Skip to content
PlanIndex Get alerts
Menu

Planning application

Fordway Centre Stanwell Road Ashford TW15 3DU

Granted Spelthorne 23/00281/SCC Surrey County Council Application

Works: Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of former Fordway Centre and erection of a two storey building to provide new classroom accommodation and staff facilities; construction of carparking spaces; associated hard and soft landscaping and associated works. (SCC 2023-0017)

As published by the council, reference 23/00281/SCC

Application record

Reference
23/00281/SCC
Type
Surrey County Council Application
Status
Decided
Decision
Granted As published: SBC No Object SCC Approval
Received
6 Mar 2023
Validated
6 Mar 2023
Decided
5 May 2023
Ward
Ashford North And Stanwell South
Parish
Stanwell And Stanwell Moor ED
Decision by
Delegated Decision
Postcode
TW15 3DU

Timeline

Dates from the published record

  1. 6 Mar 2023

    Received by Spelthorne

  2. 5 May 2023

    Decision issued: SBC No Object SCC Approval

  3. 14 Sep 2026

    Added to PlanIndex

Documents

The council's own list, drawings first

123 documents on file for this application

Drawings (46)

  • Proposed drainage plan dated june 24 Oct 2023
  • Proposed planting plan dated april 24 Oct 2023
  • Proposed planting 08 Sep 2023
  • Proposed planting plan dated april 04 May 2023
  • Proposed drainage plan 13 Mar 2023
  • Ground floor above ground drainage layout 31 Mar 2023
  • General arrangement plan 13 Mar 2023
  • General arrangement plan lvl 13 Mar 2023
  • Ground floor security layout 13 Mar 2023
  • Elevations dated april 24 Oct 2023
  • South elevation 05 Jun 2023
  • Elevations 13 Mar 2023
  • East elevation cgi 13 Mar 2023
  • South elevation cgi 13 Mar 2023
  • Site sections dated april 24 Oct 2023
  • Site sections dated april 04 May 2023
  • Site sections dated april 04 May 2023
  • Sections 13 Mar 2023
  • Site sections 13 Mar 2023
  • General arrangement roof plan 13 Mar 2023
  • Fordway ap dated february 24 Oct 2023
  • Exceedance flow plan dated june 24 Oct 2023
  • Site 08 Sep 2023
  • Site plan 13 Mar 2023
  • External sports 13 Mar 2023
  • Fordway centre alternative brickwork cgi 03 May 2023
  • Boundary treatment plan dated may 24 Oct 2023
  • General arrangement dated april 24 Oct 2023
  • Standard draiange construction details sheet dated june 24 Oct 2023
  • Standard drainage construction details sheet june 24 Oct 2023
  • Standard drainage construction details sheet dated june 24 Oct 2023
  • Pavement construction details dated june 24 Oct 2023
  • Sitewide combined m&e services layout dated july 11 Sep 2023
  • Swept path analysis for a articulated vehicle dated june 12 Jun 2023
  • Swept path analysis for a construction vehicle dated june 12 Jun 2023
  • General arrangement dated april 04 May 2023
  • Boundary treatment plan dated may 04 May 2023
  • Refuse vehicle accessing site 13 Mar 2023
  • Car accessing drop-off bay 13 Mar 2023
  • External electrical services layout 13 Mar 2023
  • Combined mechanical and electrical services layout 13 Mar 2023
  • Boundary treatment plan 13 Mar 2023
  • Fieldwork location plan dated february 24 Oct 2023
  • Existing floor plan 13 Mar 2023
  • Existing elevations 13 Mar 2023
  • Existing roof plan 13 Mar 2023

Everything on file (123)

