Planning application

29 South Crescent Featherstone WOLVERHAMPTON WV10 7AU

Granted South Staffordshire 24/00936/LHSHLD Pr Appr - Larger Household

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

6 metres single storey rear extension

As published by the council, reference 24/00936/LHSHLD

Application record

Reference
24/00936/LHSHLD
Type
Pr Appr - Larger Household
Status
Awaiting decision
Decision
Prior Approval Permission not required
Received
28 Oct 2024
Validated
6 Nov 2024
Decided
10 Dec 2024
Ward
Featherstone, Shareshill & Saredon
Parish
FEATHERSTONE & BRINSFORD
Decision by
Delegated Decision
Postcode
WV10 7AU

Timeline

Dates from the published record

  1. 28 Oct 2024

    Received by South Staffordshire

  2. 6 Nov 2024

    Validated

    Checked as complete and ready for consideration.

  3. 10 Dec 2024

    Decision issued: Prior Approval Permission not required

  4. 26 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 31 North Crescent Featherstone Staffordshire WV10 7AY

    21/00516/FUL Submitted 3 May 2021 151m away

    Single storey extension to side and rear with porch and canopy to front

    Granted Full applications Extension 9 docs
    Small domestic
  • 29 North Crescent Featherstone Staffordshire WV10 7AY

    22/01052/FUL Submitted 10 Nov 2022 155m away

    Covered Area (with glass roof) Office/store

    Granted Full applications 7 docs
  • 54 Hilton Road Featherstone WOLVERHAMPTON WV10 7AN

    24/00616/FULHH Submitted 19 Jul 2024 228m away

    Erection of two-storey side and single storey rear extension.

    Granted Householder Extension 7 docs
    Small domestic
  • 69 Hilton Road Featherstone Staffordshire WV10 7AL

    21/00401/FUL Submitted 12 Apr 2021 246m away

    Proposed single storey side and rear extension

    Granted Full applications Extension 7 docs
    Small domestic
  • Red White And Blue Cannock Road Featherstone WOLVERHAMPTON WV10 7AD

    24/00663/COND Submitted 19 Mar 2026 277m away

    Discharge of condition 6 (Highways Construction Method Statement) of permission 24/00663/FULM

    Granted Conditions 4 docs
  • Red White And Blue Cannock Road Featherstone WOLVERHAMPTON WV10 7AD

    24/00663/AMEND2 Submitted 5 May 2026 277m away

    Non-material ammendment. No development, excluding any works of demolition/site clearance, shall take place until a Construction Surface Water Management Plan which sets out how surface water would be managed during the construction phase, including flow rates and measures to prevent flood and pollution risk has been submitted to and approved in writing by the local planning authority. The approved Construction Surface Water Management Plan shall be implemented in accordance with the approved details before development works commence (excluding demolition) of application for application 24/00663/FULM

    Granted Amendments Demolition 3 docs

In South Staffordshire

  • 26/00041/FULM Refused

    Former Adult Training Centre Histons Hill Codsall WV8 1AA

    Demolition of existing building and redevelopment for Residential Extra Care (Use Class C2) comprising of apartments and care dwellings, access off Histons Hill, landscaping, and associated infrastructure

    19 Jan 2026 Full applications
  • 26/00219/FUL Granted

    Peppers Prospect County Lane Kingswood WOLVERHAMPTON WV7 3AS

    Proposed 1No. detached replacement dwelling

    6 Mar 2026 Full applications
  • 26/00016/FUL Granted

    The Haven Manor Lane Bobbington STOURBRIDGE DY7 5EG

    Proposed front extension to the existing dwelling to create additional living accommodation to form an annexe.

    7 Jan 2026 Full applications
  • 26/00727/FUL Awaiting decision

    17 White Hill Kinver STOURBRIDGE DY7 6AP

    Residential development comprising the erection of 7 dwellings

    22 Aug 2026 Full applications
  • 26/00714/FUL Awaiting decision

    Land At Silver Birch Road Huntington CANNOCK WS12 4QN

    Demolition of existing shared domestic detached garage block (10No. individual garages) and erection of 2No. detached two-bedroom dwelling (bungalows) and partially rebuilt detached shared garage block

    20 Aug 2026 Full applications