Planning application
Fordway Centre Stanwell Road Ashford TW15 3DU
Works: Demolition
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Demolition of former Fordway Centre and erection of a two storey building to provide new classroom accommodation and staff facilities; construction of carparking spaces; associated hard and soft landscaping and associated works. (SCC 2023-0017)
As published by the council, reference 23/00281/SCC
Application record
- Reference
- 23/00281/SCC
- Type
- Surrey County Council Application
- Status
- Decided
- Decision
- Granted As published: SBC No Object SCC Approval
- Received
- 6 Mar 2023
- Validated
- 6 Mar 2023
- Decided
- 5 May 2023
- Ward
- Ashford North And Stanwell South
- Parish
- Stanwell And Stanwell Moor ED
- Decision by
- Delegated Decision
- Postcode
- TW15 3DU
Timeline
Dates from the published record
-
6 Mar 2023
Received by Spelthorne
-
5 May 2023
Decision issued: SBC No Object SCC Approval
-
14 Sep 2026
Added to PlanIndex
Documents
The council's own list, drawings first
123 documents on file for this application
Drawings (46)
- Proposed drainage plan dated june
- Proposed planting plan dated april
- Proposed planting
- Proposed planting plan dated april
- Proposed drainage plan
- Ground floor above ground drainage layout
- General arrangement plan
- General arrangement plan lvl
- Ground floor security layout
- Elevations dated april
- South elevation
- Elevations
- East elevation cgi
- South elevation cgi
- Site sections dated april
- Site sections dated april
- Site sections dated april
- Sections
- Site sections
- General arrangement roof plan
- Fordway ap dated february
- Exceedance flow plan dated june
- Site
- Site plan
- External sports
- Fordway centre alternative brickwork cgi
- Boundary treatment plan dated may
- General arrangement dated april
- Standard draiange construction details sheet dated june
- Standard drainage construction details sheet june
- Standard drainage construction details sheet dated june
- Pavement construction details dated june
- Sitewide combined m&e services layout dated july
- Swept path analysis for a articulated vehicle dated june
- Swept path analysis for a construction vehicle dated june
- General arrangement dated april
- Boundary treatment plan dated may
- Refuse vehicle accessing site
- Car accessing drop-off bay
- External electrical services layout
- Combined mechanical and electrical services layout
- Boundary treatment plan
- Fieldwork location plan dated february
- Existing floor plan
- Existing elevations
- Existing roof plan
Everything on file (123)
- DELEGATED REPORT UPDATED 24.6.20
- SCC DECISION NOTICE
- SITE SECTIONS DATED 28 APRIL 2023
- PROPOSED PLANTING PLAN DATED 28 APRIL 2023
- BOUNDARY TREATMENT PLAN DATED 2 MAY 2023
- GENERAL ARRANGEMENT DATED 28 APRIL 2023
- 02/06/23 GROUND INVESTIGATION FACTUAL REPORT
- FIELDWORK LOCATION PLAN DATED FEBRUARY 2023
- DR001 FORDWAY AP DATED FEBRUARY 2023
- GA ELEVATIONS DATED 27 APRIL 2023
- TRAIL PIT RECORD TRL02 02 JUNE 2023
- PROPOSED DRAINAGE PLAN DATED 23 JUNE 2023
- EXCEEDANCE FLOW PLAN DATED 23 JUNE 2023
- STANDARD DRAIANGE CONSTRUCTION DETAILS SHEET 2 DATED 23 JUNE 2023
- STANDARD DRAINAGE CONSTRUCTION DETAILS SHEET 3 23 JUNE 23
- STANDARD DRAINAGE CONSTRUCTION DETAILS SHEET 4 DATED 23 JUNE 2023
- PAVEMENT CONSTRUCTION DETAILS DATED 23 JUNE 2023
- DESIGN CALCULATIONS REV P3 28 JUNE 2023
- 17/08/2023 (REV: C02) SITEWIDE COMBINED M&E SERVICES LAYOUT DATED 13 JULY 2023
- SITE PLAN-P17
- PROPOSED PLANTING PLAN-P06
- 06/09/23 ECOLOGICAL ENHANCEMENT AND MANAGEMENT PLAN REV C02
- EVLINE 18.8.2023
- 16/08/23 FORDWAY DUST MANAGEMENT PLAN RV 2 DATED 10 AUGUST 2023 REDACTED
- 15/08/23 ENVIRONMENTAL MANAGEMENT PLAN (EMP0 - PEP PART 3 REDACTED
- EVLINE CHARGE POINT
- ENVIRONMENTAL MANAGEMENT PLAN PART 3 1.8.2023 REDACTED
- 28/06/23 ENVIRONMENTAL MANAGEMENT PLAN (EMP) PEP PART 3
- 28/06/23 LETTER RE SUDS PLANNING CONDITIONS.
