Planning application
52 - 56 The Ridgeway Westcliff-on-sea Essex
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Application for approval of details pursuant to conditions 07 (details of refuse and re-cycling storage), 08 (details of 10% renewable energy), and 09 (water efficient design measures) of planning permission 24/02015/FUL dated 19/02/2025
As published by the council, reference 25/01565/AD
Application record
- Reference
- 25/01565/AD
- Status
- Decided
- Decision
- Granted As published: Grant Permission
- Received
- 5 Nov 2025
- Validated
- 5 Nov 2025
- Decided
- 30 Sep 2026
- Ward
- Chalkwell
- Decision by
- Delegated
Site history
Applications at this address on the Southend-on-Sea register
This site has had 3 applications since 2025: 2 approved, 0 refused.
-
26/00564/FUL Granted
52 - 56 The Ridgeway Westcliff-on-sea Essex
Alter existing dormers to side elevations install rear balconies to existing first floor flats and alter elevations (part retrospective)
-
26/01210/FUL Awaiting decision
52 - 56 The Ridgeway Westcliff-on-sea Essex
Alter existing dormers to side elevations install rear balcony to existing first floor flat and alter elevations (part retrospective)
Timeline
Dates from the published record
-
5 Nov 2025
Received by Southend-on-Sea
-
23 Jul 2026
Added to PlanIndex
-
30 Sep 2026
Decision issued: Grant Permission
-
30 Sep 2026
Status changed to Decided
Related applications
Cases linked to this one on the register
- Application: 24/02015/FUL (Decided)
Documents
Plans, drawings, consultee responses and the officer's report
Documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Southend-on-Sea granted permission on 30 September 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Southend-on-Sea's portal will say. Our guide explains the common types.