  • DELEGATED REPORT UPDATED 24.6.20 Officers Report · 22 Aug 2024
  • SCC DECISION NOTICE Decision Notice · 03 Nov 2023
  • SITE SECTIONS DATED 28 APRIL 2023 Plans - Other · 24 Oct 2023
  • PROPOSED PLANTING PLAN DATED 28 APRIL 2023 Plans - Other · 24 Oct 2023
  • BOUNDARY TREATMENT PLAN DATED 2 MAY 2023 Plans - Other · 24 Oct 2023
  • GENERAL ARRANGEMENT DATED 28 APRIL 2023 Plans - Other · 24 Oct 2023
  • 02/06/23 GROUND INVESTIGATION FACTUAL REPORT Planning Statement · 24 Oct 2023
  • FIELDWORK LOCATION PLAN DATED FEBRUARY 2023 Plans - Other · 24 Oct 2023
  • DR001 FORDWAY AP DATED FEBRUARY 2023 Plans - Site Layout · 24 Oct 2023
  • GA ELEVATIONS DATED 27 APRIL 2023 Plans - Elevations · 24 Oct 2023
  • TRAIL PIT RECORD TRL02 02 JUNE 2023 Environmental Statement · 24 Oct 2023
  • PROPOSED DRAINAGE PLAN DATED 23 JUNE 2023 Plans - Site Layout · 24 Oct 2023
  • EXCEEDANCE FLOW PLAN DATED 23 JUNE 2023 Plans - Site Layout · 24 Oct 2023
  • STANDARD DRAIANGE CONSTRUCTION DETAILS SHEET 2 DATED 23 JUNE 2023 Plans - Other · 24 Oct 2023
  • STANDARD DRAINAGE CONSTRUCTION DETAILS SHEET 3 23 JUNE 23 Plans - Other · 24 Oct 2023
  • STANDARD DRAINAGE CONSTRUCTION DETAILS SHEET 4 DATED 23 JUNE 2023 Plans - Other · 24 Oct 2023
  • PAVEMENT CONSTRUCTION DETAILS DATED 23 JUNE 2023 Plans - Other · 24 Oct 2023
  • DESIGN CALCULATIONS REV P3 28 JUNE 2023 Planning Statement · 24 Oct 2023
  • 17/08/2023 (REV: C02) SITEWIDE COMBINED M&E SERVICES LAYOUT DATED 13 JULY 2023 Plans - Other · 11 Sep 2023
  • SITE PLAN-P17 Plans - Other · 08 Sep 2023
  • PROPOSED PLANTING PLAN-P06 Plans - Other · 08 Sep 2023
  • 06/09/23 ECOLOGICAL ENHANCEMENT AND MANAGEMENT PLAN REV C02 Environmental Statement · 08 Sep 2023
  • EVLINE 18.8.2023 Other Documents · 08 Sep 2023
  • 16/08/23 FORDWAY DUST MANAGEMENT PLAN RV 2 DATED 10 AUGUST 2023 REDACTED Environmental Statement · 17 Aug 2023
  • 15/08/23 ENVIRONMENTAL MANAGEMENT PLAN (EMP0 - PEP PART 3 REDACTED Environmental Statement · 17 Aug 2023
  • EVLINE CHARGE POINT Planning Statement · 17 Aug 2023
  • ENVIRONMENTAL MANAGEMENT PLAN PART 3 1.8.2023 REDACTED Other Documents · 07 Aug 2023
  • 28/06/23 ENVIRONMENTAL MANAGEMENT PLAN (EMP) PEP PART 3 Environmental Statement · 04 Jul 2023
  • 28/06/23 LETTER RE SUDS PLANNING CONDITIONS. Correspondence · 04 Jul 2023
  • FORDWAY DUST MANAGEMENT PLAN 1.6.23 REDACTED Other Documents · 20 Jun 2023
  • FORDWAY INDUSTRIAL BOARD REMOVAL REDACTED Other Documents · 20 Jun 2023
  • FORDWAY METHOD OF STATEMENT REDACTED Other Documents · 20 Jun 2023
  • FORDWAY DEMOLITION MAR 23 REDACTED Other Documents · 20 Jun 2023
  • FORDWAY METHOD STATEMENT EG23159 REDACTED Other Documents · 20 Jun 2023
  • FORDWAY HORIZON TASK SHEET 3 CEMENT PANELS REDACTED Other Documents · 20 Jun 2023
  • FORDWAY HORIZON TASK SHEET 1 FLOOR TILE REDACTED Other Documents · 20 Jun 2023
  • FORDWAY HORIZON TASK SHEET 2 BITUMEN REMOVAL REDACTED Other Documents · 20 Jun 2023
