Planning application
89, 91 And 93 Peckham High Street London Southwark SE15 5RS
Works: Demolition
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Proposed demolition of No 89 Peckham High Street. Partial demolition of No 91 and 93. Retention of west facade and south front facade and refurbishment including the construction of a three-storey building with a basement. Change of use from mixed gallery, retail, office and residential use to create a Community Arts Facility (Departure from Southwark Plan 2022 - Policy P3: Protection of existing homes and Policy P30: Office & Business Development).
As published by the council, reference 23/AP/2135
Application record
- Reference
- 23/AP/2135
- Type
- Minor application
- Status
- Granted
- Decision
- Granted As published: Minor - GRANTED
- Received
- 28 Jul 2023
- Validated
- 8 Aug 2023
- Decided
- 7 Feb 2024
- Ward
- Peckham
- Parish
- Peckham And Nunhead
- Decision by
- Delegated - Source Team
- Postcode
- SE15 5RS
Site history
Applications at this address on the Southwark register
This site has had 7 applications since 2023: 2 approved, 0 refused.
-
26/AP/0764 Withdrawn
89, 91 And 93 Peckham High Street London Southwark SE15 5RS
Details of Condition 6 'Scaffolding' as required by planning permission ref no. 23/AP/2135: 'Proposed demolition of No 89 Peckham High Street. Partial demolition of No 91 and 93. Retention of west facade and south front facade and refurbishment including the construction of a three-storey building with a basement. Change of use from mixed gallery, retail, office and residential use to create a Community Arts Facility (Departure from Southwark Plan 2022 - Policy P3: Protection of existing homes and Policy P30: Office & Business Development).'
-
25/AP/3197 Awaiting decision
89, 91 And 93 Peckham High Street London Southwark SE15 5RS
Details of Condition 10 (Arboricultural Method Statement) pursuant to planning permission ref no. 23/AP/2135 dated 09/02/2024 for 'Proposed demolition of No 89 Peckham High Street. Partial demolition of No 91 and 93. Retention of west facade and south front facade and refurbishment including the construction of a three-storey building with a basement. Change of use from mixed gallery, retail, office and residential use to create a Community Arts Facility (Departure from Southwark Plan 2022 - Policy P3: Protection of existing homes and Policy P30: Office & Business Development).'
-
25/AP/3047 Awaiting decision
89, 91 And 93 Peckham High Street London Southwark SE15 5RS
Details of Condition 7 (Construction Logistics Plan) as required by planning permission 23/AP/2135 dated 09/02/2024 for 'Proposed demolition of No 89 Peckham High Street. Partial demolition of No 91 and 93. Retention of west facade and south front facade and refurbishment including the construction of a three-storey building with a basement. Change of use from mixed gallery, retail, office and residential use to create a Community Arts Facility (Departure from Southwark Plan 2022 - Policy P3: Protection of existing homes and Policy P30: Office & Business Development)'.
-
25/AP/2857 Awaiting decision
89, 91 And 93 Peckham High Street London Southwark SE15 5RS
Details of Condition 8 - CEMP as required by full planning permission 23/AP/2135 dated 09/02/2024 for Proposed demolition of No 89 Peckham High Street. Partial demolition of No 91 and 93. Retention of west facade and south front facade and refurbishment including the construction of a three-storey building with a basement. Change of use from mixed gallery, retail, office and residential use to create a Community Arts Facility (Departure from Southwark Plan 2022 - Policy P3: Protection of existing homes and Policy P30: Office & Business Development).
-
25/AP/2834 Granted
89, 91 And 93 Peckham High Street London Southwark SE15 5RS
Details of Condition 3 (External windows, doors, shopfronts, parapet and solar panels) as required by full planning permission 23/AP/2135 dated 09/02/2024 for 'Proposed demolition of No 89 Peckham High Street. Partial demolition of No 91 and 93. Retention of west facade and south front facade and refurbishment including the construction of a three-storey building with a basement. Change of use from mixed gallery, retail, office and residential use to create a Community Arts Facility' (Departure from Southwark Plan 2022 - Policy P3: Protection of existing homes and Policy P30: Office & Business Development).
-
25/AP/2475 Decided
89, 91 And 93 Peckham High Street London Southwark SE15 5RS
Non-material amendment to planning permission ref. 23/AP/2135 dated 09/02/2024 for 'Proposed demolition of No 89 Peckham High Street. Partial demolition of No 91 and 93. Retention of west facade and south front facade and refurbishment including the construction of a three-storey building with a basement. Change of use from mixed gallery, retail, office and residential use to create a Community Arts Facility (Departure from Southwark Plan 2022 - Policy P3: Protection of existing homes and Policy P30: Office & Business Development).' NMA sought: Amendment to fenestration on western elevation.
