Planning application
The Chilterns AONB
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
The replacement of 14 x 33 Kv wooden electricity poles on the WATL-STOCK (White) - 33 Kv circuit during the 2026/2027 financial year. The poles are located as per the attached plans circled red. The poles have been identified for replacement due to condition and are located within The Chilterns AONB. All poles will be replaced like-for-like in the same location.
As published by the council, reference P25/S4069/OH
Application record
- Reference
- P25/S4069/OH
- Type
- Other (Overhead Lines)
- Status
- Permitted
- Decision
- Granted As published: Overhead Electricity Lines - No objection
- Received
- 18 Dec 2025
- Validated
- 18 Dec 2025
- Decided
- 21 Jan 2026
Site history
Applications at this address on the South Oxfordshire register
This site has had 2 applications since 2025: 2 approved, 0 refused.
-
P25/S4071/OH Granted
The Chilterns AONB
The replacement of 8 x 33 Kv wooden electricity poles & 1 x ground stay on the CHIS-NUFF-WATL (Green) - 33 Kv circuit during the 2026/2027 financial year. The poles are located as per the attached plans circled red. The poles have been identified for replacement due to condition and are located within The Chilterns AONB. All poles will be replaced like-for-like in the same location.
Timeline
Dates from the published record
-
18 Dec 2025
Received by South Oxfordshire
-
21 Jan 2026
Decision issued: Overhead Electricity Lines - No objection
-
9 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
South Oxfordshire granted permission on 21 January 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About less common application types
This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.
Other less common application types
In South Oxfordshire
-
P26/S4457/6ABE Decided
Brightwell Park Brightwell Baldwin OX49 5NS
Erection of a new agricultural barn
-
P26/S4482/CM Decided
Wallingford Composting Facility, Benson Lane, Wallingford, OX10 6SQ
Non Material amendment to permission MW.0071/25 (P25/S2587/CM), to substitute the ‘Proposed Site Layout Plan - WC001’ in place of the ‘Site Plan - J0091857-25-01a’, for the installation of a storage shed and AdBlue tank.
-
P26/S4518/OH Decided
144 Gidley Way, Horspath, Oxford, OX33 1TD
Installation of new underground Low Voltage (LV) cable.
-
P26/S4318/6ABE Decided
Breach Park Farm Halfpenny Lane Cholsey Wallingford OX10 9JN
Proposed building
-
P26/S4023/CM Decided
Sewage Treatment Works Polecat End Lane Forest Hill Oxford OX33 1EH
Details pursuant to Condition 6 (Lighting Details) of planning permission no. MW.0006/25