Planning application
25/01456/DIS
52 - 54 Waterloo Road Southampton SO15 3BE
Proposal
Application for approval of details reserved by conditions 07 (Energy Efficiency) and 08 (Water efficiency) of planning permission ref 24/01031/FUL for 7 flats.
As published by the council, reference 25/01456/DIS
Timeline
Dates from the published record
-
18 Nov 2025
Received by Southampton
-
17 Dec 2025
Decision issued: No Objection
-
25 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
26/00831/DIS Awaiting decision
92 - 94 Waterloo Road Southampton SO15 3BE
Application for approval of details reserved by conditions 13 (Construction Management Plan), 14 (Surface/Foul Water Drainage), 15 (Public Sewer protection), 18 (Water & Energy) and 20 (Landscaping, lighting & means of enclosure detailed plan) of permission 25/01471/FUL for 3 dwellings.
-
26/00487/DIS Awaiting decision
52 - 54 Waterloo Road Southampton SO15 3BE
Application for approval of details reserved by condition 3 (Foul and surface water sewerage disposal), 4 (Landscaping, lighting & means of enclosure), 9 (Ecological Mitigation and Enhancement) and 14 (Cycle Storage) of planning permission ref 24/01031/FUL for 7 flats.
-
24/00268/TPO Granted
70A Waterloo Road Southampton SO15 3BE
G1 - Lawson Cypress - Remove overhang back to boundary
-
26/00784/FUL Awaiting decision
86 Waterloo Road Southampton SO15 3BE
Change of use from 6-person House in Multiple Occupation (Class C4) to House in Multiple Occupation (Class Sui Generis) for 7 person occupancy (retrospective)
-
25/01471/FUL Granted
92 - 94 Waterloo Road Southampton SO15 3BE
Redevelopment of the site and erection of 3 x 4 bed houses
-
25/01164/FUL Granted
11 Dymott Close Southampton SO15 3HG
Replacement window and door.
Other conditions applications
In Southampton
-
26/00781/DIS Granted
165 - 168 High Street Southampton SO14 2NZ
Application for approval of details reserved by condition 2 (Basement Flooring), 3 (Stairwell), 4 (Tiling), 5 (Mechanical Works) and 6 (Repairs) of permission 25/00894/LBC for basement works
-
26/00128/DIS Granted
Sea Dreged Aggregate Plant Leamouth Wharf Belvidere Road Southampton SO14 5RF
Application for approval of details reserved by condition 9 (piling) of planning permission ref 21/01601/FUL for redevelopment of the site.
-
26/00619/DIS Granted
Land Adj 40 Hawthorn Road Southampton City of Southampton SO17 1PX
Application for approval of details reserved by condition 05 (Land Contamination investigation and remediation) of permission 22/00858/OUT for a dwelling.
-
25/01338/DIS Granted
Southampton Sports Centre Thornhill Road Southampton SO16 7AY
Application for approval of details reserved by conditions 4 (materials), 20 (green roof/ wall specification) and 21 (sustainable measures) of planning permission ref 24/00601/MMA for community hub, athletics and snow sports buildings.
-
25/01196/DIS Split decision
19 - 21 Botany Bay Road Southampton SO19 8LT
Application for approval of details reserved by condition 3(Land Contamination investigation and remediation) of permission 24/00659/FUL for part demolition of existing building and side extension to create additional garage workspace together with reconstruction of failed retaining wall