Skip to content
PlanIndex Get alerts
Menu

Planning application

First Floor Flat 30 Cheltenham Road London Southwark SE15 3AQ

Granted Southwark 20/AP/0532 Minor application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Construction of single storey first floor side infill extension

As published by the council, reference 20/AP/0532

Application record

Reference
20/AP/0532
Type
Minor application
Status
Granted
Decision
Minor - GRANTED
Received
21 Feb 2020
Validated
24 Feb 2020
Decided
17 Apr 2020
Ward
Peckham Rye
Parish
Peckham And Nunhead
Decision by
Delegated Panel - Trees
Postcode
SE15 3AQ

Timeline

Dates from the published record

  1. 21 Feb 2020

    Received by Southwark

  2. 24 Feb 2020

    Validated

    Checked as complete and ready for consideration.

  3. 17 Apr 2020

    Decision issued: Minor - GRANTED

  4. 15 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice registered in London

16 applications on PlanIndex · across 4 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 37 Cheltenham Road London Southwark SE15 3AF

    23/AP/2560 Submitted 12 Sep 2023 79m away

    Prior approval notification for the construction of a single storey rear and side extension measuring 4.92m beyond the rear wall of the original dwellinghouse, 2.27m in height from the eaves and 3m in maximum height. Extension includes two tapered roof lights and part pitched and part tapered roof.

    Granted Full applications Extension Loft or dormer 20 docs
    Small domestic
  • 16 And 18 Reynolds Road London Southwark SE15 3AH

    26/AP/0567 Submitted 25 Feb 2026 87m away

    Construction of a single storey rear and side infill extensions to the ground floors of Nos.16 and 18 Reynolds Road.

    Granted Householder Extension 14 docs
    Small domestic
  • 27 Stuart Road London Southwark SE15 3BE

    26/AP/0681 Submitted 6 Mar 2026 101m away

    Construction of a single storey rear extension

    Granted Householder Extension 8 docs
    Small domestic
  • 263 Peckham Rye London Southwark SE15 3AB

    23/AP/3502 Submitted 18 Dec 2023 104m away

    Construction of front and rear dormer roof extensions, new flat roof to projecting bathroom at first floor and removal of chimney stack

    Granted Householder Extension Loft or dormer 19 docs
    Domestic
  • 68 Cheltenham Road London Southwark SE15 3AQ

    20/AP/2389 Submitted 21 Aug 2020 104m away

    Demolition of the existing rear two-storey lean-to extension, the construction of a proposed single-storey rear and side extension, first floor replacement rear extension

    Granted Householder Extension Demolition 21 docs
    Small domestic
  • The Ivyhouse 40 Stuart Road London Southwark SE15 3BE

    25/AP/2627 Submitted 15 Sep 2025 120m away

    Installation of defibrillator to front elevation of Grade II listed public house

    Granted Lawful development 7 docs

In Southwark

  • 26/AP/1021 Refused

    Davotti Apartments 351 Rotherhithe Street London Southwark SE16 5LJ

    Construction of two additional storeys to provide 4 self-contained flats

    10 Apr 2026 Full applications
  • 26/AP/1371 Granted

    135 Merrow Street London Southwark SE17 2NX

    Providing level access from the street; refurbishment of interior spaces; replacement of the existing rear/side lean-to structure with a new infill arrangement, incorporating a new wall to the Villa Street elevation and the rear courtyard; retention and repair of existing facades including the repainted hand-painted signage; and new electrical supply and mechanical ventilation provision.

    12 May 2026 Full applications
  • 26/AP/1445 Granted

    42A Harper Road London Southwark SE1 6AD

    Retrospective application for the installation of external security shutters and a postbox

    20 May 2026 Full applications
  • 26/AP/1322 Granted

    St Francis R C Primary School Friary Road London Southwark SE15 1RQ

    Installation of 7no. new external air conditioning units.

    7 May 2026 Full applications
  • 26/AP/0780 Granted

    10 Marshalsea Road London Southwark SE1 1HL

    Amalgamation of ground and basement Class (E) with existing first, second and third floor dwelling (C3) to create enlarged dwelling and associated bike and bin stores

    18 Mar 2026 Full applications