Skip to content
PlanIndex Get alerts
Menu

Planning application

38 Brookside Avenue Southampton SO15 4HZ

Granted Southampton 22/00539/FUL Full Application

Works: Extension Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of a single-storey rear/side extension following demolition of conservatory

As published by the council, reference 22/00539/FUL

Application record

Reference
22/00539/FUL
Type
Full Application
Status
Approved
Decision
Approve with Conditions
Received
26 Apr 2022
Validated
26 Apr 2022
Decided
20 Jun 2022
Ward
Millbrook
Decision by
Delegated Decision
Postcode
SO15 4HZ

Timeline

Dates from the published record

  1. 26 Apr 2022

    Received by Southampton

  2. 20 Jun 2022

    Decision issued: Approve with Conditions

  3. 4 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 59 King Georges Avenue Southampton City Of Southampton SO15 4JU

    22/00672/FUL Submitted 4 May 2022 37m away

    Erection of a single-storey rear extension with raised access steps to garden

    Granted Full applications Extension 4 docs
    Small domestic
  • 38 Brookside Avenue Southampton SO15 4HZ

    21/00863/FUL Submitted 3 Jun 2021 66m away

    Erection of a two-storey rear extension with hip pitched roof following demolition of conservatory.

    Granted Full applications Extension Demolition 13 docs
  • 93 A Elmes Drive Southampton SO15 4PG

    26/00121/DIS Submitted 3 Feb 2026 69m away

    Application for approval of details reserved by condition 3 (building materials), 4 (Construction Management Plan), 13 (Public Sewer Protection), 14 (Foul Water and Surface Water Drainage), 15 (Water & Energy) and 17 (Land Contamination) of planning permission 23/00150/FUL for the erection of a detached 3 bed house.

    Split decision Conditions 15 docs
  • Land Adj 93 Elmes Drive Southampton SO15 4PG

    22/01202/FUL Submitted 2 Sep 2022 69m away

    Erection of a detached 2-bedroom dwelling with parking and associated storage

    Granted Full applications 16 docs
    Domestic
  • Tanners Brook Primary School Elmes Drive Southampton SO15 4PF

    26/00303/PSHMA Submitted 17 Mar 2026 143m away

    91% historically approved · decision due ~16 Jun

    Demolition of existing school buildings and replacement with a new 2 storey primary school building over a phased programme (no increase to pupil capacity or parking), installation of a Multi-Use Games Area including community use outside school hours, with associated works, landscaping and reconfiguration of parking areas

    Awaiting decision Full applications Demolition 38 docs
    Major scheme
  • Tanners Brook Primary School Elmes Drive Southampton SO15 4PF

    21/00364/TPO Submitted 15 Dec 2021 152m away

    Alder - Crown Raise by 5 metres wounds no larger than 75mm. From Tree Survey tree number 2074 Ash - Crown Raise by 5 metres wounds no larger then 75mm. From Tree Survey tree number 2063. This tree is also suffering with Ash Die Back. Ash - Crown Raise by 5 metres wounds no larger then 75mm. From Tree Survey tree number 2062. This tree is also suffering with Ash Die Back. Cherry - Cut away from phone line by 1 metre. Beech - Crown Raise by 5 metres wounds no larger then 75mm. From Tree Survey tree number 2059. Beech - Crown Raise by 5 metres wounds no larger then 75mm. From Tree Survey tree number 2029.

    Refused Trees 6 docs

In Southampton

  • 25/01090/FUL Granted

    Land Adjacent, 20 Alfriston Gardens Southampton SO19 8GA

    Erection of a 2/3 storey, 3-bedroom dwelling and associated amenities. (resubmission of 21/01536/FUL) (amended after validation to remove rooms in the roof)

    11 Dec 2025 Full applications
  • 26/00995/FUL Awaiting decision

    Land Adj 20 Edwina Close Southampton SO19 7BH

    Erection of a 2 x two-storey dwellings (2 x 2-bedroom) with associated amenities.

    Full applications
  • 26/00959/FUL Awaiting decision

    88 Bluebell Road Southampton SO16 3LP

    Erection of two storey side extension and bin storage to the front.

    Full applications
  • 26/00873/FUL Awaiting decision

    Highcliff House Highcliff Avenue Southampton SO14 0TN

    Conversion of ground floor flat to 2x1 bed flats with external alterations

    Full applications
  • 26/00486/FUL Granted

    72 - 74 Anglesea Road Southampton SO15 5QS

    Installation of cycle storage and amended bin store arrangement (linked with 26/00490/PA56)

    27 Apr 2026 Full applications