- FORDWAY DUST MANAGEMENT PLAN 1.6.23 REDACTED
- FORDWAY INDUSTRIAL BOARD REMOVAL REDACTED
- FORDWAY METHOD OF STATEMENT REDACTED
- FORDWAY DEMOLITION MAR 23 REDACTED
- FORDWAY METHOD STATEMENT EG23159 REDACTED
- FORDWAY HORIZON TASK SHEET 3 CEMENT PANELS REDACTED
- FORDWAY HORIZON TASK SHEET 1 FLOOR TILE REDACTED
- FORDWAY HORIZON TASK SHEET 2 BITUMEN REMOVAL REDACTED
- FORDWAY RISK ASSESSMENT CEMENT PANEL REMOVAL REDACTED
- FORDWAY RISK ASSESSMENT H3839 BITUMEN REMOVAL REDACTED
- FORDWAY DEMOLITION SURVEY V2 NOV 22 REDACTED
- FORDWAY RISK ASSESSMENT FLOOR TILE REMOVAL REDACTED
- FORDWAY RISK ASSESSMENT AIB REMOVAL REDACTED
- SWEPT PATH ANALYSIS FOR A 16.480M ARTICULATED VEHICLE DATED 7 JUNE 2023
- SWEPT PATH ANALYSIS FOR A 10.210M CONSTRUCTION VEHICLE DATED 7 JUNE 2023
- 02/06/23 GROUND INVESTIGATION FACTUAL REPORT
- SPT HAMMER ENERGY TEST REPORT
- ENVIRONMENTAL MANAGEMENT PLAN (EMP) ? PEP PART 3
- TEST REPORT TRANSMITTAL
- 2 FINAL LOGS REDACTED
- 3 FINAL LOGS REDACTED
- ROUND 3 REPORT - GROUNDWATER MONITORING REDACTED
- ROUND 3 REPORT - GAS MONITORING REDACTED
- ROUND 2 REPORT - GROUNDWATER MONITORING REDACTED
- ROUND 2 REPORT - GAS MONITORING REDACTED
- ROUND 1 REPORT - GROUNDWATER MONITORING REDACTED
- ROUND 1 REPORT - GAS MONITORING REDACTED
- FORDWAY AP - FACTUAL REPORT REDACTED
- FINAL TP01-2 REPORT - SOAKAWAY TESTS REDACTED
- DYNAMIC CONE PENETROMETER TEST
- ANALYTICAL REPORT REDACTED
- ANALYTICAL REPORT REDACTED
- ANALYTICAL REPORT REDACTED
- ANALYTICAL REPORT REDACTED
- CONSTRUCTION MANAGEMENT PLAN
- SOUTH ELEVATION
- NOSCCZ SCC NO OBJECTION DECN NOTICE
- SITE SECTIONS DATED 28 APRIL 2023
- GENERAL ARRANGEMENT DATED 28 APRIL 2023
- BOUNDARY TREATMENT PLAN DATED 2 MAY 2023
- PROPOSED PLANTING PLAN DATED 28 APRIL 2023
- SITE SECTIONS DATED 28 APRIL 2023
- HOLMES MILLER PROJECT NOTE 5053 FORDWAY ALTERNATIVE PROVISION, STANMORE BRICKWOR
- METHOD STATEMENT
- FORDWAY CENTRE_ALTERNATIVE BRICKWORK CGI
- METHOD STATEMENT
- PROJECT NOTE 5053 FORDWAY ALTERNATIVE PROVISION 20.4.2023
- GROUND GAS TECHNICAL NOTE
- CAR PARK MANAGEMENT PLAN
- STAGE 3 ACOUSTIC STRATEGY REDACTED
- RIBA STAGE 3 ENGINEERING REPORT REDACTED
- SUSTAINABLE DESIGN + CONSTRUCTION STATEMENT
- GROUND FLOOR ABOVE GROUND DRAINAGE LAYOUT
- TREE REPORT REDACTED
- DRAINAGE STRATEGY AND MAINTENANCE STATEMENT REDACTED
- PART 1
- CONSTRUCTION MANAGEMENT PLAN
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- PART 2
- SITE PLAN
- EXTERNAL SPORTS
- EXISTING FLOOR PLAN
- GENERAL ARRANGEMENT PLAN
- GENERAL ARRANGEMENT PLAN LVL 01
- EXISTING ROOF PLAN
- GENERAL ARRANGEMENT ROOF PLAN
- EXISTING ELEVATIONS
- GA SECTIONS
- GA ELEVATIONS
- ENTRY - EAST ELEVATION CGI
- SOUTH ELEVATION CGI
- PROPOSED DRAINAGE PLAN
- REFUSE VEHICLE ACCESSING SITE
- CAR ACCESSING DROP-OFF BAY
- TRANSPORT NOTE REDACTED
- GROUND FLOOR SECURITY LAYOUT
- DAYLIGHTING ASSESSMENT REPORT
- MECHANICAL AND ELECTRICAL BUILDING SERVICES STAGE 3 REPORT
- EXTERNAL ELECTRICAL SERVICES LAYOUT
- COMBINED MECHANICAL AND ELECTRICAL SERVICES LAYOUT
- PLANTING STRATEGY
- BOUNDARY TREATMENT PLAN
- SITE SECTIONS
- ESSO PETROLEUM COMPANY LIMITED
- PROPOSED REDEVELOPMENT OF FORDWAY CENTRE ALTERNATIVE PROVISION
- SUPPORTING PLANNING STATEMENT
- ACKMIS ACK LETTER FOR MISC CONSULT
- TREE REPORT
- DAYLIGHTING ASSESSMENT REPORT
- STAGE 3 REPORT S2 INFORMATION
- PLANNING STATEMENT
- ECOLOGY APPRAISAL REDACTED
- APPLICATION FORM REDACTED
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you the drawings on every job in your area. 14 days free.
