Skip to content
PlanIndex Get alerts
Menu

Planning application

Chambers Wharf Chambers Street London Southwark SE16

Granted Southwark 22/AP/2017 Minor application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Construction of a new river wall as a flood defence including Inter-tidal terrace with a planting scheme and safety features.

As published by the council, reference 22/AP/2017

Application record

Reference
22/AP/2017
Type
Minor application
Status
Granted
Decision
Minor - GRANTED
Received
8 Jun 2022
Validated
8 Jun 2022
Decided
15 Nov 2022
Ward
North Bermondsey
Parish
Bermondsey And Rotherhithe
Decision by
Delegated Panel - Simple

Timeline

Dates from the published record

  1. 8 Jun 2022

    Received by Southwark

  2. 15 Nov 2022

    Decision issued: Minor - GRANTED

  3. 26 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

33 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Southwark granted permission on 15 November 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Thames Tideway Tunnel At Chambers Wharf Chambers Street London Southwark SE16

    23/AP/2856 Submitted 10 Oct 2023 39m away

    Formal application to vary Schedule 3 Requirement CHAWF1 (CoCP Part B) to allow for the works: (1) installation of precast shaft cover slabs and (2) fixing of steel reinforcement (all inside the acoustic shed) to be undertaken over the Christmas period 2023 at Chambers Wharf (CHAWF) work site of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (the Order) (as amended).

    Granted Conditions 4 docs
    Small domestic
  • Chambers Wharf Chambers Street London Southwark

    20/AP/2554 Submitted 11 Sep 2020 39m away

    Partial discharge of 'Chambers Wharf Worksite Specific Traffic Management Plan (Tunnelling)' Schedule 3 Requirement CHAWF8 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

    Granted Conditions 6 docs
  • Chambers Wharf Chambers Street London Southwark

    20/AP/2553 Submitted 11 Sep 2020 39m away

    Partial discharge of Schedule 3 Requirement PW6 'Worksite Specific Construction Logistics Plan' (CoCP Part A, Section 5.1.9) of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014

    Granted Conditions 6 docs
  • Thames Tideway: Chambers Wharf Chambers Street London Southwark

    23/AP/2130 Submitted 28 Jul 2023 39m away

    Partial discharge of (Noise and Vibration Management Plan) pursuant to Requirement PW6 (CoCP Part A, Section 6.1.10), Schedule 3, of The Thames Tideway Utilities Limited (Thames Tideway Tunnel) Order 2014 (as amended) (hereafter referred to The Order) for the Chambers Wharf Foreshore Thames Tideway Tunnel worksite.

    Granted Conditions 8 docs
  • Thames Tideway Tunnel At Chambers Wharf Chambers Street London Southwark

    22/AP/3569 Submitted 14 Oct 2022 41m away

    Partially Discharge (external appearance of the hoarding) pursuant to Requirement CHAWF1 (CoCP Part B, Section 4), Schedule 3 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (as amended) for the works at Chambers Wharf Thames Tideway Tunnel worksite only

    Granted Conditions 10 docs
  • Thames Tideway Tunnel At Chambers Wharf Chambers Street London Southwark SE16

    23/AP/3000 Submitted 26 Oct 2023 41m away

    Partial discharge of Schedule 3 of Requirement PW6 of (CoCP Part A), Section 7 'Air Quality Management Plan' at Chambers Wharf (CHAWF) work site of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (the Order) (as amended)(hereafter referred to as The Order)..

    Granted Conditions 5 docs

In Southwark

  • 26/AP/1021 Refused

    Davotti Apartments 351 Rotherhithe Street London Southwark SE16 5LJ

    Construction of two additional storeys to provide 4 self-contained flats

    10 Apr 2026 Full applications
  • 26/AP/1371 Granted

    135 Merrow Street London Southwark SE17 2NX

    Providing level access from the street; refurbishment of interior spaces; replacement of the existing rear/side lean-to structure with a new infill arrangement, incorporating a new wall to the Villa Street elevation and the rear courtyard; retention and repair of existing facades including the repainted hand-painted signage; and new electrical supply and mechanical ventilation provision.

    12 May 2026 Full applications
  • 26/AP/1445 Granted

    42A Harper Road London Southwark SE1 6AD

    Retrospective application for the installation of external security shutters and a postbox

    20 May 2026 Full applications
  • 26/AP/1322 Granted

    St Francis R C Primary School Friary Road London Southwark SE15 1RQ

    Installation of 7no. new external air conditioning units.

    7 May 2026 Full applications
  • 26/AP/0780 Granted

    10 Marshalsea Road London Southwark SE1 1HL

    Amalgamation of ground and basement Class (E) with existing first, second and third floor dwelling (C3) to create enlarged dwelling and associated bike and bin stores

    18 Mar 2026 Full applications