Skip to content
PlanIndex Get alerts
Menu

Planning application

5-9 Rockingham Street And 2-4 Tiverton Street London SE1 6PF

Granted Southwark 22/AP/1068 Major application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Redevelopment of site to provide a 24 storey building plus basement consisting of purpose-built student accommodation (Sui Generis), and commercial uses (Use Class E) at ground floor, and the development of the associated railway arches to provide commercial space (Use Class E), plant, refuse and cycle storage, and associated access and public realm works.

As published by the council, reference 22/AP/1068

Application record

Reference
22/AP/1068
Type
Major application
Status
Granted
Decision
Major - GRANTED
Received
22 Mar 2022
Validated
24 Mar 2022
Decided
16 Aug 2023
Ward
Chaucer
Parish
Borough, Bankside And Walworth
Decision by
Planning Committee
Postcode
SE1 6PF

Site history

Applications at this address on the Southwark register

This site has had 12 applications since 2022: 3 approved, 0 refused.

  • 26/AP/2112 Decided

    5-9 Rockingham Street And 2-4 Tiverton Street London SE1 6PF

    Details of Condition 20 (Wheelchair-user Student Bedrooms) as required by planning permission 22/AP/1068 dated 16/08/2023 for 'Redevelopment of site to provide a 24 storey building plus basement consisting of purpose-built student accommodation (Sui Generis), and commercial uses (Use Class E) at ground floor, and the development of the associated railway arches to provide commercial space (Use Class E), plant, refuse and cycle storage, and associated access and public realm works'.

    Submitted 17 Jul 2026
  • 26/AP/0347 Granted

    5-9 Rockingham Street And 2-4 Tiverton Street London SE1 6PF

    Details of Condition 19 (part a) only) Secured by Design as required by planning permission 22/AP/1068 dated 16/08/2023 for Redevelopment of site to provide a 24 storey building plus basement consisting of purpose-built student accommodation (Sui Generis), and commercial uses (Use Class E) at ground floor, and the development of the associated railway arches to provide commercial space (Use Class E), plant, refuse and cycle storage, and associated access and public realm works.

    Decided 13 Mar 2026 Conditions
  • 26/AP/0088 Decided

    5-9 Rockingham Street And 2-4 Tiverton Street London SE1 6PF

    Discharge of obligation 5.1.2. written notice for planning permission 22/AP/1068 dated 16/06/2023 for Redevelopment of site to provide a 24 storey building plus basement consisting of purpose-built student accommodation (Sui Generis), and commercial uses (Use Class E) at ground floor, and the development of the associated railway arches to provide commercial space (Use Class E), plant, refuse and cycle storage, and associated access and public realm works.

    Decided 19 Jan 2026 Conditions
  • 25/AP/3793 Decided

    5-9 Rockingham Street And 2-4 Tiverton Street London SE1 6PF

    Details submitted to satisfy schedule 9 clause 2.1 ('Be seen' energy performance indicators to the Greater London Authority) of the section 106 agreement associated with planning permission ref; 22/AP/1068

    Decided 4 Mar 2026 Conditions
  • 25/AP/3304 Awaiting decision

    5-9 Rockingham Street And 2-4 Tiverton Street London SE1 6PF

    Partial details of condition 18 (Night-time vibration dose values) pursuant to planning permission 22/AP/1068 (Redevelopment of site to provide a 24 storey building plus basement consisting of purpose-built student accommodation (Sui Generis), and commercial uses (Use Class E) at ground floor, and the development of the associated railway arches to provide commercial space (Use Class E), plant, refuse and cycle storage, and associated access and public realm works.)

    Submitted 12 Nov 2025 Conditions
  • 25/AP/3309 Awaiting decision

    5-9 Rockingham Street And 2-4 Tiverton Street London SE1 6PF

    Details submitted to satisfy Schedule 7 Clause 1.1 (Skills and Employment Methodology) of planning permission ref. 22/AP/1068.

