Demolition of existing garages and construction of four storey and five storey buildings providing 18 residential apartments (two x 1-bedroom units, nine x 2-bedroom units, seven x 3-bedroom units) with associated estate-wide hard and soft landscaping, cycle parking and refuse storage and the replacement of the existing substation.

As published by the council, reference 22/AP/3683

Timeline

Dates from the published record

  1. 24 Oct 2022

    Received by Southwark

  2. 26 Oct 2022

    Validated

    Checked as complete and ready for consideration.

  3. 13 Jun 2023

    Decision issued: Council's Own - GRANTED

  4. 28 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About other applications

How this application type works

This application sits outside the common categories, which can include county matters such as minerals and waste, works by statutory undertakers, demolition notifications and other less frequent procedures. The council record linked below sets out the specific procedure that applies, and the description above is taken directly from the published register.

More on other applications in our guide

Nearby applications

Within 500 metres

  • 26/AP/0758 Awaiting decision

    Townsend House Strathnairn Street London Southwark SE1 5BU

    Variation of condition 4 (Construction Environmental Management Plan) pf planning permission 22/AP/3683 (Demolition of existing garages and construction of four storey and five storey buildings providing 18 residential apartments (two x 1-bedroom units, nine x 2-bedroom units, seven x 3-bedroom units) with associated estate-wide hard and soft landscaping, cycle parking and refuse storage and the replacement of the existing substation). To separate Condition 4 (Construction Environmental Management Plan) into two parts. The suggested wording for amendment is as follows: "Prior to works commencing, a separately written DEMP for demolition works and CEMP for construction works must submitted to and approved in writing by the Local Planning Authority. The DEMP and CEMP shall oblige the applicant, developer and contractors to commit to current best practice with regard to construction site management and to use all best endeavours to minimise off-site impacts, and will include the following information..."

    16 Mar 2026 0m away Amendments
  • 26/AP/0728 Awaiting decision

    Townsend House Strathnairn Street London Southwark SE1 5BU

    Variation of condition 6 of planning permission ref no. 22/AP/3683 ( Demolition of existing garages and construction of four storey and five storey buildings providing 18 residential apartments (two x 1-bedroom units, nine x 2-bedroom units, seven x 3-bedroom units) with associated estate-wide hard and soft landscaping, cycle parking and refuse storage and the replacement of the existing substation). To split Condition 6 (Arboricultural Method Statement) in two parts of 6a and 6b.

    12 Mar 2026 0m away Amendments
  • 26/AP/1349 Granted

    Mason And Townsend House Strathnairn Street London Southwark SE1 5BU

    Details of condition 3 (Remediation And/Or Mitigation Strategy) as required by planning permission ref. 22/AP/3683 dated 13/06/2023 for 'Demolition of existing garages and construction of four storey and five storey buildings providing 18 residential apartments (two x 1-bedroom units, nine x 2-bedroom units, seven x 3-bedroom units) with associated estate-wide hard and soft landscaping, cycle parking and refuse storage and the replacement of the existing substation'.

    11 May 2026 0m away Conditions
  • 26/AP/2187 Awaiting decision

    City Of London Academy 240 Lynton Road London Southwark SE1 5LA

    Details of Condition 8- Details of biodiversity green roof as required by full planning permission 23/AP/2312 dated 05/06/2025 for Erection of new basketball hall with supporting facilities (changing rooms and WCs) and a lightweight link to the existing school building.

    24 Jul 2026 128m away Conditions
  • 26/AP/2198 Awaiting decision

    City Of London Academy 240 Lynton Road London Southwark SE1 5LA

    Details of Condition 10- Hard and soft landscaping details, specifications and drawings as required by full planning permission 23/AP/2312 dated 05/06/2025 for Erection of new basketball hall with supporting facilities (changing rooms and WCs) and a lightweight link to the existing school building.

    24 Jul 2026 128m away Conditions
  • 20/AP/2230 Granted

    38 Strathnairn Street London Southwark SE1 5BL

    The construction of a single storey rear extension; the addition of a Juliet balcony and two windows to the rear elevation and one window to the front; and alterations to the fenestration of the front porch.

    7 Aug 2020 135m away Householder

In Southwark

  • 26/AP/0940 Awaiting decision

    Bells Gardens Community Centre 19 Buller Close London Southwark SE15 6UJ

    Extension of existing planning consent ref: 22/AP/3749 for a single storey temporary modular Community Centre building for a period of further 3 years.

    31 Mar 2026 Other
  • 26/AP/0390 Awaiting decision

    Dulwich Leisure Centre 2B Crystal Palace Road London Southwark SE22 9HB

    Installation of 6no. air source heat pumps with acoustic barriers, installation of an electric substation and the formation of a dropped kerb with the relocation of cycle parking spaces, and replacement of the pool and gym windows upgraded to Part L thermal performance with a timber finish.

    9 Feb 2026 Other
  • 22/AP/3749 Granted

    Bells Gardens Community Centre 19 Buller Close London Southwark SE15 6UJ

    Construction of a temporary modular community centre building (Use Class F2(b)) for a period of 3 years, landscaping, lighting and other associated works

    28 Oct 2022 Other
  • 22/AP/3793 Granted

    89 Peckham High Street London Southwark SE15 5RS

    Retention of fibreglass sculpture (2m high x 1.5m diameter) at the Peckham Peace Wall in Peckham Square (Retrospective).

    1 Nov 2022 Other
  • 22/AP/3637 Granted

    Pierson House Kingswood Estate Bowen Drive London Southwark SE21 8QA

    Installation of external wall insulation with a brick slip system cladding on the ground floor and render on the remaining floors. Window renewal, communal and private balcony replacements and the replacement of doors.

    20 Oct 2022 Other