Skip to content
PlanIndex Get alerts
Menu

Planning application

Greenland Dock Rope Street London Southwark SE16

Granted Southwark 23/AP/2853 Minor application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of a single storey electricity substation and LV room

As published by the council, reference 23/AP/2853

Application record

Reference
23/AP/2853
Type
Minor application
Status
Granted
Decision
Minor - GRANTED
Received
10 Oct 2023
Validated
20 Oct 2023
Decided
10 Apr 2024
Ward
Surrey Docks
Parish
Bermondsey And Rotherhithe
Decision by
Delegated Panel - Simple

Timeline

Dates from the published record

  1. 10 Oct 2023

    Received by Southwark

  2. 20 Oct 2023

    Validated

    Checked as complete and ready for consideration.

  3. 10 Apr 2024

    Decision issued: Minor - GRANTED

  4. 26 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Southwark

14 applications on PlanIndex · across 4 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

21 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Greenland Dock Rope Street London Southwark SE16

    23/AP/2989 Submitted 25 Oct 2023 0m away

    Construction single storey substation adjacent to listed dock.

    Granted Heritage and listed buildings 20 docs
    Small domestic
  • Greenland Dock Rope Street London Southwark SE16

    25/AP/2701 Submitted 18 Sep 2025 0m away

    96% historically approved · decision due ~14 Nov

    Details of condition 5 'Service run' pursuant to listed building consent 23/AP/2989 'Construction single storey substation adjacent to listed dock.'

    Awaiting decision Conditions 4 docs
    Small domestic
  • Greenland Dock Rope Street London Southwark

    25/AP/2436 Submitted 22 Aug 2025 90m away

    Certificate of Lawfulness (proposed) for installation of replacement pontoons and pilings to Greenland Dock (including the upgrading of mechanical and electrical infrastructure). The number of pontoons will remain as existing, but the pilings will be increased from 3 to 7.

    Granted Lawful development 15 docs
  • South Dock Marina Rope Street London Southwark SE16 1TX

    22/AP/3036 Submitted 31 Aug 2022 91m away

    Variation of Condition 12 pursuant to planning permission LDDC S/96/0021 for 'Variation of condition 12 of LDDC S/88/248 to permit 65% of berths to be used as permanent residencies'. The amendment seeks the following: removal of Condition 12 to permit 100% residential use of vessels in the marina.

    Granted Amendments 12 docs
  • Rainbow Quay London Southwark SE16 7UF

    25/AP/3374 Submitted 19 Nov 2025 92m away

    Retention of landscaping works, including the removal of the external steps and walkway on the west side of the courtyard and the extension of the adjacent flower beds, to infill these areas.

    Granted Full applications Extension 24 docs
  • South Lock Control Office South Dock Marina Plough Way London Southwark SE16 7SZ

    25/AP/3406 Submitted 21 Nov 2025 140m away

    Listed Building Consent for Construction of new fire escape stair case from First floor office to ground floor and new external postal boxes

    Granted Heritage and listed buildings 15 docs

In Southwark

  • 26/AP/1021 Refused

    Davotti Apartments 351 Rotherhithe Street London Southwark SE16 5LJ

    Construction of two additional storeys to provide 4 self-contained flats

    10 Apr 2026 Full applications
  • 26/AP/1371 Granted

    135 Merrow Street London Southwark SE17 2NX

    Providing level access from the street; refurbishment of interior spaces; replacement of the existing rear/side lean-to structure with a new infill arrangement, incorporating a new wall to the Villa Street elevation and the rear courtyard; retention and repair of existing facades including the repainted hand-painted signage; and new electrical supply and mechanical ventilation provision.

    12 May 2026 Full applications
  • 26/AP/1445 Granted

    42A Harper Road London Southwark SE1 6AD

    Retrospective application for the installation of external security shutters and a postbox

    20 May 2026 Full applications
  • 26/AP/1322 Granted

    St Francis R C Primary School Friary Road London Southwark SE15 1RQ

    Installation of 7no. new external air conditioning units.

    7 May 2026 Full applications
  • 26/AP/0780 Granted

    10 Marshalsea Road London Southwark SE1 1HL

    Amalgamation of ground and basement Class (E) with existing first, second and third floor dwelling (C3) to create enlarged dwelling and associated bike and bin stores

    18 Mar 2026 Full applications