Planning application

44 Abercorn Way London Southwark SE1 5HL

Granted Southwark 25/AP/3646 Large Home Extensions

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Prior approval notification for the construction of single storey rear extension of 5m in depth and 3m in both maximum height and eaves height

As published by the council, reference 25/AP/3646

Application record

Reference
25/AP/3646
Type
Large Home Extensions
Status
Granted
Decision
Prior Approval Not Required
Received
12 Dec 2025
Validated
13 Jan 2026
Decided
19 Feb 2026
Ward
South Bermondsey
Parish
Bermondsey And Rotherhithe
Decision by
Delegated Panel - Simple
Postcode
SE1 5HL

Timeline

Dates from the published record

  1. 12 Dec 2025

    Received by Southwark

  2. 13 Jan 2026

    Validated

    Checked as complete and ready for consideration.

  3. 19 Feb 2026

    Decision issued: Prior Approval Not Required

  4. 10 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice registered in London

23 applications on PlanIndex · across 8 councils · 71% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 42C Abercorn Way London Southwark SE1 5HL

    25/AP/3245 Submitted 7 Nov 2025 5m away

    91% historically approved · decision due ~5 Jan

    Erection of a single-storey rear extension projecting 5 metres from the original rear elevation of the property.

    Awaiting decision Full applications Extension 8 docs
    Small domestic
  • 42 Abercorn Way London Southwark SE1 5HL

    26/AP/0217 Submitted 26 Jan 2026 18m away

    Prior approval notification (Schedule 2, Part 1, Class A) for the erection of a single-storey rear extension projecting 5 metres from the original rear elevation of the property, with a maximum height of 3m.

    Granted Full applications Extension 8 docs
    Small domestic
  • 100 Acanthus Drive London Southwark SE1 5HJ

    26/AP/1391 Submitted 14 May 2026 23m away

    Certificate of Lawfulness (proposed) for replacement of a garage door with a window (to facilitate conversion of the garage to habitable space).

    Granted Lawful development Windows or glazing 12 docs
  • 98 Acanthus Drive London Southwark SE1 5HJ

    26/AP/1392 Submitted 14 May 2026 30m away

    Certificate of Lawfulness (proposed) for the proposed development of a garage conversion to replace the garage door with a window.

    Granted Lawful development Windows or glazing 12 docs
  • 29 Abercorn Way London Southwark SE1 5HL

    26/AP/1614 Submitted 5 Jun 2026 31m away

    95% historically approved · decision due ~3 Aug

    Certificate of Lawfulness (proposed) for the development of a garage conversion to replace the garage door with a window.

    Decided Windows or glazing
  • 64 Abercorn Way London Southwark SE1 5HL

    26/AP/2259 Submitted 29 Jul 2026 31m away

    95% historically approved · decision due ~30 Sep

    Prior approval notification for the construction of a single storey extension measuring at 5.4m in depth, 3.0m maxium height and 4.7m in width

    Awaiting decision Extension
    Small domestic

In Southwark

  • 26/AP/1021 Refused

    Davotti Apartments 351 Rotherhithe Street London Southwark SE16 5LJ

    Construction of two additional storeys to provide 4 self-contained flats

    10 Apr 2026 Full applications
  • 26/AP/1371 Granted

    135 Merrow Street London Southwark SE17 2NX

    Providing level access from the street; refurbishment of interior spaces; replacement of the existing rear/side lean-to structure with a new infill arrangement, incorporating a new wall to the Villa Street elevation and the rear courtyard; retention and repair of existing facades including the repainted hand-painted signage; and new electrical supply and mechanical ventilation provision.

    12 May 2026 Full applications
  • 26/AP/1445 Granted

    42A Harper Road London Southwark SE1 6AD

    Retrospective application for the installation of external security shutters and a postbox

    20 May 2026 Full applications
  • 26/AP/1322 Granted

    St Francis R C Primary School Friary Road London Southwark SE15 1RQ

    Installation of 7no. new external air conditioning units.

    7 May 2026 Full applications
  • 26/AP/0780 Granted

    10 Marshalsea Road London Southwark SE1 1HL

    Amalgamation of ground and basement Class (E) with existing first, second and third floor dwelling (C3) to create enlarged dwelling and associated bike and bin stores

    18 Mar 2026 Full applications