Planning application
Fir Tree Cottage Land to the west of Wallingford (Site B) Wallingford
Works: Demolition Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Demolition of vacant dwelling to enable future offer of the site as part of the greenspace for Wallingford Site B.
As published by the council, reference P21/S4434/D
Application record
- Reference
- P21/S4434/D
- Type
- Other (Demolition Notif.)
- Status
- Permitted
- Decision
- Granted As published: Demolition Consent
- Received
- 18 Oct 2021
- Validated
- 18 Oct 2021
- Decided
- 15 Nov 2021
Timeline
Dates from the published record
-
18 Oct 2021
Received by South Oxfordshire
-
15 Nov 2021
Decision issued: Demolition Consent
-
12 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
18 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
South Oxfordshire granted permission on 15 November 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About less common application types
This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land to the West of Wallingford (Site B) Phase 3 Wallingford
EIA Screening Opinion in respect of Phase 3 of Land to the West of Wallingford (Site B). Phase 3 comprises construction of 104 dwellings with associated landscaping, infrastructure and open space and relates to land to the north of Phases 1 and 2. It also includes for the construction of the spine road to Wantage Road.
Decided Outline 6 docsMajor scheme -
Land to the West of Wallingford (Site B) Wallingford (in the parishes of Wallingford and Brightwell cum Sotwell)
Residential development comprising 555 dwellings, a one form entry primary school, associated landscaping and open spaces, construction of a new access onto the A4130 Calvin Thomas Way/Bosley Way, construction of a public transport link/emergency access onto Wantage Road and other supporting infrastructure works and facilities. (As amended by i) revised drawings and supporting information 16 September 2015; ii) additional information - planting schedule, assessment of Mill Brook and highway information 24 November 2015; iii) revised bus / emergency access onto Wantage Road 9 May 2017 and iv) additional drainage information 6 June 2017)
Granted Outline New dwelling 253 docsMajor scheme -
Land to the West of Wallingford (Site B) Wallingford
Engineering works and an intensification of use of the existing access to Fir Tree Cottage for construction purposes for a period of 7 years.
Granted Full applications Trees 23 docs -
16 Queens Avenue Wallingford OX10 0ND
Erection of one and a half storey dwelling and detached double garage (As amended by drawings SP01 V2, PP01 V1b and PP02 V1b reducing the height and altering the position of the garage and altering position of windows accompanying revised Design and Access Statement received 10 May 2016)
Granted Full applications Windows or glazing 16 docsDomestic -
Land to the West of Wallingford (Site B) Wallingford
The temporary use of Plot 50 (as approved as part of Phase 1 Reserved Matters; Reference: P17/S3891/RM) as a Sales and Marketing Suite with temporary access, associated parking, two fixed advertisements on the northern and southern elevation and landscaping for a period of 7 years (additional vehicle tracking and turning, landscaping and vehicle turning plans received 10/09/2019).
Granted Full applications 29 docs -
Land to the West of Wallingford (Site B) Phase 1 Wallingford
Phase 1 Reserved Matters comprising the construction of 125 dwellings, landscaping, sports pitches, allotments, estate roads and associated infrastructure (as amended by plans and supporting information received 19 March 2019) P14/S2860/O Residential development comprising 555 dwellings, a one form entry primary school, associated landscaping and open spaces, construction of a new access onto the A4130 Calvin Thomas Way/ Bosley Way, construction of a public transport link/ emergency access onto Wantage Road, and other supporting infrastructure works and facilities.
Granted Reserved matters New dwelling 603 docsMajor scheme
Other less common application types
In South Oxfordshire
-
P26/S4457/6ABE Decided
Brightwell Park Brightwell Baldwin OX49 5NS
Erection of a new agricultural barn
-
P26/S4482/CM Decided
Wallingford Composting Facility, Benson Lane, Wallingford, OX10 6SQ
Non Material amendment to permission MW.0071/25 (P25/S2587/CM), to substitute the ‘Proposed Site Layout Plan - WC001’ in place of the ‘Site Plan - J0091857-25-01a’, for the installation of a storage shed and AdBlue tank.
-
P26/S4518/OH Decided
144 Gidley Way, Horspath, Oxford, OX33 1TD
Installation of new underground Low Voltage (LV) cable.
-
P26/S4318/6ABE Decided
Breach Park Farm Halfpenny Lane Cholsey Wallingford OX10 9JN
Proposed building
-
P26/S4023/CM Decided
Sewage Treatment Works Polecat End Lane Forest Hill Oxford OX33 1EH
Details pursuant to Condition 6 (Lighting Details) of planning permission no. MW.0006/25