Timeline
Dates from the published record
-
28 Jul 2023
Received by Southwark
-
8 Aug 2023
Validated
Checked as complete and ready for consideration.
-
7 Feb 2024
Decision issued: Minor - GRANTED
-
26 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
6 later applications on the register refer to this one:
-
26/AP/0764 Withdrawn
89, 91 And 93 Peckham High Street London Southwark SE15 5RS
Details of Condition 6 'Scaffolding' as required by planning permission ref no. 23/AP/2135: 'Proposed demolition of No 89 Peckham High Street. Partial demolition of No 91 and 93. Retention of west facade and south front facade and refurbishment including the construction of a three-storey building with a basement. Change of use from mixed gallery, retail, office and residential use to create a Community Arts Facility (Departure from Southwark Plan 2022 - Policy P3: Protection of existing homes and Policy P30: Office & Business Development).'
-
25/AP/3197 Awaiting decision
89, 91 And 93 Peckham High Street London Southwark SE15 5RS
Details of Condition 10 (Arboricultural Method Statement) pursuant to planning permission ref no. 23/AP/2135 dated 09/02/2024 for 'Proposed demolition of No 89 Peckham High Street. Partial demolition of No 91 and 93. Retention of west facade and south front facade and refurbishment including the construction of a three-storey building with a basement. Change of use from mixed gallery, retail, office and residential use to create a Community Arts Facility (Departure from Southwark Plan 2022 - Policy P3: Protection of existing homes and Policy P30: Office & Business Development).'
-
25/AP/3047 Awaiting decision
89, 91 And 93 Peckham High Street London Southwark SE15 5RS
Details of Condition 7 (Construction Logistics Plan) as required by planning permission 23/AP/2135 dated 09/02/2024 for 'Proposed demolition of No 89 Peckham High Street. Partial demolition of No 91 and 93. Retention of west facade and south front facade and refurbishment including the construction of a three-storey building with a basement. Change of use from mixed gallery, retail, office and residential use to create a Community Arts Facility (Departure from Southwark Plan 2022 - Policy P3: Protection of existing homes and Policy P30: Office & Business Development)'.
-
25/AP/2857 Awaiting decision
89, 91 And 93 Peckham High Street London Southwark SE15 5RS
Details of Condition 8 - CEMP as required by full planning permission 23/AP/2135 dated 09/02/2024 for Proposed demolition of No 89 Peckham High Street. Partial demolition of No 91 and 93. Retention of west facade and south front facade and refurbishment including the construction of a three-storey building with a basement. Change of use from mixed gallery, retail, office and residential use to create a Community Arts Facility (Departure from Southwark Plan 2022 - Policy P3: Protection of existing homes and Policy P30: Office & Business Development).
-
25/AP/2834 Granted
89, 91 And 93 Peckham High Street London Southwark SE15 5RS
Details of Condition 3 (External windows, doors, shopfronts, parapet and solar panels) as required by full planning permission 23/AP/2135 dated 09/02/2024 for 'Proposed demolition of No 89 Peckham High Street. Partial demolition of No 91 and 93. Retention of west facade and south front facade and refurbishment including the construction of a three-storey building with a basement. Change of use from mixed gallery, retail, office and residential use to create a Community Arts Facility' (Departure from Southwark Plan 2022 - Policy P3: Protection of existing homes and Policy P30: Office & Business Development).
-
25/AP/2475 Decided
89, 91 And 93 Peckham High Street London Southwark SE15 5RS
Non-material amendment to planning permission ref. 23/AP/2135 dated 09/02/2024 for 'Proposed demolition of No 89 Peckham High Street. Partial demolition of No 91 and 93. Retention of west facade and south front facade and refurbishment including the construction of a three-storey building with a basement. Change of use from mixed gallery, retail, office and residential use to create a Community Arts Facility (Departure from Southwark Plan 2022 - Policy P3: Protection of existing homes and Policy P30: Office & Business Development).' NMA sought: Amendment to fenestration on western elevation.
Who's behind it
Company information only, from the register and Companies House
Knox Bhavan Architects LLP Agent, an architecture practice registered in London
Active · incorporated 2023 · London
15 applications on PlanIndex · across 5 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
79 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Southwark granted permission on 7 February 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
89, 91 And 93 Peckham High Street London Southwark SE15 5RS
Details of Condition 3 (External windows, doors, shopfronts, parapet and solar panels) as required by full planning permission 23/AP/2135 dated 09/02/2024 for 'Proposed demolition of No 89 Peckham High Street. Partial demolition of No 91 and 93. Retention of west facade and south front facade and refurbishment including the construction of a three-storey building with a basement. Change of use from mixed gallery, retail, office and residential use to create a Community Arts Facility' (Departure from Southwark Plan 2022 - Policy P3: Protection of existing homes and Policy P30: Office & Business Development).
