Planning application
Butlers Wharf Building 36 Shad Thames London Southwark SE1 2YE
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of air-conditioning equipment at roof level and first-floor office refurbishment
As published by the council, reference 26/AP/0821
Application record
- Reference
- 26/AP/0821
- Type
- Minor application
- Status
- Granted
- Decision
- Minor - GRANTED
- Received
- 23 Mar 2026
- Validated
- 27 Mar 2026
- Decided
- 14 May 2026
- Ward
- North Bermondsey
- Parish
- Bermondsey And Rotherhithe
- Decision by
- Delegated Panel - Simple
- Postcode
- SE1 2YE
Timeline
Dates from the published record
-
23 Mar 2026
Received by Southwark
-
27 Mar 2026
Validated
Checked as complete and ready for consideration.
-
14 May 2026
Decision issued: Minor - GRANTED
-
10 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice
32 applications on PlanIndex · across 8 councils · 79% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
23 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Butlers Wharf Building 36 Shad Thames London Southwark SE1 2YE
Listed building consent for the installation of air-conditioning equipment at roof level and first-floor office refurbishment
Granted Heritage and listed buildings 23 docs -
Suite 309 Butlers Wharf Building 36 Shad Thames London Southwark SE1 2YE
Internal remodelling of the apartment, removal and replacement of modern partitions, cupboards, doors, kitchen units and bathroom suite.
Granted Heritage and listed buildings 12 docs -
Cardamom Building 31 Shad Thames London Southwark SE1 2YR
Listed building consent for the installation of five cubicles within the existing basement space, connection of waste drainage to the existing waste pipe via a pumped system to avoid excavation, installation of a bicycle rack, and formation of a bicycle ramp adjacent to the existing modern aluminium staircase.
Granted Heritage and listed buildings 23 docs -
7 Eagle Wharf Court 59 Lafone Street London Southwark SE1 2LZ
95% historically approved · decision due ~30 Sep
Listed Building Consent for internal alterations including the installation of new timber flooring with acoustic underlay, replacement kitchen and bathroom fittings and finishes, minor alterations to a non-original internal stud partition wall, application of lime plaster finishes, and associated repair and refurbishment works.
Awaiting decision -
33 Eagle Wharf Court 59 Lafone Street London Southwark SE1 2LZ
Creation of a proposed additional bedroom and creation of an en-suite shower room for bedroom 1
Granted Heritage and listed buildings 10 docs -
37 Shad Thames London Southwark SE1 2NJ
Installation of 1 x replacement awning above the entrance on Shad Thames
Refused Advertising 10 docs
Other full applications applications
In Southwark
-
26/AP/1021 Refused
Davotti Apartments 351 Rotherhithe Street London Southwark SE16 5LJ
Construction of two additional storeys to provide 4 self-contained flats
-
26/AP/1371 Granted
135 Merrow Street London Southwark SE17 2NX
Providing level access from the street; refurbishment of interior spaces; replacement of the existing rear/side lean-to structure with a new infill arrangement, incorporating a new wall to the Villa Street elevation and the rear courtyard; retention and repair of existing facades including the repainted hand-painted signage; and new electrical supply and mechanical ventilation provision.
-
26/AP/1445 Granted
42A Harper Road London Southwark SE1 6AD
Retrospective application for the installation of external security shutters and a postbox
-
26/AP/1322 Granted
St Francis R C Primary School Friary Road London Southwark SE15 1RQ
Installation of 7no. new external air conditioning units.
-
26/AP/0780 Granted
10 Marshalsea Road London Southwark SE1 1HL
Amalgamation of ground and basement Class (E) with existing first, second and third floor dwelling (C3) to create enlarged dwelling and associated bike and bin stores