Skip to content
PlanIndex Get alerts
Menu

Planning application

25/01312/FUL

1 Culver Close Southampton SO16 9HZ

Granted Southampton Full Application

Proposal

Replacement windows and door to rear elevation and erection of 1.8m fence around garden and increase height of existing boundary wall with 500mm high timber cladding

As published by the council, reference 25/01312/FUL

Timeline

Dates from the published record

  1. 15 Oct 2025

    Received by Southampton

  2. 10 Dec 2025

    Decision issued: Approve with Conditions

  3. 25 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25/01518/FUL Granted

    17 Seacombe Green Southampton SO16 9HU

    Erection of single-storey front extension

    3 Dec 2025 148m away Full applications
  • 26/00480/FUL Awaiting decision

    8 Thorness Close Southampton SO16 9JE

    Change of use from a dwelling house to an assisted living dwelling for 3 no. young persons (class C2).

    24 Apr 2026 149m away Full applications
  • 22/00268/TPO Granted

    72B Porlock Road Southampton SO16 9JD

    T1 Large Mature Poplar - Remove/reduce all overhanging branches back to the fence boundary from over carpark/garden/building T2 Hornbeam - Reduce height to 3ft below top floor window, Reduce inside 1,5ft away from building, Shape remaining crown in proportion T3 Sycamore x2 - Fell to ground level

    26 Oct 2022 167m away Trees
  • 20/00024/FUL Granted

    Mansel Park Kendal Avenue Southampton SO16 9LT

    Erection of standing / seated stands.

    8 Jan 2020 211m away Full applications
  • 25/01394/T5DAYN Decided

    2 New Cottages Lower Brownhill Road Southampton SO16 9LL

    T1 Ash- A badly decayed standing ash stem, fell with winch to a low stump 1 metre above ground level

    4 Nov 2025 415m away
  • 25/00298/TPO Granted

    2 New Cottages Lower Brownhill Road Southampton SO16 9LL

    T2 Ash - Badly decayed with Ganoderma at the old coppice base, fell to ground level utilising a 21 to 27 metre MEWP G3 Cypress - 6 trees growing adjacent to the rear drive way, reduction of all 6 trees to 8 metres above ground level to remove shade from the solar panels.

    11 Dec 2025 415m away Trees

In Southampton

  • 26/00584/FUL Granted

    2 Russell Place Southampton SO17 1NU

    Replacement front fence and gates

    5 Jun 2026 Full applications
  • 26/00031/FUL Granted

    42 High Street Southampton SO14 2NS

    External alterations to ground floor, two-storey infill extension and rebuild first floor to create a ground floor commercial unit and 7 x one-bedroom flats with associated bin and cycle storage facilities

    23 Jan 2026 Full applications
  • 26/00837/FUL Awaiting decision

    7 Leaside Way Southampton SO16 3DN

    Replacement windows.

    24 Jul 2026 Full applications
  • 26/00822/FUL Awaiting decision

    44 St Mary Street Southampton SO14 1NR

    Erection of a first-floor rear extension and addition of a second floor to create 4x studio flats.

    24 Jul 2026 Full applications
  • 26/00642/FUL Granted

    6 Emerald Close Southampton SO19 7ND

    Erection of a single-storey rear extension and installation of decking.

    3 Jun 2026 Full applications