Planning application
Land At Grange Farm School Lane Coven
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Outline planning application (with all matters reserved except primary means of vehicular access from Brewood Road) for the construction of up to 150 dwellings, health hub, first school expansion land, associated access, flood storage area, drainage, green and blue infrastructure, ground remodelling and ancillary infrastructure
As published by the council, reference 25/00686/OUTM
Application record
- Reference
- 25/00686/OUTM
- Status
- Application approved with conditions
- Decision
- Granted As published: APPROVED Subject to Conditions
- Received
- 8 Aug 2025
- Validated
- 28 Aug 2025
- Decided
- 16 Oct 2026
- Ward
- Brewood, Coven & Blymhill
- Parish
- BREWOOD & COVEN
Timeline
Dates from the published record
-
8 Aug 2025
Received by South Staffordshire
-
28 Aug 2025
Validated
Checked as complete and ready for consideration.
-
23 Jul 2026
Added to PlanIndex
-
16 Oct 2026
Decision issued: APPROVED Subject to Conditions
-
16 Oct 2026
Status changed to Application approved with conditions
Previously Awaiting decision.
Documents
The council's own list, drawings first
44 documents on file for this application
Drawings (7)
- Proposed catchment plan
- Development framework plan
- Amended illustrative southern boundary vignette
- Access arrangement
- Development framework plan
- Site location plan
- Existing catchment plan
Everything on file (42)
- SOS LETTER-LPA TO DECIDE APPLICATION
- BIODIVERSITY METRIC
- BNG TECH NOTE
- NATIONAL HIGHWAYS TECHNICAL NOTE
- AMENDED - WOODS HARWICK RESPONSE TO LLFA
- AMENDED - STORM NETWORK CALCULATIONS
- AMENDED - SURFACE AND FOUL WATER DRAINAGE STRATEGY
- AMENDED - EXISTING CATCHMENT PLAN
- AMENDED - PROPOSED CATCHMENT PLAN
- AMENDED - FLOOD EXCEEDANCE PLAN
- AMENDED - GREENFIELD RUNOFF RATE ESTIMATION
- AMENDED - DEVELOPMENT FRAMEWORK PLAN
- AMENDED - ILLUSTRATIVE SOUTHERN BOUNDARY VIGNETTE
- AMENDED - HYDRAULIC MODELLING STUDY
- AMENDED - TECHNICAL NOTE ADDENDUM HYDRAULIC MODELLING REPORT
- AMENDED - PHASE II GROUND INVESTIGATION REPORT
- ACCESS ARRANGEMENT
- HRA
- PHASE I DESK STUDY REPORT
- APPLICATIONFORMREDACTED
- SUPERSEDED
- GEOPHYSICAL SURVEY REPORT
- LANDSCAPE AND VISUAL IMPACT ASSESSMENT
- STATEMENT OF COMMUNITY ENGAGEMENT
- ALC REPORT 29.05.25
- ARBORICULTURAL ASSESSMENT
- SITE LOCATION PLAN
- DEVELOPMENT FRAMEWORK PLAN
- PLANNING STATEMENT
- AFFORDABLE HOUSING STATEMENT
- COVERING LETTER
- TRANSPORT ASSESSMENT
- RESIDENTIAL TRAVEL PLAN
- HERITAGE STATEMENT.
- LANDSCAPE AND VISUAL IMPACT ASSESSMENT FIGURES
- ECOLOGICAL APPRAISAL
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATERGY - REV B.
- DESIGN AND ACCESS STATEMENT (PART 2 OF 2)
- DESIGN AND ACCESS STATEMENT (PART 1 OF 2)
- ARCHAEOLOGICAL DESK-BASED ASSESSMENT
- ACOUSTICS ASSESSMENT.
- SUPERSEDED
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you the drawings on every job in your area. 14 days free.
What this grant of permission means
South Staffordshire granted permission on 16 October 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on South Staffordshire's portal will say. Our guide explains the common types.