    Submitted 11 Nov 2025 Conditions
  • 25/AP/3236 Awaiting decision

    5-9 Rockingham Street And 2-4 Tiverton Street London SE1 6PF

    Details of Condition 11 (Final Surface Water Drainage Strategy) as required by planning permission 22/AP/1068 dated 16/08/2023 for 'Redevelopment of site to provide a 24 storey building plus basement consisting of purpose-built student accommodation (Sui Generis), and commercial uses (Use Class E) at ground floor, and the development of the associated railway arches to provide commercial space (Use Class E), plant, refuse and cycle storage, and associated access and public realm works'.

    Submitted 6 Nov 2025 Conditions
  • 25/AP/2738 Awaiting decision

    5-9 Rockingham Street And 2-4 Tiverton Street London SE1 6PF

    Details of condition 49 'Archaeological reporting' pursuant to planning permission 22/AP/1068 'Redevelopment of site to provide a 24 storey building plus basement consisting of purpose-built student accommodation (Sui Generis), and commercial uses (Use Class E) at ground floor, and the development of the associated railway arches to provide commercial space (Use Class E), plant, refuse and cycle storage, and associated access and public realm works.'

    Submitted 23 Sep 2025 Conditions
  • 25/AP/2588 Awaiting decision

    5-9 Rockingham Street And 2-4 Tiverton Street London SE1 6PF

    Non-Material Amendment to planning permission ref. 22/AP/1068 dated 16/08/2023 for 'Redevelopment of site to provide a 24 storey building plus basement consisting of purpose-built student accommodation (Sui Generis), and commercial uses (Use Class E) at ground floor, and the development of the associated railway arches to provide commercial space (Use Class E), plant, refuse and cycle storage, and associated access and public realm works.' The amendment seeks: - Compliance with the updated Fire Safety Standards BS 9991:2024 - a full review of building regulations compliance has been undertaken as part of the design development which has led to some amendments. - Consideration of the building operation - Since the planning approval, the scheme has been acquired by CKC Properties, on behalf of VC PBSA1 Limited, so a full review has been carried out and has led to some design amendments.

    Submitted 10 Sep 2025 Conditions
  • 23/AP/2920 Decided

    5-9 Rockingham Street And 2-4 Tiverton Street London SE1 6PF

    Non-material amendments to planning permission dated 16.08.2023 ref. 22/AP/1068 for: 'Redevelopment of site to provide a 24 storey building plus basement consisting of purpose-built student accommodation (Sui Generis), and commercial uses (Use Class E) at ground floor, and the development of the associated railway arches to provide commercial space (Use Class E), plant, refuse and cycle storage, and associated access and public realm works' comprising: - amendments to conditions 1 (approved plans) and 2 (time limit and quantum of uses) to amend the description of development to reflect the relocation and consolidation of plant within the northern railway arch and at roof level, removal of the basement, changes to the fenestration and internal layout changes to the majority of the floors.

    Decided 30 Nov 2023 Conditions

Timeline

Dates from the published record

  1. 22 Mar 2022

    Received by Southwark

  2. 24 Mar 2022

    Validated

    Checked as complete and ready for consideration.

  3. 16 Aug 2023

    Decision issued: Major - GRANTED

  4. 11 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

213 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Southwark granted permission on 16 August 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 5-9 Rockingham Street And 2-4 Tiverton Street London SE1 6PF

    25/AP/3304 Submitted 12 Nov 2025 0m away

    96% historically approved · decision due ~7 Jan

    Partial details of condition 18 (Night-time vibration dose values) pursuant to planning permission 22/AP/1068 (Redevelopment of site to provide a 24 storey building plus basement consisting of purpose-built student accommodation (Sui Generis), and commercial uses (Use Class E) at ground floor, and the development of the associated railway arches to provide commercial space (Use Class E), plant, refuse and cycle storage, and associated access and public realm works.)

