Planning application
26/AP/0693
257 Bellenden Road London Southwark SE15 4DQ
Proposal
Retrospective erection of a concrete wall across the rear of the garden and a fence above it, and the proposed construction of an outbuilding at the end of the garden.
As published by the council, reference 26/AP/0693
Timeline
Dates from the published record
-
10 Mar 2026
Received by Southwark
-
1 May 2026
Validated
Checked as complete and ready for consideration.
-
28 Jul 2026
Added to PlanIndex
-
1 Aug 2026
Status changed to Awaiting decision
Previously Under consideration/assessment.
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Southwark for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
22/AP/3947 Withdrawn
90 Oglander Road London Southwark SE15 4EN
Prior approval notification for a single storey side return extension
-
22/AP/4031 Granted
90 Oglander Road London Southwark SE15 4EN
Prior approval notification for a single storey side return extension that would extend beyond the rear wall of the original dwellinghouse by 6m, with a maximum height of 3m and a height at the eaves of 3m.
-
22/AP/1385 Granted
96 Oglander Road London Southwark SE15 4EN
Construction of single storey rear extension
-
26/AP/1809 Awaiting decision
250 Bellenden Road London Southwark SE15 4BY
Single storey pitched roof side extension with new aluminium framed glazing to the rear elevation.
-
26/AP/1199 Granted
8 Marsden Road London Southwark SE15 4EE
Loft conversion including removal of chimney stacks and rebuilding the gable wall, raising the existing ridge line circa 150mm, rear dormer with flat roof and rooflights over, rooflights to front roof pitch.
-
26/AP/1493 Granted
22 Oxenford Street London Southwark SE15 4DE
Erection of a single-storey detached outbuilding in the rear garden for purposes incidental to the enjoyment of the existing dwellinghouse.
Other full applications applications
In Southwark
-
25/AP/2512 Granted
205 Rye Lane London Southwark SE15 4TP
Demolition of the rear part of the single storey shop structure at 205 Rye Lane. Construction of a two storey residential maisonette infill at 44 Bournemouth Close, with associated external works.
-
26/AP/2251 Awaiting decision
Flat 1 162B Underhill Road London Southwark SE22 0QH
Construction of garden outbuilding, to be used as a home office, and all associated works
-
26/AP/2259 Awaiting decision
64 Abercorn Way London Southwark SE1 5HL
Prior approvaL for Erection of a single-storey rear extension projecting 5.4 metres from the original rear elevation of the property.
-
26/AP/1773 Granted
5 Copleston Road London Southwark SE15 4AN
Replacement of all existing single-glazed timber windows with white double-glazed uPVC units (sash to front; casement to rear and sides), and replacement of all existing timber doors with new composite front doors and a uPVC rear door.
-
26/AP/1234 Granted
Unit 2 And Unit 7 313-349 Ilderton Road London Southwark SE19 1NW
Temporary change of use of Units 2 and 7 from light industrial (Class E(g)(iii)) to a widened set of commercial (Class E(c), E(d), E(e) and E(g)) uses for a period of 3 years.