Skip to content
PlanIndex Get alerts
Menu

Planning application

22/01320/FUL

48 Downside Avenue Southampton SO19 7BT

Granted Southampton Full Application

Proposal

Erection of a single storey rear extension and installation of front dormer window

As published by the council, reference 22/01320/FUL

Timeline

Dates from the published record

  1. 5 Oct 2022

    Received by Southampton

  2. 30 Nov 2022

    Decision issued: Approve with Conditions

  3. 27 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 22/01259/PLDC Granted

    48 Downside Avenue Southampton SO19 7BT

    Application for a lawful development certificate for installation of a proposed rear dormer window to facilitate loft conversion.

    9 Sep 2022 0m away Lawful development
  • 26/00125/TPO Refused

    36A Spring Road Southampton SO19 2BG

    T2-480 - Robinia psuedoacacia - Reduce to a snag at 4m for wildlife

    4 May 2026 146m away Trees
  • 26/00404/PLDC Granted

    25 Redlands Drive Southampton SO19 7DA

    Application for a lawful development certificate for a proposed single storey side extension

    9 Apr 2026 160m away Lawful development
  • 25/01384/PAH Granted

    25 Redlands Drive Southampton SO19 7DA

    Erection of a single storey rear extension (Max Depth 3.17m, Max Height 3.45m, Eaves Height 3m)

    3 Nov 2025 160m away Prior approval
  • 26/00017/FUL Granted

    9 Deacon Crescent Southampton SO19 7BS

    Erection of single storey side extension, new front porch, change to flat roof on existing single storey rear extension and roof alterations to include hip to gable and rear dormer windows to facilitate loft conversion.

    8 Jan 2026 166m away Full applications
  • 25/01011/FUL Granted

    86 Spring Road Southampton SO19 2BL

    Formation of a vehicular access with dropped kerb.

    10 Nov 2025 178m away Full applications

In Southampton

  • 26/00584/FUL Granted

    2 Russell Place Southampton SO17 1NU

    Replacement front fence and gates

    5 Jun 2026 Full applications
  • 26/00031/FUL Granted

    42 High Street Southampton SO14 2NS

    External alterations to ground floor, two-storey infill extension and rebuild first floor to create a ground floor commercial unit and 7 x one-bedroom flats with associated bin and cycle storage facilities

    23 Jan 2026 Full applications
  • 26/00837/FUL Awaiting decision

    7 Leaside Way Southampton SO16 3DN

    Replacement windows.

    24 Jul 2026 Full applications
  • 26/00822/FUL Awaiting decision

    44 St Mary Street Southampton SO14 1NR

    Erection of a first-floor rear extension and addition of a second floor to create 4x studio flats.

    24 Jul 2026 Full applications
  • 26/00642/FUL Granted

    6 Emerald Close Southampton SO19 7ND

    Erection of a single-storey rear extension and installation of decking.

    3 Jun 2026 Full applications