Skip to content
PlanIndex Get alerts
Menu

Planning application

Crowne House 56 - 58 Southwark Street London Southwark SE1 1UN

Awaiting decision Southwark 26/AP/2468 Minor application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Refurbishment of existing facade with an enlarged front entrance to provide enhanced arrival experience and DDA access.

As published by the council, reference 26/AP/2468

Application record

Reference
26/AP/2468
Type
Minor application
Status
Under consideration/assessment
Received
18 Aug 2026
Validated
25 Aug 2026
Ward
Borough & Bankside
Parish
Borough, Bankside And Walworth
Postcode
SE1 1UN

Timeline

Dates from the published record

  1. 18 Aug 2026

    Received by Southwark

  2. 25 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 26 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 20 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Southwark took a median of 52 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Anomaly Agent, registered in Torquay

Dissolved · incorporated 1994 · Torquay

2 applications on PlanIndex · across 2 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Southwark for determination, against a statutory target of eight weeks. Over the last year Southwark decided full applications in a median of 65 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • City Bridge House 57 Southwark Street London Southwark SE1 1RU

    23/AP/2820 Submitted 6 Oct 2023 50 yards away

    The temporary change of use of the fourth floor at 57 Southwark Street from office (Class E) to a mixed-use office (Class E) and education (Class F1) use

    Withdrawn Full applications 17 docs
  • 38-42 Southwark Bridge Road London Southwark SE1 9EJ

    22/AP/4006 Submitted 23 Nov 2022 50 yards away

    90% historically approved · decision due ~23 Feb

    Demolition of the existing redundant office building (Class E) and the construction of a replacement building to deliver additional office (Class E) floorspace along with other associated works.

    Awaiting decision Full applications Demolition 153 docs
    Major scheme
  • Basement And Ground Floor Chocolate Factory 53 Southwark Street London Southwark SE1 1RU

    25/AP/2497 Submitted 1 Sep 2025 50 yards away

    92% historically approved · decision due ~28 Oct

    Display of two illuminated projecting signs, one illuminated menu box, and one hand-painted fascia sign to the Southwark Street frontage of the Menier Chocolate Factory. Projecting signs: One to the north elevation (retaining the existing bracket) and one to the west elevation (new bracket to match). Each is a circular 600mm diameter sign formed of 3mm stainless steel plate with a rolled 16mm stainless steel frame, finished satin black. Decorative gold-painted vine tendrils and eight forged three-dimensional vine leaves are set within the frame, with 50mm gold vinyl lettering applied. The signs are suspended from wall-mounted steel brackets with chain and strap fixings. Each bracket incorporates downward-facing LED lighting (610mm long, warm white 3000K, max. 299 cd/m?, 1650 lumens/m) aimed to illuminate the sign face. The underside of the signs is set 2.28m above pavement level. Fascia sign: Hand-painted lettering directly applied to the entablature above the main entrance. Letters are applied in consistent font, kerning and spacing, with no relief or illumination. Illuminated Menu Box (Adjacent to Ground Floor Entrance) Form and dimensions: A brass A4 menu box (397 x 310 x 50 mm). Fixing and support: Mounted adjacent to the main entrance. Fixings made into mortar joints only. Power cable fixed discreetly within mortar joints, colour-matched to adjacent mortar, and routed through the adjacent contemporary timber window frame to minimise impact on historic fabric. Illumination: Internally lit with warm white LED, providing subtle legibility without visual intrusion

    Awaiting decision Advertising Windows or glazing 8 docs
  • Basement And Ground Floor Chocolate Factory 53 Southwark Street London Southwark SE1 1RU

    25/AP/2495 Submitted 1 Sep 2025 50 yards away

    90% historically approved · decision due ~28 Oct

    External alterations to enable a restaurant and wine bar fit-out.

