Planning application

Land adjacent to Redbridge Station and The River Test Port of Southampton

Granted Southampton 26/00627/SCR Screening for EIA

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Request for a Screening Opinion under the Town and Country Planning Environmental Impact Assessment, Regulations 2017 for the provision of a Battery Energy Storage System ('BESS') occupying approximately 28.05ha on land adjacent to Redbridge Station and the River Test ('the Site'). The Site is located within the designated industrial area of the Port of Southampton.

As published by the council, reference 26/00627/SCR

Application record

Reference
26/00627/SCR
Type
Screening for EIA
Status
Approved
Decision
No Objection
Received
29 May 2026
Validated
29 May 2026
Decided
20 Jul 2026
Ward
Redbridge
Decision by
Delegated Decision

Site history

Applications at this address on the Southampton register

This site has had 2 applications since 2026: 1 approved, 0 refused.

  • 26/00833/FUL Awaiting decision

    Land adjacent to Redbridge Station and The River Test Port of Southampton

    Proposed battery energy storage system and associated infrastructure including transformer, substation, water tanks, welfare building, storage room, mesh fencing, acoustic fence and engineering works.

    Submitted 17 Jul 2026 Full applications

Timeline

Dates from the published record

  1. 29 May 2026

    Received by Southampton

  2. 20 Jul 2026

    Decision issued: No Objection

  3. 25 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Southampton granted permission on 20 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

In Southampton

  • 26/00477/SCR Granted

    Portswood Water Treatment Works Southern Water Services Kent Road Southampton SO17 2LJ

    Request for a screening opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended) for the installation of water treatment infrastructure.

    22 Apr 2026 Outline
  • 26/00563/P63A Granted

    62 - 64 Granby Grove Southampton SO17 3RZ

    Prior approval for temporary placement of a shipping container

    15 May 2026 Outline
  • 26/00310/P63A Granted

    Land adjacent to Nursing and Midwifery Nightingale Building Building 67 University Road Southampton SO17 1BJ

    Prior approval for erection of substation building

    18 Mar 2026 Outline
  • 26/00008/OUT Refused

    129 Lodge Road Southampton SO14 6QT

    Redevelopment of the site. Erection of a part 3-storey, part 2-storey building containing 8 flats (3x 2-bed maisonettes and 5x 1-bed flats) (Outline application seeking approval for Access, Layout and Scale).

    20 Jan 2026 Outline
  • 26/00080/P63A Awaiting decision

    Nuffield Theatre Building 6 University Road Southampton SO17 1TR

    Prior approval for the demolition and erection of a university building

    23 Jan 2026 Outline