Skip to content
PlanIndex Get alerts
Menu

Planning application

Flat 69 River Court Upper Ground London Southwark SE1 9PB

Granted Southwark 22/AP/3225 Minor application

Works: Extension Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Extensions on terrace and south side balcony together with replacement windows.

As published by the council, reference 22/AP/3225

Application record

Reference
22/AP/3225
Type
Minor application
Status
Granted
Decision
Minor - GRANTED
Received
8 Sep 2022
Validated
5 Oct 2022
Decided
11 Nov 2022
Ward
Borough & Bankside
Parish
Borough, Bankside And Walworth
Decision by
Delegated Panel - Simple
Postcode
SE1 9PB

Timeline

Dates from the published record

  1. 8 Sep 2022

    Received by Southwark

  2. 5 Oct 2022

    Validated

    Checked as complete and ready for consideration.

  3. 11 Nov 2022

    Decision issued: Minor - GRANTED

  4. 15 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Southwark

  • 26/AP/1021 Refused

    Davotti Apartments 351 Rotherhithe Street London Southwark SE16 5LJ

    Construction of two additional storeys to provide 4 self-contained flats

    10 Apr 2026 Full applications
  • 26/AP/1371 Granted

    135 Merrow Street London Southwark SE17 2NX

    Providing level access from the street; refurbishment of interior spaces; replacement of the existing rear/side lean-to structure with a new infill arrangement, incorporating a new wall to the Villa Street elevation and the rear courtyard; retention and repair of existing facades including the repainted hand-painted signage; and new electrical supply and mechanical ventilation provision.

    12 May 2026 Full applications
  • 26/AP/1445 Granted

    42A Harper Road London Southwark SE1 6AD

    Retrospective application for the installation of external security shutters and a postbox

    20 May 2026 Full applications
  • 26/AP/1322 Granted

    St Francis R C Primary School Friary Road London Southwark SE15 1RQ

    Installation of 7no. new external air conditioning units.

    7 May 2026 Full applications
  • 26/AP/0780 Granted

    10 Marshalsea Road London Southwark SE1 1HL

    Amalgamation of ground and basement Class (E) with existing first, second and third floor dwelling (C3) to create enlarged dwelling and associated bike and bin stores

    18 Mar 2026 Full applications