What this grant of permission means
Spelthorne granted permission on 5 May 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About less common application types
This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Pavement Outside North Surrey Family Centre Stanwell Road Ashford TW15 3DU
Proposed telecommunications installation: Proposed 15.0m Phase 8 Monopole C/W wrapround Cabinet at base and associated ancillary works.
-
93 Stanwell Road Ashford TW15 3EQ
Change of use from a 10 person HMO (Sui Generis) into a 14 person HMO (Sui Generis), with associated parking, boundary treatments, private amenity space and bin storage
-
Small domestic
-
56 Stanwell Road Ashford TW15 3DU
Proposed change of use from a 5 bed dwelling (use class C3) into a 9 bed HMO (Sui Generis) including a proposed single storey side and rear wrap around extension. As shown on drawing no's: Proposed Site Plan; Proposed Location Plan; Existing Elevations A02; Proposed Elevations A04; Existing Floor Plan A01 received 22.05.2023 and Proposed Floor Plans B03 received 05.07.2023
Refused Full applications Extension 18 docsSmall domestic -
88 Ashford Crescent Ashford TW15 3EB
Certificate of Lawfulness for the proposed loft conversion facilitated by the erection of 2 no. flank dormers and 4 no. rooflights. Erection of front porch.
Small domestic -
88 Ashford Crescent Ashford TW15 3EB
Erection of a single storey rear extension replacing existing conservatory. Garage conversion into habitable space with associated bricking up of garage door and replacement window. Roof alterations to tie side and rear extensions in together with insertion of 5 no. rooflights. 1 no. first floor front facing window and first floor rear facing doors with juliet balcony.
Small domestic
Other less common application types
In Spelthorne
-
26/00484/SCC Decided
Stanwell Quarry Stanwell Moor Road Stanwell Staines-upon-Thames TW19 7NY
Permanent retention of an existing recycling operation for the processing of construction and demolition waste, (this application is determined by Surrey County Council under their ref SCCRef-2026-0036)
-
26/00500/SCC Decided
Stanwell Quarry Stanwell Moor Road Stanwell Staines-upon-Thames TW19 7NY
Non compliance with Condition 1 (Plans), Condition 2 (Restoration Plan and Restoration end date) and Condition 4 (surface water management scheme) of planning permission ref: SP/17/00118/SCC dated 18 May 2018 to amend the surface water management scheme and restoration plans. (this application is determined by Surrey County Council under their ref SCCRef-2026-0037 - this record is for consultation only)
-
23/00519/SCC Granted
Land At Hithermoor Quarry Leylands Lane Stanwell Moor Staines-upon-Thames TW19 6AZ
Construction of an engineered clay cap to the closed landfill at Hithermoor Quarry utilising suitable imported clays with landscaping including the provision of a final soil layer without compliance with condition 2 of Planning Permission Ref: SP12/00487 dated 14 September 2015 to extend the time period for completing restoration of the clay cap.( Ref SCC 2023-0070)
-
25/01222/SCC Granted
Brett Aggregates Gravel Works Ashford Road Laleham Staines-upon-Thames TW18 1QF
Construction of a lorry parking area within the boundary of Queen Mary Quarry (retrospective) (this application is determined by Surrey County Council under their ref SCCRef-2025-0147)
-
24/01231/SCC Granted
Sunbury Fire Station Staines Road West Sunbury-on-Thames TW16 7BG
Redevelopment of the former Sunbury Fire Station site for a mixed-use hub incorporating Class E and Class F1 uses including library plus 12no. supported independent living units (use class C3) without compliance with condition 1 (plans and drawings) of planning permission ref: SP23/00557/SCC dated 28 November 2023 (this application is determined by Surrey County Council under their ref SCC_Ref_2024-0148).