Planning application
5 Alma Grove London Southwark SE1 5PY
Works: Trees
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Works to tree with a TCA: T1 & T2 Large prunus trees in rear garden (left hand boundary) - Reduce height of both by approx. 1 third. Thin internal growth and remove major dead wood and any crossing/rubbing branches T3 Black maple on left hand side next to prunus tree - Reduce height by approx. 1-2m T4 Yucca tree - Reduce by 1 third. Ensure no growth overhangs neighbour's garden Justifications - Trees have not been maintained for years and have blocked garden of all light. Routine maintenance
As published by the council, reference 26/AP/2420
Application record
- Reference
- 26/AP/2420
- Status
- Awaiting decision
- Received
- 12 Aug 2026
- Validated
- 13 Aug 2026
- Postcode
- SE1 5PY
Timeline
Dates from the published record
-
12 Aug 2026
Received by Southwark
-
13 Aug 2026
Validated
Checked as complete and ready for consideration.
-
14 Aug 2026
Added to PlanIndex
-
19 Aug 2026
Status changed to Awaiting decision
Previously Under consideration/assessment.
-
Decision
Awaiting decision
Decision expected by 8 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Southwark took a median of 52 days over the applications it decided in the last year.
What happens while it is decided
The process from here
This application is with Southwark for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About this record
Reading the register
This page mirrors an entry on the statutory planning register that Southwark is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.
Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.
Nearby applications
Within 500 metres
-
12 Alma Grove London Southwark SE1 5PY
95% historically approved · decision due ~4 Aug
Replacement of all existing windows and doors with double-glazed units
Decided Windows or glazing -
7 Alma Grove London Southwark SE1 5PY
95% historically approved · decision due ~16 Sep
Erection of a rear ground floor side extension with a framed glass roof and bi-folding rear doors.
Awaiting decision Extension Windows or glazing -
26 Reverdy Road London Southwark SE1 5QE
T1 Multi stemmed Bay Rear LHB. Crown reduction - To reduce the overall height by up to 1.5 metres and to trim and shape the remaining canopy to create a more compact and balanced form. To include removing and poisoning one self seeded Schedule 9 Tree of Heaven adjacent to Bay.T2 Cherry Rear LHB. Crown Reduction - To reduce the height and radial spread of the canopy by up to 2 metres and to shape accordingly. Remove major deadwood.T3 Cherry LaurelRear LHB. Crown reduction - To reduce the overall height by up to 1.5 metres and to trim and shape the remaining canopy to create a more compact and balanced form.
Granted Trees 8 docs -
18 Reverdy Road London Southwark SE1 5QE
Construction of side rear infill extension and reinstatement of rear sash windows.
Granted Householder Extension Windows or glazing 24 docsDomestic -
28 Reverdy Road London Southwark SE1 5QE
Replacement of windows to front elevation with timber sash design.
Granted Householder Windows or glazing 14 docsDomestic -
35 Alma Grove London Southwark SE1 5PY
Construction of ground floor side-rear extension, first floor rear extension above existing outrigger and installation of side elevation window.
Granted Householder Extension Windows or glazing 14 docsDomestic