    Awaiting decision Conditions 3 docs
  • 5 - 9 Rockingham Street London Southwark SE1 6PF

    26/AP/0403 Submitted 11 Feb 2026 0m away

    Details of condition 13 'green roofs' required by planning permission ref. 22/AP/1068 (Redevelopment of site to provide a 24 storey building plus basement consisting of purpose-built student accommodation (Sui Generis), and commercial uses (Use Class E) at ground floor, and the development of the associated railway arches to provide commercial space (Use Class E), plant, refuse and cycle storage, and associated access and public realm works).

    Granted Conditions 9 docs
  • 5-9 Rockingham Street And 2-4 Tiverton Street London SE1 6PF

    25/AP/3309 Submitted 11 Nov 2025 0m away

    96% historically approved · decision due ~6 Jan

    Details submitted to satisfy Schedule 7 Clause 1.1 (Skills and Employment Methodology) of planning permission ref. 22/AP/1068.

    Awaiting decision Conditions 1 doc
  • 5-9 Rockingham Street And 2-4 Tiverton Street London SE1 6PF

    26/AP/0347 Submitted 5 Feb 2026 0m away

    Details of Condition 19 (part a) only) Secured by Design as required by planning permission 22/AP/1068 dated 16/08/2023 for Redevelopment of site to provide a 24 storey building plus basement consisting of purpose-built student accommodation (Sui Generis), and commercial uses (Use Class E) at ground floor, and the development of the associated railway arches to provide commercial space (Use Class E), plant, refuse and cycle storage, and associated access and public realm works.

    Granted Conditions 17 docs
  • 5-9 Rockingham Street And 2-4 Tiverton Street London SE1 6PD

    26/AP/0201 Submitted 23 Jan 2026 0m away

    Details of condition 17 'Materials' as required by planning permission ref no. 22/AP/1068 'Redevelopment of site to provide a 24 storey building plus basement consisting of purpose-built student accommodation (Sui Generis), and commercial uses (Use Class E) at ground floor, and the development of the associated railway arches to provide commercial space (Use Class E), plant, refuse and cycle storage, and associated access and public realm works'.

    Granted Conditions 8 docs
  • 5-9 Rockingham Street And 2-4 Tiverton Street London SE1 6PF

    25/AP/2738 Submitted 23 Sep 2025 0m away

    96% historically approved · decision due ~19 Nov

    Details of condition 49 'Archaeological reporting' pursuant to planning permission 22/AP/1068 'Redevelopment of site to provide a 24 storey building plus basement consisting of purpose-built student accommodation (Sui Generis), and commercial uses (Use Class E) at ground floor, and the development of the associated railway arches to provide commercial space (Use Class E), plant, refuse and cycle storage, and associated access and public realm works.'

    Awaiting decision Conditions 5 docs

In Southwark

  • 26/AP/2031 Granted

    Flat B11, Lloyds Wharf Mill Street London SE1 2BD

    Replacement of existing rooflights and installation of external shutters.

    13 Jul 2026 Full applications
  • 26/AP/2012 Granted

    3 Grange Yard London Southwark SE1 3AE

    Alterations to an existing metal structure located within the courtyard including re-cladding, installation of two openings with roller shutters and three access doors, and installation of six roof lights.

    9 Jul 2026 Full applications
  • 26/AP/1894 Granted

    10 - 18 Union Street London Southwark SE1 1SZ

    Replacement windows and doors to Union Street (South elevation).

    30 Jun 2026 Full applications
  • 26/AP/1772 Granted

    The Admiral Hyson Estate Galleywall Road London Southwark SE16 3PA

    Removal of existing electrical equipment and erection of substation.

    18 Jun 2026 Full applications
  • 26/AP/2127 Granted

    Flat 16 157-163 Queens Road London Southwark SE15 2ND

    Roof terrace on the flat roof adjoining the flat, linked to the existing south-facing balcony; replacement of window with inward-opening aluminium doors; a permanent privacy balustrade.

    20 Jul 2026 Full applications