    Awaiting decision Full applications 72 docs
  • Basement And Ground Floor Chocolate Factory 53 Southwark Street London Southwark SE1 1RU

    25/AP/2496 Submitted 1 Sep 2025 50 yards away

    94% historically approved · decision due ~28 Oct

    Listed building consent for the internal and external alterations to the ground and basement levels of the Grade II listed Menier Chocolate Factory, 53 Southwark Street, to enable a restaurant and bar fit-out. External works comprise: Installation of two illuminated hanging signs and reinstated hand-painted fascia signage. Formation of a 350 x 350 mm powder-coated air-intake grille within the contemporary brick infill to the west elevation. Enclosure of the south-east lightwell with a new flat roof to form a storage room. Creation of a screened rear-terrace service area incorporating three Toshiba condensers on plinths behind a timber screen, together with associated refuse storage. Internal works include: Replacement of existing kitchen equipment and creation of a new open kitchen. Installation of new ventilation, extract, and air-conditioning systems. Installation of new vestibule doors. Bar joinery with wine fridges and shelving, a low wall enclosing the existing stair balustrade, and local ductwork boxing Joinery and finishes throughout, including painted walls and ceilings. Installation of decorative metal tiled ceiling panels to the basement. Addition of a new handrail to the basement stair. Reconfiguration and implementation of fire escape strategy, including escape routes. Installation of new lighting, data, security, and power systems. Relocation of existing electrical meters and boards, and addition of new fire-rated glazed screens. Retention, repair, and relocation of heritage assets including Dennison Kett & Co rolling shutters, brass floor wear plates, and two ornate floor lamps. Minor service penetrations are minimised and contained within the same wall or room to reduce impact on historic fabric. All interventions are localised and, where practicable, reversible. No demolition of principal listed fabric is proposed.

    Awaiting decision Heritage and listed buildings Extension Demolition +1 69 docs
  • 38-48 Southwark Bridge Road London Southwark SE1 9EJ

    26/AP/1201 Submitted 27 Apr 2026 50 yards away

    90% historically approved · decision due ~3 Sep

    Partial demolition, extension and change of use of existing building for coliving use with associated internal and external amenity space (Sui Generis), with flexible commercial space (Class E), associated landscaping, access and servicing, plant and equipment and all other associated works For information: The proposed building re-uses the existing part 5/ part 6 office building (27.40m AOD) with 2no. basement levels and extends it to part 6 storey/ part 10 storeys (40.28m AOD) with 2no.basement levels. The development as a whole comprises: - 395no. coliving (Sui Generis) units, including 10% wheelchair accessible units - 1,626sqm (GIA) of shared amenity space across multiple floors - 1,928sqm (GIA) of flexible commercial floorspace at ground floor and basement level. - Provision of no.297 long-stay cycle parking spaces, including: 5% accessible (minimum of no.15 spaces), 20% standard Sheffield stands (minimum of no.60 spaces) - A BREEAM Excellent targeted development. - A car-free development - Off-street servicing to the rear of the Site for the shared living units and on-street loading to serve the commercial spaces

    Awaiting decision Full applications Extension Demolition 131 docs
    Major scheme

In Southwark

  • 26/AP/2734 Awaiting decision

    Flat D 116 Barry Road London Southwark SE22 0HP

    Construction of a rear dormer extension with juliet balcony and the addition of three roof lights to the front roof slope.

    Received 15 Sep, published by the council 11 Oct 2026 Full applications
  • 26/AP/0663 Granted

    Burgess Business Park Parkhouse Street London Southwark SE5 7TJ

    Construction of new employment floorspace to provide Class E(g)(iii) and Class B8 floorspace, together with associated external works including the installation of a security cabin and replacement boundary fencing.

    Received 5 Mar, published by the council 28 Jul 2026 Full applications
  • 26/AP/0565 Withdrawn

    Church Of St Thomas More 380 Lordship Lane London Southwark SE22 8ND

    Landscaping works to provide accessible access from the church carpark to the John Paul Community Hall and Parish Office.

    Received 25 Feb, published by the council 28 Jul 2026 Full applications
  • 26/AP/2659 Awaiting decision

    23B Adys Road London Southwark SE15 4DX

    Rear dormer with 2no. rooflights on front slope plus a roof terrace over part of rear addition roof

    8 Sep 2026 Full applications
  • 26/AP/2660 Awaiting decision

    Vintage Yard 59 - 63 Bermondsey Street London Southwark SE1 3XF

    Installation of replacement rooftop and replacement low level roof plant, elevation alterations to include the removal of existing entrance gate and refurbishment of existing front door.

    8 Sep 2026 Full applications