Planning application

Butlers Wharf Building 36 Shad Thames London Southwark SE1 2YE

Granted Southwark 26/AP/0821 Minor application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of air-conditioning equipment at roof level and first-floor office refurbishment

As published by the council, reference 26/AP/0821

Application record

Reference
26/AP/0821
Type
Minor application
Status
Granted
Decision
Granted As published: Minor - GRANTED
Received
23 Mar 2026
Validated
27 Mar 2026
Decided
14 May 2026
Ward
North Bermondsey
Parish
Bermondsey And Rotherhithe
Decision by
Delegated Panel - Simple
Postcode
SE1 2YE

Site history

Applications at this address on the Southwark register

This site has had 2 applications since 2026: 2 approved, 0 refused.

  • 26/AP/0822 Granted

    Butlers Wharf Building 36 Shad Thames London Southwark SE1 2YE

    Listed building consent for the installation of air-conditioning equipment at roof level and first-floor office refurbishment

    Decided 15 May 2026 Heritage and listed buildings

Timeline

Dates from the published record

  1. 23 Mar 2026

    Received by Southwark

  2. 27 Mar 2026

    Validated

    Checked as complete and ready for consideration.

  3. 14 May 2026

    Decision issued: Minor - GRANTED

  4. 10 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

P+P Architects Agent, an architecture practice

36 applications on PlanIndex · across 9 councils · 80% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

23 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Southwark granted permission on 14 May 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Butlers Wharf Building 36 Shad Thames London Southwark SE1 2YE

    26/AP/0822 Submitted 23 Mar 2026 50 yards away

    Listed building consent for the installation of air-conditioning equipment at roof level and first-floor office refurbishment

    Granted Heritage and listed buildings 23 docs
  • Suite 309 Butlers Wharf Building 36 Shad Thames London Southwark SE1 2YE

    20/AP/3124 Submitted 26 Oct 2020 50 yards away

    Internal remodelling of the apartment, removal and replacement of modern partitions, cupboards, doors, kitchen units and bathroom suite.

    Granted Heritage and listed buildings 12 docs
  • Suite 204 & 205 Butlers Wharf Building 36 Shad Thames London Southwark SE1 2YE

    21/AP/3533 Submitted 8 Oct 2021 50 yards away

    Details of Condition 5 (Detail drawings), as required by planning permission 20/AP/2963 (Listed building consent for amalgamation of Suites 204 & 205 by creating an opening in the modern fabric and reconfiguring the suites.)

    Granted Conditions 5 docs
  • Cardamom Building 31 Shad Thames London Southwark SE1 2YR

    26/AP/1342 Submitted 11 May 2026 50 yards away

    Listed building consent for the installation of five cubicles within the existing basement space, connection of waste drainage to the existing waste pipe via a pumped system to avoid excavation, installation of a bicycle rack, and formation of a bicycle ramp adjacent to the existing modern aluminium staircase.

    Granted Heritage and listed buildings 23 docs
  • Cardamom Building 31 Shad Thames London Southwark SE1 2YR

    21/AP/2641 Submitted 26 Jul 2021 50 yards away

    Listed building consent for Installation of new signage comprising of 2 externally illuminated projection signs to replace existing 1 non illuminated awning to replace existing

    Granted Heritage and listed buildings 20 docs
  • 109 Cardamom Building 31 Shad Thames London Southwark SE1 2YR

    20/AP/1747 Submitted 25 Jun 2020 50 yards away

    Internal alterations to internal stud partition to re-configure cupboards and doors, removal of pre-fabricated bathroom pod and re-fitting of bathroom, associated decoration and joinery.

    Granted Heritage and listed buildings 10 docs

In Southwark

  • 26/AP/2734 Awaiting decision

    Flat D 116 Barry Road London Southwark SE22 0HP

    Construction of a rear dormer extension with juliet balcony and the addition of three roof lights to the front roof slope.

    Received 15 Sep, published by the council 11 Oct 2026 Full applications
  • 26/AP/0663 Granted

    Burgess Business Park Parkhouse Street London Southwark SE5 7TJ

    Construction of new employment floorspace to provide Class E(g)(iii) and Class B8 floorspace, together with associated external works including the installation of a security cabin and replacement boundary fencing.

    Received 5 Mar, published by the council 28 Jul 2026 Full applications
  • 26/AP/0565 Withdrawn

    Church Of St Thomas More 380 Lordship Lane London Southwark SE22 8ND

    Landscaping works to provide accessible access from the church carpark to the John Paul Community Hall and Parish Office.

    Received 25 Feb, published by the council 28 Jul 2026 Full applications
  • 26/AP/2659 Awaiting decision

    23B Adys Road London Southwark SE15 4DX

    Rear dormer with 2no. rooflights on front slope plus a roof terrace over part of rear addition roof

    8 Sep 2026 Full applications
  • 26/AP/2660 Awaiting decision

    Vintage Yard 59 - 63 Bermondsey Street London Southwark SE1 3XF

    Installation of replacement rooftop and replacement low level roof plant, elevation alterations to include the removal of existing entrance gate and refurbishment of existing front door.

    8 Sep 2026 Full applications