Planning application

Southampton To London Pipeline Project

Granted Spelthorne 23/00271/DEV Development Consent Order (DC)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Changes to Approved Management Documents, under DCO Schedule 2 Requirement 20: Relating to Crossing of Shepperton Road (identified as TC36 in the DCO)

As published by the council, reference 23/00271/DEV

Application record

Reference
23/00271/DEV
Type
Development Consent Order (DC)
Status
Decided
Decision
Granted As published: Condition Discharged
Received
1 Mar 2023
Validated
13 Mar 2023
Decided
12 Apr 2023
Ward
Staines
Parish
Staines ED
Decision by
Delegated Decision

Site history

Applications at this address on the Spelthorne register

This site has had 8 applications since 2021: 8 approved, 0 refused.

  • 21/00909/DEV Granted

    Southampton To London Pipeline Project

    DCO for Written Scheme of Investigation - DCO Sch 2 Requirement No 11 (Archaeology)

    Decided 14 Jul 2021
  • 21/00892/DEV Granted

    Southampton To London Pipeline Project

    DCO for Community Engagement Plan (CEP) - DCO Sch 2 Requirement No. 15

    Decided 14 Jul 2021
  • 21/00893/DEV Granted

    Southampton To London Pipeline Project

    DCO for Ashford Road Site Specific Plan - DCO Sch 2 Requirement No 17

    Decided 14 Jul 2021
  • 21/00890/DEV Granted

    Southampton To London Pipeline Project

    DCO for Surface and Foul Water Drainage Plan (SFWDP) - DCO Sch 2 Requirement No 9

    Decided 14 Jul 2021
  • 21/00889/DEV Granted

    Southampton To London Pipeline Project

    DCO for Construction Traffic Management Plan (CTMP) - DCO Sch 2 Requirement No 7

    Decided 12 Aug 2021
  • 21/00891/DEV Granted

    Southampton To London Pipeline Project

    DCO for Landscape and Ecological Management Plan (LEMP) - DCO Sch 2 Requirement No 12

    Decided 12 Aug 2021
  • 21/00888/DEV Granted

    Southampton To London Pipeline Project

    DCO for Construction Environmental Management Plan (CEMP) - DCO Sch 2 Requirement No 6

    Decided 12 Aug 2021

Timeline

Dates from the published record

  1. 1 Mar 2023

    Received by Spelthorne

  2. 13 Mar 2023

    Validated

    Checked as complete and ready for consideration.

  3. 12 Apr 2023

    Decision issued: Condition Discharged

  4. 21 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

  • COVERING LETTER Correspondence · 02 Mar 2023
  • REDACTED APPLICATION FORM Application Form · 02 Mar 2023
  • CODE OF CONSTRUCTION PRACTICE (REVISION 7) FEB 23 Other Documents · 02 Mar 2023
  • CEMP REVISION 3 FEBRUARY 23 Other Documents · 02 Mar 2023
  • CEMP APPENDIX B WATER MANAGEMENT PLAN REVISION 4 FEBRUARY 23 Other Documents · 02 Mar 2023
  • CEMP APPENDIX D DUST MANAGEMENT PLAN REVISION 3 FEBRUARY 23 Other Documents · 02 Mar 2023
  • CEMP APPENDIX E NOISE AND VIBRATION MANAGEMENT PLAN REVISION 3 FEBRUARY 23 Other Documents · 02 Mar 2023
  • CONSTRUCTION TRAFFIC MANAGEMENT PLAN REVISION 4 FEBRUARY 23 Other Documents · 02 Mar 2023
  • RETENTION AND REMOVAL PLAN SHEET 50 REVISION 3 Plans - Other · 02 Mar 2023
  • REINSTATEMENT PLAN SHEET 50 REVISION A Plans - Other · 02 Mar 2023

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Spelthorne granted permission on 12 April 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.