Planning application
176 - 178 Bermondsey Street London Southwark SE1 3TQ
Works: Demolition
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Demolition of part of the rear wall and proposed construction of a new rear access door.
As published by the council, reference 25/AP/2539
Application record
- Reference
- 25/AP/2539
- Type
- Minor application
- Status
- Granted
- Decision
- Minor - GRANTED
- Received
- 4 Sep 2025
- Validated
- 10 Oct 2025
- Decided
- 13 Nov 2025
- Ward
- London Bridge & West Bermondsey
- Parish
- Bermondsey And Rotherhithe
- Decision by
- Delegated Panel - Simple
- Postcode
- SE1 3TQ
Timeline
Dates from the published record
-
4 Sep 2025
Received by Southwark
-
10 Oct 2025
Validated
Checked as complete and ready for consideration.
-
13 Nov 2025
Decision issued: Minor - GRANTED
-
10 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in London
916 applications on PlanIndex · across 112 councils · 98% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
176 - 178 Bermondsey Street London Southwark SE1 3TQ
91% historically approved · decision due ~9 Dec
Roof extension (new fourth floor) including roof terrace associated privacy screening, green roof and plant. Change of use of the upper floors to residential (Class C3) to create 2 new dwellings including associated amenity space, cycle and refuse storage. Alterations at ground floor level including the installation sliding front entrance doors and proposed rear access door. Alterations to rear fenestration.
Awaiting decision Full applications New dwelling Extension +1 38 docsSeveral homes -
Basement Rear And Ground Floor Rear 180-182 Bermondsey Street London Southwark SE1 3TQ
Construction of glazed entrance area for the lower ground unit and provision of new spiral stair and disabled platform lift.
Granted Full applications Windows or glazing 15 docs -
Elm Court Royal Oak Yard London Southwark SE1 3TQ
A change of use of the unit from Officer (Class E)(g)(i) to Gym (Class E)(d). The operating hours will be between 6am to 9pm.
Granted Lawful development 3 docs -
Basement And Ground Floor 194 - 204 Bermondsey Street London Southwark SE1 3TQ
Installation of a metal security gate in front of the existing entrance door to the unit on the building's eastern elevation.
Granted Full applications 16 docs -
15 Bluelion Place London Southwark SE1 4PU
Display of non-illuminated building signage to the internal courtyard elevation - silver aluminium lettering 5mm thick fixed to the external cladding with rear locator fixings
Granted Advertising 9 docs -
Flat 3 187 Bermondsey Street London Southwark SE1 3UW
Listed Building Consent for replacement of existing roof access hatch with new opening glazed skylight and access stair to existing roof terrace; replacement of existing railings to roof terrace to residential apartment.
Refused Heritage and listed buildings Windows or glazing 17 docs
Other full applications applications
In Southwark
-
26/AP/1021 Refused
Davotti Apartments 351 Rotherhithe Street London Southwark SE16 5LJ
Construction of two additional storeys to provide 4 self-contained flats
-
26/AP/1371 Granted
135 Merrow Street London Southwark SE17 2NX
Providing level access from the street; refurbishment of interior spaces; replacement of the existing rear/side lean-to structure with a new infill arrangement, incorporating a new wall to the Villa Street elevation and the rear courtyard; retention and repair of existing facades including the repainted hand-painted signage; and new electrical supply and mechanical ventilation provision.
-
26/AP/1445 Granted
42A Harper Road London Southwark SE1 6AD
Retrospective application for the installation of external security shutters and a postbox
-
26/AP/1322 Granted
St Francis R C Primary School Friary Road London Southwark SE15 1RQ
Installation of 7no. new external air conditioning units.
-
26/AP/0780 Granted
10 Marshalsea Road London Southwark SE1 1HL
Amalgamation of ground and basement Class (E) with existing first, second and third floor dwelling (C3) to create enlarged dwelling and associated bike and bin stores