Planning application
26/00479/FUL
144 Athelstan Road Southampton SO19 4DF
Proposal
Formation of a vehicular access with dropped kerb
As published by the council, reference 26/00479/FUL
Timeline
Dates from the published record
-
23 Apr 2026
Received by Southampton
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Southampton for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/00035/FUL Granted
100 Athelstan Road Southampton SO19 4DF
Erection of a rear conservatory.
-
22/01587/FUL Granted
144 Athelstan Road Southampton City Of Southampton SO19 4DF
Conversion of garage to living accommodation including erection of front porch and alterations to ground floor windows (amended description)
-
22/01652/FUL Granted
81 Athelstan Road Southampton SO19 4DE
Various roof extension works and raising roof ridge to facilitate loft conversion
-
26/00197/FUL Awaiting decision
49 Athelstan Road Southampton SO19 4DE
Formation of vehicular access with engineering works and retaining wall to form parking area (part retrospective).
-
22/01159/FUL Granted
72 Chessel Avenue Southampton SO19 4DX
Erection of a first-floor rear extension with roof alterations and internal alterations (amendment to planning permission ref 21/01677/FUL)
-
26/00825/FUL Awaiting decision
8 Chessel Avenue Southampton SO19 4DX
Erection of a 2-storey side extension and single storey rear extension.
Other full applications applications
In Southampton
-
26/00584/FUL Granted
2 Russell Place Southampton SO17 1NU
Replacement front fence and gates
-
26/00031/FUL Granted
42 High Street Southampton SO14 2NS
External alterations to ground floor, two-storey infill extension and rebuild first floor to create a ground floor commercial unit and 7 x one-bedroom flats with associated bin and cycle storage facilities
-
26/00837/FUL Awaiting decision
7 Leaside Way Southampton SO16 3DN
Replacement windows.
-
26/00822/FUL Awaiting decision
44 St Mary Street Southampton SO14 1NR
Erection of a first-floor rear extension and addition of a second floor to create 4x studio flats.
-
26/00642/FUL Granted
6 Emerald Close Southampton SO19 7ND
Erection of a single-storey rear extension and installation of decking.