Planning application
22/AP/1219
37 Kings Grove London Southwark SE15 2LY
Proposal
Construction of mansard roof extension (with 1No. roof light, 2No. front elevation windows, 2No. rear elevation windows).
As published by the council, reference 22/AP/1219
Timeline
Dates from the published record
-
4 Apr 2022
Received by Southwark
-
27 Apr 2022
Validated
Checked as complete and ready for consideration.
-
21 Jun 2022
Decision issued: Minor - GRANTED
-
28 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/AP/1447 Awaiting decision
33 Montpelier Road London Southwark SE15 2HB
Demolition of existing rear extension and construction of a single-storey rear extension in Corten steel with PV array; removal of existing small rear dormer and rear roof light, and construction of a full-width rear dormer with PV array and extended brick party walls to the roof and chimney; changes to rear fenestration; like-for-like replacement of front windows with double glazing and installation of a front roof light.
-
26/AP/1164 Awaiting decision
51 Montpelier Road London Southwark SE15 2HD
Removal of an existing rear ground floor extension, internal redesign, construction of a new roof extension.
-
22/AP/1738 Granted
53 Montpelier Road London Southwark SE15 2HD
Construction of single storey rear extension
-
26/AP/1697 Awaiting decision
Unit 21 Astbury Business Park Station Passage London Southwark SE15 2JR
Change of use of the railway arch from mixed light industrial and storage use (Class E(g)(iii) / B8) to a music and podcast recording studio enterprise (Class E(g)(iii)).
-
05/AP/2131 Granted
100 Queens Road London SE15 2QT
Approval of details pursuant to condition4 'site investigation' LBS Reg No 0201547 d/d 10/12/2002 for construction of a three storey detached block of six bedsit units
-
04/AP/1462 Withdrawn
100 Queens Road London SE15 2QT
Details of refuse storage as required by condition 3 of planning permission dated 10/12/2002 [LBS.REG.No:02-AP-1547] for construction of a three storey detached block of six bed sits.
Other full applications applications
In Southwark
-
25/AP/2512 Granted
205 Rye Lane London Southwark SE15 4TP
Demolition of the rear part of the single storey shop structure at 205 Rye Lane. Construction of a two storey residential maisonette infill at 44 Bournemouth Close, with associated external works.
-
26/AP/2251 Awaiting decision
Flat 1 162B Underhill Road London Southwark SE22 0QH
Construction of garden outbuilding, to be used as a home office, and all associated works
-
26/AP/2259 Awaiting decision
64 Abercorn Way London Southwark SE1 5HL
Prior approvaL for Erection of a single-storey rear extension projecting 5.4 metres from the original rear elevation of the property.
-
26/AP/1773 Granted
5 Copleston Road London Southwark SE15 4AN
Replacement of all existing single-glazed timber windows with white double-glazed uPVC units (sash to front; casement to rear and sides), and replacement of all existing timber doors with new composite front doors and a uPVC rear door.
-
26/AP/1234 Granted
Unit 2 And Unit 7 313-349 Ilderton Road London Southwark SE19 1NW
Temporary change of use of Units 2 and 7 from light industrial (Class E(g)(iii)) to a widened set of commercial (Class E(c), E(d), E(e) and E(g)) uses for a period of 3 years.