Planning application

Above Bar Street Entrace West Quay Shopping Centre Southampton

Granted Southampton 26/00292/FUL Full Application

Works: Demolition Windows or glazing

Relates to 26/00293/ADV

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Reconfiguration of existing Above Bar Street Entrance to Westquay Shopping Centre including demolition of existing canopy and erection of replacement canopy structure, installation of digital media screen, replacement entrance glazing, external lighting and associated works. (submitted in conjunction with: 26/00293/ADV)

As published by the council, reference 26/00292/FUL

Application record

Reference
26/00292/FUL
Type
Full Application
Status
Approved
Decision
Approve with Conditions
Received
16 Mar 2026
Validated
16 Mar 2026
Decided
13 May 2026
Ward
Bargate
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 16 Mar 2026

    Received by Southampton

  2. 13 May 2026

    Decision issued: Approve with Conditions

  3. 25 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

  • 26/00293/ADV Granted

    Above Bar Street Entrance West Quay Shopping Centre Southampton

    Installation of 1 x digital display sign, 1 x internally illuminated sign and 2 x non illuminated signs (submitted in conjunction with 26/00292/FUL).

    Decided 13 May 2026 Advertising

1 later application on the register refers to this one:

  • 26/00293/ADV Granted

    Above Bar Street Entrance West Quay Shopping Centre Southampton

    Installation of 1 x digital display sign, 1 x internally illuminated sign and 2 x non illuminated signs (submitted in conjunction with 26/00292/FUL).

    Decided 13 May 2026 Advertising

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Southampton granted permission on 13 May 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Southampton

  • 25/01090/FUL Granted

    Land Adjacent, 20 Alfriston Gardens Southampton SO19 8GA

    Erection of a 2/3 storey, 3-bedroom dwelling and associated amenities. (resubmission of 21/01536/FUL) (amended after validation to remove rooms in the roof)

    11 Dec 2025 Full applications
  • 26/00995/FUL Awaiting decision

    Land Adj 20 Edwina Close Southampton SO19 7BH

    Erection of a 2 x two-storey dwellings (2 x 2-bedroom) with associated amenities.

    Full applications
  • 26/00959/FUL Awaiting decision

    88 Bluebell Road Southampton SO16 3LP

    Erection of two storey side extension and bin storage to the front.

    Full applications
  • 26/00873/FUL Awaiting decision

    Highcliff House Highcliff Avenue Southampton SO14 0TN

    Conversion of ground floor flat to 2x1 bed flats with external alterations

    Full applications
  • 26/01022/FUL Awaiting decision

    293 Coxford Road Southampton SO16 5LD

    Change of use from dwelling house (Class C3) to house in multiple occupation (HMO Class C4) with loft conversion with roof alterations and dormer on rear elevation with a single-storey rear extension and associated amenities

    Full applications