Planning application
Store on Land West of The Priory The Priory Britwell Salome Oxon
Works: Demolition
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Discharge of condition 4(remediation verification report) on application ref. P22/S0500/FUL Demolition of existing structures and site preparation. Erection of two no. dwellings and related works.
As published by the council, reference P26/S3715/DIS
Application record
- Reference
- P26/S3715/DIS
- Type
- Discharge Conditions
- Status
- Consultation Period
- Decision
- Application is not yet decided
- Received
- 24 Aug 2026
- Validated
- 1 Sep 2026
- Decision by
- Not Yet Recommended
Comment by 29 September 2026
The council is taking comments on this application until then. Comments go to South Oxfordshire through their own planning portal.
Timeline
Dates from the published record
-
24 Aug 2026
Received by South Oxfordshire
-
1 Sep 2026
Validated
Checked as complete and ready for consideration.
-
12 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
2 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsAfter the decision
South Oxfordshire has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Other condition discharge and variation applications
In South Oxfordshire
-
P26/S2980/S73 Granted
Rectory Pavilion, Chinnor Rugby Football Club Kingsey Road Thame OX9 3JL
Variation of condition 4 (Hours of use of floodlighting), of planning permission P26/S1549/FUL (Construction of 8 floodlights with luminaires to provide floodlighting to existing rugby pitch following removal of existing lights).
-
P26/S3564/DIS Granted
Newlands, Northend, Henley-on-Thames, RG9 6LQ
Discharge of conditions 7 (surface water drainage works) and 8 (foul drainage works) on application ref. P25/S0770/S73 Variation of condition 2 (approved plans) on application P23/S2783/FUL (Demolition of the existing dwelling and erection of replacement dwelling with associated parking and landscaping) - brick work in lieu of render.
-
P26/S2573/DIS Granted
The Boathouse, 2 The Moorings, Sheepwash Lane, Whitchurch-on-Thames, RG8 7RA
Discharge of Conditions 5 (Construction Environmental Management Plan), 6 (Bat & Bird Boxes) and 7 (Lighting) on Planning Permission P26/S0178/FUL (Demolition of existing and construction of a self-build replacement boathouse incorporating a wet dock, dry boat store and workshop at ground level, with two-bedroom residential accommodation above).
-
P26/S3287/DIS Granted
Two Tanners Cottages 25 Tanners Lane Chalkhouse Green Reading RG4 9AE
Discharge of conditions 6(construction method statement for bats) and 7(enhancements for bats (and nesting birds)) on application ref. P24/S3165/HH Two storey side/rear extension. Single storey rear extension. Front porch extension.
-
P26/S1773/DIS Granted
Land at Oxford Brookes University Wheatley Campus Waterperry Road Holton OX33 1HX
Discharge condition(s) 8 (Drainage details) on planning application P17/S4254/O. Outline planning application, with all matters reserved for subsequent approval except details of vehicular access, for demolition of all existing structures and redevelopment of the site with up to 500 dwellings and associated works including; engineering operations, including site clearance, remediation, remodelling and deposition of inert fill material arising from demolition on site; installation of new and modification of existing services and utilities; construction of foul and surface water drainage systems, including SuDS; creation of noise mitigation bund and fencing; creation of public open space, leisure, sport and recreation facilities including equipped play areas; ecological mitigation works; construction of a building for community/sport use and associated car parking; construction of internal estate roads, private drives and other highways infrastructure and construction of pedestrian footpaths.