  • FORDWAY RISK ASSESSMENT CEMENT PANEL REMOVAL REDACTED Other Documents · 20 Jun 2023
  • FORDWAY RISK ASSESSMENT H3839 BITUMEN REMOVAL REDACTED Other Documents · 20 Jun 2023
  • FORDWAY DEMOLITION SURVEY V2 NOV 22 REDACTED Other Documents · 20 Jun 2023
  • FORDWAY RISK ASSESSMENT FLOOR TILE REMOVAL REDACTED Other Documents · 20 Jun 2023
  • FORDWAY RISK ASSESSMENT AIB REMOVAL REDACTED Other Documents · 20 Jun 2023
  • SWEPT PATH ANALYSIS FOR A 16.480M ARTICULATED VEHICLE DATED 7 JUNE 2023 Plans - Other · 12 Jun 2023
  • SWEPT PATH ANALYSIS FOR A 10.210M CONSTRUCTION VEHICLE DATED 7 JUNE 2023 Plans - Other · 12 Jun 2023
  • 02/06/23 GROUND INVESTIGATION FACTUAL REPORT Other Documents · 08 Jun 2023
  • SPT HAMMER ENERGY TEST REPORT Other Documents · 08 Jun 2023
  • ENVIRONMENTAL MANAGEMENT PLAN (EMP) ? PEP PART 3 Environmental Statement · 08 Jun 2023
  • TEST REPORT TRANSMITTAL Environmental Statement · 08 Jun 2023
  • 2 FINAL LOGS REDACTED Other Documents · 08 Jun 2023
  • 3 FINAL LOGS REDACTED Other Documents · 08 Jun 2023
  • ROUND 3 REPORT - GROUNDWATER MONITORING REDACTED Other Documents · 08 Jun 2023
  • ROUND 3 REPORT - GAS MONITORING REDACTED Other Documents · 08 Jun 2023
  • ROUND 2 REPORT - GROUNDWATER MONITORING REDACTED Other Documents · 08 Jun 2023
  • ROUND 2 REPORT - GAS MONITORING REDACTED Other Documents · 08 Jun 2023
  • ROUND 1 REPORT - GROUNDWATER MONITORING REDACTED Other Documents · 08 Jun 2023
  • ROUND 1 REPORT - GAS MONITORING REDACTED Other Documents · 08 Jun 2023
  • FORDWAY AP - FACTUAL REPORT REDACTED Environmental Statement · 08 Jun 2023
  • FINAL TP01-2 REPORT - SOAKAWAY TESTS REDACTED Other Documents · 08 Jun 2023
  • DYNAMIC CONE PENETROMETER TEST Other Documents · 08 Jun 2023
  • ANALYTICAL REPORT REDACTED Other Documents · 08 Jun 2023
  • ANALYTICAL REPORT REDACTED Other Documents · 08 Jun 2023
  • ANALYTICAL REPORT REDACTED Other Documents · 08 Jun 2023
  • ANALYTICAL REPORT REDACTED Other Documents · 08 Jun 2023
  • CONSTRUCTION MANAGEMENT PLAN Other Documents · 05 Jun 2023
  • SOUTH ELEVATION Plans - Elevations · 05 Jun 2023
  • NOSCCZ SCC NO OBJECTION DECN NOTICE Decision Notice · 05 May 2023
  • SITE SECTIONS DATED 28 APRIL 2023 Plans - Site Layout · 04 May 2023
  • GENERAL ARRANGEMENT DATED 28 APRIL 2023 Plans - Other · 04 May 2023
  • BOUNDARY TREATMENT PLAN DATED 2 MAY 2023 Plans - Other · 04 May 2023
  • PROPOSED PLANTING PLAN DATED 28 APRIL 2023 Plans - Other · 04 May 2023
  • SITE SECTIONS DATED 28 APRIL 2023 Plans - Combined · 04 May 2023
  • HOLMES MILLER PROJECT NOTE 5053 FORDWAY ALTERNATIVE PROVISION, STANMORE BRICKWOR Design and Access Statement · 03 May 2023
  • METHOD STATEMENT Planning Statement · 03 May 2023
  • FORDWAY CENTRE_ALTERNATIVE BRICKWORK CGI Drawing · 03 May 2023
  • METHOD STATEMENT Other Documents · 28 Apr 2023
  • PROJECT NOTE 5053 FORDWAY ALTERNATIVE PROVISION 20.4.2023 Other Documents · 28 Apr 2023
  • GROUND GAS TECHNICAL NOTE Other Documents · 28 Apr 2023
