Planning application
Second And Third Floor Anchor Brewhouse 50 Shad Thames London Southwark SE1 2LY
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Lawful Development Certificate (Existing) relating to the use of the building as offices Lower and Upper Floor, The Malt Mill, Anchor Brewhouse, 50 Shad Thames, SE1 2YB Use of the 2nd and 3rd floors as offices (Class E(g)(i))
As published by the council, reference 26/AP/2699
Application record
- Reference
- 26/AP/2699
- Status
- Under consideration/assessment
- Received
- 11 Sep 2026
- Validated
- 24 Sep 2026
- Postcode
- SE1 2LY
Timeline
Dates from the published record
-
11 Sep 2026
Received by Southwark
-
24 Sep 2026
Validated
Checked as complete and ready for consideration.
-
25 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 19 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Southwark took a median of 52 days over the applications it decided in the last year.
What happens while it is decided
This application is with Southwark for determination, against a statutory target of eight weeks. Over the last year Southwark's median decision took 52 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Southwark's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Butlers Wharf West 40 Shad Thames London Southwark SE1 2YA
Non material amendment of planning permission ref. no. 19/AP/5757 dated 27/12/2019 - To the coping stone detail on the front (Shad Thames elevation) and rear (River Thames elevation), fit a zinc capping detail to match the roof and keep the building water tight. To penthouse 19, there are external blinds that sit above the single pitched glazing. These blinds no longer work and have been discontinued. It is proposed to remove them and supply and fit solar reflective film to the glazing. By adding the zinc capping detail to the coping stone detail it will assist in keeping the building water tight and be in keeping with the new roof. By removing the external blinds to the windows of penthouse 19 and fitting solar reflective film, it will remove any future maintenance requirements, as access is not possible.
Withdrawn Conditions Roofing Windows or glazing 7 docs -
Butlers Wharf West 40 Shad Thames London Southwark
To retain a zinc capping detail to the coping stone detail front (Shad Thames elevation) and rear (River Thames elevation) of Butler Wharf West, and to remove the external blinds that sit above the single pitched glazing to penthouse 19 and supply and fit solar reflective film to the glazing.
Granted Full applications Windows or glazing 15 docs -
Butlers Wharf West 40 Shad Thames London Southwark
Retrospective Listed Building Consent for fitting a zinc capping detail to the coping stone detail front (Shad Thames elevation) and rear (River Thames elevation) of Butler Wharf West, and to remove the external blinds that sit above the single pitched glazing to penthouse 19 and supply and fit solar reflective film to the glazing.
Granted Heritage and listed buildings Windows or glazing 16 docs -
37 Shad Thames London Southwark SE1 2NJ
Installation of 1 x replacement awning above the entrance on Shad Thames
Refused Advertising 10 docs -
37 Shad Thames London Southwark SE1 2NJ
The erection of 1 x replacement awning above the entrance on Shad Thames.
Refused Heritage and listed buildings 11 docs -
33 Eagle Wharf Court 59 Lafone Street London Southwark SE1 2LZ
Creation of a proposed additional bedroom and creation of an en-suite shower room for bedroom 1
Granted Heritage and listed buildings 10 docs