Skip to content
PlanIndex Get alerts
Menu

Planning application

Land At Fossetts Farm Sutton Road Southend-on-sea Essex

Awaiting decision Southend-on-Sea 26/01054/AD

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Application for Approval of Details pursuant to condition 07 (details of GRP control panel kiosk to serve pumping station) of planning permission 24/00450/RESM dated 25.07.2025

As published by the council, reference 26/01054/AD

Application record

Reference
26/01054/AD
Status
Registered

Site history

Applications at this address on the Southend-on-Sea register

This site has had 13 applications since 2026: 2 approved, 0 refused.

  • 26/00433/NON Decided

    Land At Fossetts Farm Sutton Road Southend-on-sea Essex

    Variation of Condition 01 (Approved Plans), Condition 10 (Noise Impact Assessment) and Condition 12 (Electric Vehicle Charging Infrastructure) to substitute approved drawings and reports to allow minor amendments to the surface water drainage strategy, including the introduction of a SuDS attenuation pond and a reduction in the number of dwellings from 122 to 119 (Non-material amendment to planning permission 24/00450/RESM dated 25/07/2025)

    Decided 26 May 2026 Amendments
  • 26/00194/AD Granted

    Land At Fossetts Farm Sutton Road Southend-on-sea Essex

    Application for approval of details pursuant to condition 05 (external materials details) of planning permission 24/01115/AMDT dated 07/03/2025

    Decided 15 May 2026 Conditions
  • 26/00192/AMDT Granted

    Land At Fossetts Farm Sutton Road Southend-on-sea Essex

    Application to vary Conditions 02 (Approved Parameter Plans) and 08 (Details of Public Open Space) to allow for amendments to the layout, including revised SuDS arrangements and updated parameter plans (Material Amendment to planning permission 24/01115/AMDT dated 07/03/2025)

    Decided 19 May 2026 Amendments
  • 26/01056/AD Awaiting decision

    Land At Fossetts Farm Sutton Road Southend-on-sea Essex

    Application for approval of details pursuant to condition 02 (planting details and implementation timetable) of planning permission 24/00450/RESM dated 25.07.2025

  • 26/01053/AD Awaiting decision

    Land At Fossetts Farm Sutton Road Southend-on-sea Essex

    Application for approval of details pursuant to condition 10 (post-completion noise survey methodology) of planning permission 26/00192/AMDT dated 19.05.2026

  • 26/01055/AD Awaiting decision

    Land At Fossetts Farm Sutton Road Southend-on-sea Essex

    Application for approval of details pursuant to condition 06 (Scheduled Monument interpretation boards) of planning permission 24/00450/RESM dated 25.07.2025

  • 26/01052/AD Awaiting decision

    Land At Fossetts Farm Sutton Road Southend-on-sea Essex

    Application for approval of details pursuant to condition 08 (public open space) of planning permission 26/00192/AMDT dated 19/05/2026

  • 26/01057/AD Awaiting decision

    Land At Fossetts Farm Sutton Road Southend-on-sea Essex

    Application for approval of details pursuant to condition 05 (yellow lines and signage) of planning permission 24/00450/RESM dated 25.07.2025

  • 26/00883/AD Awaiting decision

    Land At Fossetts Farm Sutton Road Southend-on-sea Essex

    Application for Approval of Details pursuant to conditions 27 (energy efficiency and sustainability measures) and 31 (Glint & Glare Assessment) of planning permission 26/00192/AMDT dated 19.05.26

  • 26/00882/AD Decided

    Land At Fossetts Farm Sutton Road Southend-on-sea Essex

    Application for Approval of Details pursuant to condition 04 (design details) of planning permission 24/00450/RESM dated 25.07.25

Timeline

Dates from the published record

  1. 14 Aug 2026

    Added to PlanIndex

  2. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

    Southend-on-Sea took a median of 59 days over the applications it decided in the last year.

What happens while it is decided

This application is with Southend-on-Sea for determination, against a statutory target of eight weeks. Over the last year Southend-on-Sea's median decision took 59 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Southend-on-Sea's portal will say. Our guide explains the common types.