Planning application
9 Chetwynd Drive Southampton SO16 3HY
Works: Extension Loft or dormer Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Application for a lawful development certificate for a proposed single-storey side extension and loft conversion including rear hip to gable extension and side rooflights
As published by the council, reference 22/01636/PLDC
Application record
- Reference
- 22/01636/PLDC
- Type
- Lawful Devt Certificate Proposed Use
- Status
- Approved
- Decision
- Granted As published: Grant (LDC)
- Received
- 5 Dec 2022
- Validated
- 5 Dec 2022
- Decided
- 18 Jan 2023
- Ward
- Bassett
- Decision by
- Delegated Decision
- Postcode
- SO16 3HY
Site history
Applications at this address on the Southampton register
This site has had 4 applications since 2022: 2 approved, 0 refused.
-
22/01645/PAH Granted
9 Chetwynd Drive Southampton SO16 3HY
Erection of a single storey rear extension (Max Depth 4.4 m, Max Height 3.5 m, Eaves Height 2.7 m)
-
22/01177/FUL Withdrawn
9 Chetwynd Drive Southampton SO16 3HY
Alterations to the roof including hip to gable roof extension and rear dormer; and single-storey side and rear extensions.
-
22/00811/FUL Withdrawn
9 Chetwynd Drive Southampton SO16 3HY
Erection of a single storey side/rear extension and roof enlargement works including hip to gable, rear dormer and raising roof height to facilitate loft conversion
Timeline
Dates from the published record
-
5 Dec 2022
Received by Southampton
-
18 Jan 2023
Decision issued: Grant (LDC)
-
27 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Southampton granted permission on 18 January 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About lawful development applications
A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
9 Chetwynd Drive Southampton SO16 3HY
Erection of a single storey rear extension (Max Depth 4.4 m, Max Height 3.5 m, Eaves Height 2.7 m)
Granted Prior approval Extension 4 docsSmall domestic -
9 Chetwynd Drive Southampton SO16 3HY
Erection of a single storey side/rear extension and roof enlargement works including hip to gable, rear dormer and raising roof height to facilitate loft conversion
Withdrawn Full applications Extension Loft or dormer 2 docsSmall domestic -
9 Chetwynd Drive Southampton SO16 3HY
Alterations to the roof including hip to gable roof extension and rear dormer; and single-storey side and rear extensions.
Withdrawn Full applications Extension Loft or dormer 5 docsSmall domestic -
The Church Of Jesus Christ Of Latter Day Saints Chetwynd Road Southampton SO16 3JA
GC005662 - ASH - Fell Stump. GC005666 - Holly - Crown lift over footway - Crown Lift Over Footpath to 2.5m. GC005669 - False Acacia- Crown Lift Over Footpath to 2.5m GC005672 - English Oak - Crown Lift Over Footpath to 2.5m GC005681 - Black Popular - Remove Basal and Epicormic Growth up to 2.5m and Crown reduce all 4 primary limbs to suitable growthpoints retaining a balanced canopy by no more than 2.5 m. GC005688 - Crown reduce by 2m to leave low crown. GC005689 - Remove Basal and Epicormic Growth by up to 2.5m - Remove all basal growth including maturing basal stems and dead growth.
Granted Trees 3 docs -
The Church of Jesus Christ of Latter Day Saints Chetwynd Road Southampton SO16 3JA
A-1 T-1, T-7 Oak trees (Quercus robur) x 2, T-2, T-3, T-4, T-7, T-8 Sycamore trees (Acer pseudoplatanus) x 5, T-5, Horse chestnut tree (Aesculus hippocastanum) x1 - cut back limbs by approx. 5-6 metres from growing tip to lateral crown, cut back from road by approx. 6 metres from ground level, average height of trees approx. 20 metres. A-2 T-9, T-11 lime trees (Tilia europaea) x2, T-10, T-12, T-13, Sycamore trees (Acer pseudoplatanus) x 3, T14, T-16, Tiputree trees (Tipuana tipu) x2, T-15, Oak tree (Quercus robur) x 1 - cut back limbs by approx. 3-4 metres from growing tip to lateral crown, cut back from road by approx. 3 metres from ground level, average height of trees approx. 20 metres.
Refused Trees 4 docs -
Chamberlain Halls of Residence Glen Eyre Road Southampton
T1 Beech - 3m Crown reduction on the North East sign lower to mid canopy
Granted Trees 4 docs
Other lawful development applications
In Southampton
-
26/00650/PLDC Refused
158 Millbrook Road East Southampton SO15 1JR
Application for a lawful development certificate for proposed use as offices (use class E).
-
26/00626/ELDC Granted
82 Newcombe Road Southampton SO15 2FS
Application for a lawful development certificate for the existing use as a house in multiple occupation (HMO, Class C4).
-
26/00647/ELDC Granted
18 Howard Road Southampton SO15 5BN
Application for a lawful development certificate for the existing use as a 7-bedroom house in multiple occupation (HMO, Sui Generis)
-
26/00564/ELDC Granted
61 Newcombe Road Southampton SO15 2FT
Application for a lawful development certificate for the existing use as a house in multiple occupation (HMO, Class C4)
-
26/00637/PLDC Granted
92 Kennedy Road Southampton SO16 5DQ
Application for a lawful development certificate for a proposed single-storey rear extension.