  • CAR PARK MANAGEMENT PLAN Parking Provision · 31 Mar 2023
  • STAGE 3 ACOUSTIC STRATEGY REDACTED Noise Statement · 31 Mar 2023
  • RIBA STAGE 3 ENGINEERING REPORT REDACTED Planning Statement · 31 Mar 2023
  • SUSTAINABLE DESIGN + CONSTRUCTION STATEMENT Planning Statement · 31 Mar 2023
  • GROUND FLOOR ABOVE GROUND DRAINAGE LAYOUT Plans - Site Layout · 31 Mar 2023
  • TREE REPORT REDACTED Arboricultural Statement · 31 Mar 2023
  • DRAINAGE STRATEGY AND MAINTENANCE STATEMENT REDACTED Drainage Assessment · 31 Mar 2023
  • PART 1 Design and Access Statement · 31 Mar 2023
  • CONSTRUCTION MANAGEMENT PLAN Other Documents · 16 Mar 2023
  • STANDARD CONSULTATION LETTER Consultation · 13 Mar 2023
  • STANDARD CONSULTATION LETTER Consultation · 13 Mar 2023
  • PART 2 Design and Access Statement · 13 Mar 2023
  • SITE PLAN Plans - Site Layout · 13 Mar 2023
  • EXTERNAL SPORTS Plans - Site Layout · 13 Mar 2023
  • EXISTING FLOOR PLAN Plans - Site Layout · 13 Mar 2023
  • GENERAL ARRANGEMENT PLAN Plans - Floor Plans · 13 Mar 2023
  • GENERAL ARRANGEMENT PLAN LVL 01 Plans - Floor Plans · 13 Mar 2023
  • EXISTING ROOF PLAN Plans - Site Layout · 13 Mar 2023
  • GENERAL ARRANGEMENT ROOF PLAN Plans - Floor Plans · 13 Mar 2023
  • EXISTING ELEVATIONS Plans - Elevations · 13 Mar 2023
  • GA SECTIONS Plans - Elevations · 13 Mar 2023
  • GA ELEVATIONS Plans - Elevations · 13 Mar 2023
  • ENTRY - EAST ELEVATION CGI Plans - Other · 13 Mar 2023
  • SOUTH ELEVATION CGI Plans - Other · 13 Mar 2023
  • PROPOSED DRAINAGE PLAN Plans - Other · 13 Mar 2023
  • REFUSE VEHICLE ACCESSING SITE Plans - Other · 13 Mar 2023
  • CAR ACCESSING DROP-OFF BAY Plans - Other · 13 Mar 2023
  • TRANSPORT NOTE REDACTED Transport Assessment · 13 Mar 2023
  • GROUND FLOOR SECURITY LAYOUT Plans - Floor Plans · 13 Mar 2023
  • DAYLIGHTING ASSESSMENT REPORT Lighting Assessment · 13 Mar 2023
  • MECHANICAL AND ELECTRICAL BUILDING SERVICES STAGE 3 REPORT Other Documents · 13 Mar 2023
  • EXTERNAL ELECTRICAL SERVICES LAYOUT Plans - Other · 13 Mar 2023
  • COMBINED MECHANICAL AND ELECTRICAL SERVICES LAYOUT Plans - Other · 13 Mar 2023
  • PLANTING STRATEGY Plans - Other · 13 Mar 2023
  • BOUNDARY TREATMENT PLAN Plans - Other · 13 Mar 2023
  • SITE SECTIONS Plans - Other · 13 Mar 2023
  • ESSO PETROLEUM COMPANY LIMITED Correspondence · 13 Mar 2023
  • PROPOSED REDEVELOPMENT OF FORDWAY CENTRE ALTERNATIVE PROVISION Planning Statement · 13 Mar 2023
  • SUPPORTING PLANNING STATEMENT Planning Statement · 13 Mar 2023
  • ACKMIS ACK LETTER FOR MISC CONSULT Correspondence · 08 Mar 2023
  • TREE REPORT Arboricultural Statement · 06 Mar 2023
  • DAYLIGHTING ASSESSMENT REPORT Lighting Assessment · 06 Mar 2023
  • STAGE 3 REPORT S2 INFORMATION Other Documents · 06 Mar 2023
  • PLANNING STATEMENT Planning Statement · 06 Mar 2023
  • ECOLOGY APPRAISAL REDACTED Other Documents · 06 Mar 2023
  • APPLICATION FORM REDACTED Application Form · 06 Mar 2023

