Planning application
Technology Centre Bozedown Drive Whitchurch Hill RG8 7QR
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Provision of substations and upgraded utility works, amendments to the existing car park including provision of electric vehicle charging points with canopy above (additional ecological information received 14th January 2022 and 30th March 2022 and 7th June 2022).
As published by the council, reference P21/S4312/FUL
Application record
- Reference
- P21/S4312/FUL
- Type
- Minor (Full Application)
- Status
- Permitted
- Decision
- Planning Permission
- Received
- 8 Oct 2021
- Validated
- 8 Oct 2021
- Decided
- 10 Aug 2022
- Postcode
- RG8 7QR
Site history
Applications at this address on the South Oxfordshire register
This site has had 9 applications since 2016: 3 approved, 0 refused.
-
P25/S3609/DIS Decided
Technology Centre Bozedown Drive Whitchurch Hill RG8 7QR
Discharge of General Biodiversity Gain (BNG) condition and condition 8 (Landscaping Scheme (trees and shrubs only)) on application ref. P24/S1748/FUL (Construction of single storey building for testing and research activities in connection with electric vehicles and battery technology. Temporary planning permission for a period of five years).
-
P25/S3147/DIS Decided
Technology Centre Bozedown Drive Whitchurch Hill RG8 7QR
Discharge of condition 5 (Ecology - Great Crested Newt Method Statement) on application ref. P24/S1748/FUL (Construction of single storey building for testing and research activities in connection with electric vehicles and battery technology. Temporary planning permission for a period of five years).
-
P25/S2905/DIS Decided
Technology Centre Bozedown Drive Whitchurch Hill RG8 7QR
Discharge of condition 12 (Contaminated Land) on application ref. P24/S1748/FUL (Construction of single storey building for testing and research activities in connection with electric vehicles and battery technology. Temporary planning permission for a period of five years.
-
P22/S3223/FUL Granted
Technology Centre, Bozedown Drive, Whitchurch Hill, RG8 7QR
The demolition of buildings; the erection of a new part single storey, part two storey building for the research / testing of electric battery technology and associated test chambers; and the erection of buildings and compound for storage and other ancillary facilities. (As amplified by additional information received 20 September 2022 and 29 September 2022 and 19 December 2022 and amended by plans received 12 January 2023).
-
P22/S2567/NM Decided
Technology Centre, Bozedown Drive, Whitchurch Hill, RG8 7QR
Non Material amendment to application P19/S4248/FUL (Redevelopment of the site to include demolition of time expired buildings (G, K, M, N, S (all to be fully demolished) and U (part demolition to remove store room) and replacement with a single building (Building H). Refurbishment of existing laboratories (Building D)) - to change the wording of conditions 3 Schedule of Materials, 4 Details of glass coating, 6 Construction Traffic Management, 8 Landscaping Scheme (trees and shrubs only), 9 Tree Protection, 12 External Lighting and 13 Drainage works to enable the refurbishment of Building D to progress ahead of Building H coming forward and to make some changes to the external appearance of Building D.
-
P21/S3770/D Granted
Technology Centre Bozedown Drive Whitchurch Hill RG8 7QR
Demolition of pump house. A single-storey building with pipework and machinery inside.
-
P21/S0464/TPO Granted
Technology Centre, Bozedown Drive, Whitchurch Hill, RG8 7QR
New electricity cable run is being placed around the site to update the old existing runs. The work is being carried out by contractors on behalf of the electricity board and BP Castrol. The works are being carried out by registered contractors and overseen by a project board and an Arboricultural Consultant. The remit is to retain all trees on site and to not disturb any tree roots greater than 25mm. Any roots discovered during this project of less than 25mm maybe cut back to allow for the pipe network to be installed. Trail pits have been dug and revealed a soil level of 500mm before starting to become clay. This is also confirmed by some of the works which showed that the soil then changing to heavy clay. It is unlikely that tree roots will be in this clay formation and therefore it is only the top 500mm that will be of concern.
