Planning application
The Park Sports Centre Holton OX33 1QZ
Works: Demolition Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Discharge of condition(s) 4 (Ecology improvements) and 5 (Great Crested Newt Construction Method Statement) on planning permission P25/S1032/FUL Installation of photovoltaic panels on the existing flat roof of Park Sports Centre, demolition of the existing electricity sub station enclosure and installation of a new electricity sub station enclosure in the same position, installation of electrical switch room, installation of raised platform for Air Source Heat Pumps, installation of two Domestic Hot Water Heat pump Units, installation of two Air Source Heat Pumps and acoustic fence around them, installation of Access ladders and edge protection to the roof of Park Sports Centre.
As published by the council, reference P26/S1652/DIS
Application record
- Reference
- P26/S1652/DIS
- Type
- Discharge Conditions
- Status
- Decision Made
- Decision
- Granted As published: Discharge Details Agreed
- Received
- 13 May 2026
- Validated
- 13 May 2026
- Decided
- 13 Jul 2026
- Decision by
- Delegated
- Postcode
- OX33 1QZ
Timeline
Dates from the published record
-
13 May 2026
Received by South Oxfordshire
-
13 Jul 2026
Decision issued: Discharge Details Agreed
-
29 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Finn Geotherm UK Ltd Agent, registered in Attleborough
Active · incorporated 2006 · Attleborough
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
South Oxfordshire granted permission on 13 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
John Watson School Steve Drywood Building Wheatley Park Campus Holton OX33 1QH
Non-material amendment to amend to the approved drainage details of planning permission R3.0121/20 (P20/S4847/CC).
Decided Other 2 docs -
Holton Library Holton Oxford OX33 1QQ
Decarbonisation works requiring creation of new external plant room, installation of air source heat pumps and changing of windows
Granted Full applications Windows or glazing 20 docs -
Wheatley Park School Holton Oxford OX33 1QH
Change of use to play area Including provision of relocated pavilion and provision of playhouse, play equipment, surfacing materials, fencing, and gates to play area.
Granted Full applications 24 docs -
John Watson School, Steve Drywood Building, Wheatley Park Campus, Holton, OX33 1QH
Application by Oxfordshire County Council, for: Non-material amendment to amend the approved drainage details of planning permission R3.0121/20 (P20/S4847/CC) at John Watson School.
Decided Outline 1 doc -
Wheatley Park Sportsfield Holton OX33 1QL
Demolition of existing pavilion and changing rooms. Construction of new sports pavilion to include changing rooms, social area together with associated parking provision and improved site access
Withdrawn Full applications Demolition 9 docs -
St. Andrew's Field Holton Road Holton OX33 1PZ
To widen an entrance. Removal of a section of wall. Installation of new farm gates (as amplified by corrected block plans drwgno s BLO-001A and BLO-002A received on 28/02/22).
Granted Full applications 10 docs
Other condition discharge and variation applications
In South Oxfordshire
-
P26/S2980/S73 Granted
Rectory Pavilion, Chinnor Rugby Football Club Kingsey Road Thame OX9 3JL
Variation of condition 4 (Hours of use of floodlighting), of planning permission P26/S1549/FUL (Construction of 8 floodlights with luminaires to provide floodlighting to existing rugby pitch following removal of existing lights).
-
P26/S3564/DIS Granted
Newlands, Northend, Henley-on-Thames, RG9 6LQ
Discharge of conditions 7 (surface water drainage works) and 8 (foul drainage works) on application ref. P25/S0770/S73 Variation of condition 2 (approved plans) on application P23/S2783/FUL (Demolition of the existing dwelling and erection of replacement dwelling with associated parking and landscaping) - brick work in lieu of render.
-
P26/S2573/DIS Granted
The Boathouse, 2 The Moorings, Sheepwash Lane, Whitchurch-on-Thames, RG8 7RA
Discharge of Conditions 5 (Construction Environmental Management Plan), 6 (Bat & Bird Boxes) and 7 (Lighting) on Planning Permission P26/S0178/FUL (Demolition of existing and construction of a self-build replacement boathouse incorporating a wet dock, dry boat store and workshop at ground level, with two-bedroom residential accommodation above).
-
P26/S3287/DIS Granted
Two Tanners Cottages 25 Tanners Lane Chalkhouse Green Reading RG4 9AE
Discharge of conditions 6(construction method statement for bats) and 7(enhancements for bats (and nesting birds)) on application ref. P24/S3165/HH Two storey side/rear extension. Single storey rear extension. Front porch extension.
-
P26/S1773/DIS Granted
Land at Oxford Brookes University Wheatley Campus Waterperry Road Holton OX33 1HX
Discharge condition(s) 8 (Drainage details) on planning application P17/S4254/O. Outline planning application, with all matters reserved for subsequent approval except details of vehicular access, for demolition of all existing structures and redevelopment of the site with up to 500 dwellings and associated works including; engineering operations, including site clearance, remediation, remodelling and deposition of inert fill material arising from demolition on site; installation of new and modification of existing services and utilities; construction of foul and surface water drainage systems, including SuDS; creation of noise mitigation bund and fencing; creation of public open space, leisure, sport and recreation facilities including equipped play areas; ecological mitigation works; construction of a building for community/sport use and associated car parking; construction of internal estate roads, private drives and other highways infrastructure and construction of pedestrian footpaths.