Watch members (£5 a month) open the document list from here.

Open the documents

Working a patch? Trade sends you the drawings on every job in your area. 14 days free.

What this grant of permission means

Spelthorne granted permission on 5 May 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About less common application types

This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Pavement Outside North Surrey Family Centre Stanwell Road Ashford TW15 3DU

    21/01108/T56 Submitted 6 Jul 2021 100 yards away

    Proposed telecommunications installation: Proposed 15.0m Phase 8 Monopole C/W wrapround Cabinet at base and associated ancillary works.

    Refused Telecoms Drawings (1) 13 docs
  • 93 Stanwell Road Ashford TW15 3EQ

    26/00114/FUL Submitted 5 Feb 2026 100 yards away

    Change of use from a 10 person HMO (Sui Generis) into a 14 person HMO (Sui Generis), with associated parking, boundary treatments, private amenity space and bin storage

    Refused Full applications Drawings (11) 29 docs
  • 70 Ashford Crescent Ashford TW15 3EB

    20/00005/HOU Submitted 7 Jan 2020 150 yards away

    Erection of an outbuilding.

    Granted Householder 10 docs
    Small domestic
  • 56 Stanwell Road Ashford TW15 3DU

    23/00639/FUL Submitted 22 May 2023 150 yards away

    Proposed change of use from a 5 bed dwelling (use class C3) into a 9 bed HMO (Sui Generis) including a proposed single storey side and rear wrap around extension. As shown on drawing no's: Proposed Site Plan; Proposed Location Plan; Existing Elevations A02; Proposed Elevations A04; Existing Floor Plan A01 received 22.05.2023 and Proposed Floor Plans B03 received 05.07.2023

    Refused Full applications Extension 18 docs
    Small domestic
  • 88 Ashford Crescent Ashford TW15 3EB

    25/01197/CPD Submitted 1 Oct 2025 150 yards away

    Certificate of Lawfulness for the proposed loft conversion facilitated by the erection of 2 no. flank dormers and 4 no. rooflights. Erection of front porch.

    Granted Lawful development Extension Loft or dormer Drawings (7) 14 docs
    Small domestic
  • 88 Ashford Crescent Ashford TW15 3EB

    25/01198/HOU Submitted 1 Oct 2025 150 yards away

    Erection of a single storey rear extension replacing existing conservatory. Garage conversion into habitable space with associated bricking up of garage door and replacement window. Roof alterations to tie side and rear extensions in together with insertion of 5 no. rooflights. 1 no. first floor front facing window and first floor rear facing doors with juliet balcony.

    Granted Householder Extension Loft or dormer +2 Drawings (7) 14 docs
    Small domestic

In Spelthorne

  • 26/00484/SCC Decided

    Stanwell Quarry Stanwell Moor Road Stanwell Staines-upon-Thames TW19 7NY

    Permanent retention of an existing recycling operation for the processing of construction and demolition waste, (this application is determined by Surrey County Council under their ref SCCRef-2026-0036)

    Received 6 May, published by the council 30 Jul 2026 Other
  • 26/00500/SCC Decided

    Stanwell Quarry Stanwell Moor Road Stanwell Staines-upon-Thames TW19 7NY

    Non compliance with Condition 1 (Plans), Condition 2 (Restoration Plan and Restoration end date) and Condition 4 (surface water management scheme) of planning permission ref: SP/17/00118/SCC dated 18 May 2018 to amend the surface water management scheme and restoration plans. (this application is determined by Surrey County Council under their ref SCCRef-2026-0037 - this record is for consultation only)

    Received 7 May, published by the council 30 Jul 2026 Other
  • 23/00519/SCC Granted

    Land At Hithermoor Quarry Leylands Lane Stanwell Moor Staines-upon-Thames TW19 6AZ

    Construction of an engineered clay cap to the closed landfill at Hithermoor Quarry utilising suitable imported clays with landscaping including the provision of a final soil layer without compliance with condition 2 of Planning Permission Ref: SP12/00487 dated 14 September 2015 to extend the time period for completing restoration of the clay cap.( Ref SCC 2023-0070)

    Received 25 Apr, published by the council 21 Aug 2026 Other
  • 25/01222/SCC Granted

    Brett Aggregates Gravel Works Ashford Road Laleham Staines-upon-Thames TW18 1QF

    Construction of a lorry parking area within the boundary of Queen Mary Quarry (retrospective) (this application is determined by Surrey County Council under their ref SCCRef-2025-0147)

    Received 6 Oct, published by the council 11 Aug 2026 Other
  • 24/01231/SCC Granted

    Sunbury Fire Station Staines Road West Sunbury-on-Thames TW16 7BG

    Redevelopment of the former Sunbury Fire Station site for a mixed-use hub incorporating Class E and Class F1 uses including library plus 12no. supported independent living units (use class C3) without compliance with condition 1 (plans and drawings) of planning permission ref: SP23/00557/SCC dated 28 November 2023 (this application is determined by Surrey County Council under their ref SCC_Ref_2024-0148).

    Received 16 Oct, published by the council 21 Aug 2026 Other