-
P16/S0673/DIS Decided
Technology Centre Bozedown Drive Whitchurch Hill RG8 7QR
Discharge of condition 3 (archaeology) on Planning Permission P15/S2910/FUL. Creation of a natural pond with spoil used to form a shallow mound adjacent to the pond.
Timeline
Dates from the published record
-
8 Oct 2021
Received by South Oxfordshire
-
10 Aug 2022
Decision issued: Planning Permission
-
12 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
33 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
South Oxfordshire has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Technology Centre Bozedown Drive Whitchurch Hill RG8 7QR
Discharge of condition 3 (archaeology) on Planning Permission P15/S2910/FUL. Creation of a natural pond with spoil used to form a shallow mound adjacent to the pond.
Decided Conditions 2 docs -
BP Technology Centre, Bozedown Drive, near Whitchurch Hill, RG8 7QR
Discharge of conditions 3(materials schedule) & 4(glazing) on application P19/S4248/FUL as amended by non-material amendment application P22/S2567/NM. (Redevelopment of the site to include demolition of time expired buildings (G, K, M, N, S (all to be fully demolished) and U (part demolition to remove store room) and replacement with a single building (Building H). Refurbishment of existing laboratories (Building D)).
Decided Conditions Demolition Windows or glazing 4 docs -
Technology Centre, Bozedown Drive, Whitchurch Hill, RG8 7QR
The demolition of buildings; the erection of a new part single storey, part two storey building for the research / testing of electric battery technology and associated test chambers; and the erection of buildings and compound for storage and other ancillary facilities. (As amplified by additional information received 20 September 2022 and 29 September 2022 and 19 December 2022 and amended by plans received 12 January 2023).
Granted Full applications Demolition 70 docsSmall domestic -
BP Technology Centre, Bozedown Drive, near Whitchurch Hill, RG8 7QR
Non-material amendment to amend the triggers of conditions 12 and 13 on planning application P22/S3223/FUL (The demolition of buildings; the erection of a new part single storey, part two storey building for the research / testing of electric battery technology and associated test chambers; and the erection of buildings and compound for storage and other ancillary facilities.) Please see cover letter for full details.
Decided Amendments Demolition 3 docsSmall domestic -
Technology Centre Bozedown Drive Whitchurch Hill RG8 7QR
Discharge of General Biodiversity Gain (BNG) condition and condition 8 (Landscaping Scheme (trees and shrubs only)) on application ref. P24/S1748/FUL (Construction of single storey building for testing and research activities in connection with electric vehicles and battery technology. Temporary planning permission for a period of five years).
Decided Conditions 8 docsSmall domestic -
Technology Centre Bozedown Drive Whitchurch Hill RG8 7QR
Discharge of condition 12 (Contaminated Land) on application ref. P24/S1748/FUL (Construction of single storey building for testing and research activities in connection with electric vehicles and battery technology. Temporary planning permission for a period of five years.
Decided Conditions 5 docsSmall domestic
Other full applications
In South Oxfordshire
-
P26/S2454/FUL Granted
Building B24 Culham Campus Abingdon OX14 3DB
Proposed new external storage compound
-
P26/S0763/FUL Granted
Little Baldon Farm, Little Baldon, OX44 9PU
Change of use of land from landscaping to car parking associated with the existing commercial use.
-
P26/S1485/FUL Granted
27 Norreys Road, Didcot, OX11 0AT
Change of Use of a current 6 person HMO (CLASS C4) to a 7 person larger HMO ( Sui Generis) and associated bins and bike provision. Dropped kerb for parking arrangement and installation of ASOS heat pump, along with retrospective permission for demolition of existing conservatory and erection of a single storey rear extension.
-
P26/S2824/FUL Granted
Culham Science Centre Abingdon OX14 3DB
Retrospective planning application for the installation of external lighting bollards and associated works.
-
P26/S2343/FUL Granted
St Marys Preparatory School 13 St Andrews Road Henley-on-Thames RG9 1HS
Proposed change of use of St Mary’s Preparatory School (Class F.1) and Nursery (Class E (f)) to a Day Nursery (Class E (f)).