Granted Conditions Demolition Windows or glazing 33 docs -
89, 91 And 93 Peckham High Street London Southwark SE15 5RS
Non-material amendment to planning permission ref. 23/AP/2135 dated 09/02/2024 for 'Proposed demolition of No 89 Peckham High Street. Partial demolition of No 91 and 93. Retention of west facade and south front facade and refurbishment including the construction of a three-storey building with a basement. Change of use from mixed gallery, retail, office and residential use to create a Community Arts Facility (Departure from Southwark Plan 2022 - Policy P3: Protection of existing homes and Policy P30: Office & Business Development).' NMA sought: Amendment to fenestration on western elevation.
Decided Conditions Demolition Windows or glazing 10 docs -
89, 91 And 93 Peckham High Street London Southwark SE15 5RS
96% historically approved · decision due ~16 Dec
Details of Condition 7 (Construction Logistics Plan) as required by planning permission 23/AP/2135 dated 09/02/2024 for 'Proposed demolition of No 89 Peckham High Street. Partial demolition of No 91 and 93. Retention of west facade and south front facade and refurbishment including the construction of a three-storey building with a basement. Change of use from mixed gallery, retail, office and residential use to create a Community Arts Facility (Departure from Southwark Plan 2022 - Policy P3: Protection of existing homes and Policy P30: Office & Business Development)'.
Awaiting decision Conditions Demolition 4 docs -
89, 91 And 93 Peckham High Street London Southwark SE15 5RS
Details of Condition 6 'Scaffolding' as required by planning permission ref no. 23/AP/2135: 'Proposed demolition of No 89 Peckham High Street. Partial demolition of No 91 and 93. Retention of west facade and south front facade and refurbishment including the construction of a three-storey building with a basement. Change of use from mixed gallery, retail, office and residential use to create a Community Arts Facility (Departure from Southwark Plan 2022 - Policy P3: Protection of existing homes and Policy P30: Office & Business Development).'
Withdrawn Conditions Demolition 6 docs -
89, 91 And 93 Peckham High Street London Southwark SE15 5RS
96% historically approved · decision due ~30 Dec
Details of Condition 10 (Arboricultural Method Statement) pursuant to planning permission ref no. 23/AP/2135 dated 09/02/2024 for 'Proposed demolition of No 89 Peckham High Street. Partial demolition of No 91 and 93. Retention of west facade and south front facade and refurbishment including the construction of a three-storey building with a basement. Change of use from mixed gallery, retail, office and residential use to create a Community Arts Facility (Departure from Southwark Plan 2022 - Policy P3: Protection of existing homes and Policy P30: Office & Business Development).'
Awaiting decision Conditions Demolition 4 docs -
89, 91 And 93 Peckham High Street London Southwark SE15 5RS
96% historically approved · decision due ~28 Nov
Details of Condition 8 - CEMP as required by full planning permission 23/AP/2135 dated 09/02/2024 for Proposed demolition of No 89 Peckham High Street. Partial demolition of No 91 and 93. Retention of west facade and south front facade and refurbishment including the construction of a three-storey building with a basement. Change of use from mixed gallery, retail, office and residential use to create a Community Arts Facility (Departure from Southwark Plan 2022 - Policy P3: Protection of existing homes and Policy P30: Office & Business Development).
Awaiting decision Conditions Demolition 2 docs
Other full applications
In Southwark
-
26/AP/2734 Awaiting decision
Flat D 116 Barry Road London Southwark SE22 0HP
Construction of a rear dormer extension with juliet balcony and the addition of three roof lights to the front roof slope.
-
26/AP/0663 Granted
Burgess Business Park Parkhouse Street London Southwark SE5 7TJ
Construction of new employment floorspace to provide Class E(g)(iii) and Class B8 floorspace, together with associated external works including the installation of a security cabin and replacement boundary fencing.
-
26/AP/0565 Withdrawn
Church Of St Thomas More 380 Lordship Lane London Southwark SE22 8ND
Landscaping works to provide accessible access from the church carpark to the John Paul Community Hall and Parish Office.
-
26/AP/2659 Awaiting decision
23B Adys Road London Southwark SE15 4DX
Rear dormer with 2no. rooflights on front slope plus a roof terrace over part of rear addition roof
-
26/AP/2660 Awaiting decision
Vintage Yard 59 - 63 Bermondsey Street London Southwark SE1 3XF
Installation of replacement rooftop and replacement low level roof plant, elevation alterations to include the removal of existing entrance gate and refurbishment of existing front door.