Planning application
Land At junction of Whitworth Crescent and Cobden Avenue Southampton
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Prior Approval sought for the installation of telecommunications equipment including 20 metre high monopole supporting 6 x antennas, 2 no. transmission dishes and 4 x equipment cabinets
As published by the council, reference 20/00750/TCC
Application record
- Reference
- 20/00750/TCC
- Type
- Telecommunications Prior Approval
- Status
- Approved
- Decision
- Granted As published: No Objection
- Received
- 10 Jun 2020
- Validated
- 10 Jun 2020
- Decided
- 31 Jul 2020
- Ward
- Bitterne Park
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
10 Jun 2020
Received by Southampton
-
31 Jul 2020
Decision issued: No Objection
-
11 Oct 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Southampton granted permission on 31 July 2020, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About telecoms applications
Telecoms applications cover masts, antennas and cabinets, usually as prior approval cases where the council considers siting and appearance only. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
1 Manor Farm Road Southampton SO18 1NN
Erection of a first floor extension and fire escape staircase to roof (part retrospective)
Granted Full applications Extension 12 docs -
1 Manor Farm Road Southampton SO18 1NN
Change of use from restaurant to a community/cultural centre (class D1/D2)
Granted Full applications 11 docs -
6 The Triangle Cobden Avenue Southampton SO18 1FZ
Loft conversion and erection of balcony on front elevation
Granted Full applications Loft or dormer 7 docs -
2-4 Cobden Avenue Southampton SO18 1FX
Installation of a shipping container to accommodate hot food takeaway with associated stepped access from Whitworth Crescent.
Granted Full applications 17 docs -
17 Manor Farm Road Southampton SO18 1NN
Installation of Plant Equipment
Granted Full applications 7 docs -
6 St Catherines Road Southampton SO18 1LJ
91% historically approved · decision due ~11 Sep
Change of use from residential dwelling (Class C3) to house in multiple occupation (Class C4) with associated amenities. (amended after validation to remove reference to flats, which already have planning consent)
Awaiting decision Full applications New dwelling 5 docsDomestic
Other telecoms applications
In Southampton
-
21/00819/TCC Granted
Compass House Romsey Road Southampton
Installation of rooftop telecommunications equipment and ancillary works
-
22/00356/TCC Granted
Southampton Solent University Reginald Mitchell Building East Park Terrace Southampton SO14 0YN
Removal of 6no. antennas fixed atop the building to be replaced by 6no. antennas to a maximum height of 43.20m AGL together with ancillary development thereto including the removal and replacement of ERS units, a safety handrail and internal cabinet upgrade.
-
21/01668/TCC Granted
Land adjacent to Bursledon Road Upper Deacon Road Southampton
Installation of telecommunications equipment including 15m high monopole, equipment cabinets and ancillary works to facilitate 5G network
-
21/01702/TCC Refused
Land adjacent Avenue Court The Avenue Southampton
Installation of telecommunications equipment including 15m high monopole, equipment cabinets and ancillary works to facilitate 5G network
-
21/01551/TCC Granted
Telecommunications Equipment adjacent 129-155 Empress Road Southampton
Installation of telecommunications equipment including 20m high monopole, equipment cabinets and ancillary works to facilitate 5G network