Notification for a single storey rear extension measuring 6 metres in depth beyond the rear wall of the original dwelling house measuring a maximum height of 3 metres and a height to the eaves of 2.85 metres. (As shown on plans: LP/104, S/553/01, S/553/02, S/553/03, received 13.08.2021)
Refused Prior approval Extension 9 docsSmall domestic -
1 Everest Road Stanwell Staines-upon-Thames TW19 7EA
Proposed part single part double side and rear extension and front porch following demolition of existing garage (Refund 1.2.22)
Granted Householder Extension Demolition 9 docsSmall domestic -
126 Whitley Close Stanwell Staines-upon-Thames TW19 7EY
Retrospective permission for the erection of a single storey rear extension to ground floor flat.
Granted Full applications Extension 8 docsSmall domestic -
11 Everest Road Stanwell Staines-upon-Thames TW19 7EA
Erection of a single storey rear extension with internal alterations.
Granted Householder Extension 16 docsSmall domestic -
14 Douglas Road Stanwell Staines-upon-Thames TW19 7HD
Roof extension comprising rear facing dormer and 2no. first floor side facing windows.
Granted Householder Extension Loft or dormer +1 9 docsDomestic
Other prior approval applications
In Spelthorne
-
26/00488/PDH Granted
94 Spelthorne Lane Ashford TW15 1UH
Amended Description: Prior Approval Notification for a single storey rear extension extending 4.0 metres beyond the rear wall of the original house, with a maximum height of 3.37 metres and a height of 2.82 metres to the eaves (As shown on plans: Location Plan received 13.05.2026 and BAL-1913 1R rev 01; 2R rev 01; 3R rev 01; 4R rev 01; 5R rev 01 received 24.06.2026)
-
26/00533/PDH Granted
141 Elizabeth Avenue Laleham Staines-upon-Thames TW18 1JN
Prior Approval Notification for a single storey rear extension extending 5.0 metres beyond the rear wall of the original house, with a maximum height of 2.94 metres and a height of 2.79 metres to the eaves (As shown on plans: 2623_1; 2; 3; 4; 5; 6 received 21.05.2026)
-
26/00527/PDH Granted
27 Jessiman Terrace Shepperton TW17 0BQ
Prior Approval Notification for a single storey rear extension extending 6.0 metres beyond the rear wall of the original house, with a maximum height of 3.0 metres and a height of 2.9 metres to the eaves (As shown on plans: PL01; 02; 03; 05; 06; 07; 08; 09; 10 received 20.05.2026)
-
26/00462/PDH Granted
52 Avondale Road Ashford TW15 3HT
Prior Approval Notification for a single storey rear extension extending 6.0 metres beyond the rear wall of the original house, with a maximum height of 3.4 metres and a height of 2.9 metres to the eaves (As shown on plans: 52 001 and Location Plan received 05.05.2026)
-
26/00479/PDH Granted
24 Osborne Avenue Stanwell Staines-upon-Thames TW19 7AF
Prior Approval Notification for a single storey rear extension extending 6 metres beyond the rear wall of the original dwellinghouse with a maximum height of 3 metres and eaves height of 2.77 metres. (As shown on plans 2039.A2.PL01 REV A and 2039.A2.PL04, received 21.05.2026)