Planning application
Mersey Way Didcot
Works: Trees
Relates to P19/S1955/FUL
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Discharge of condition 4 - tree protection on application ref. P19/S1955/FUL Construction of a pipe bridge and associated works to existing road bridge structure.
As published by the council, reference P19/S3134/DIS
Application record
- Reference
- P19/S3134/DIS
- Type
- Other (Discharge Conditions)
- Status
- Permitted
- Decision
- Granted As published: Fully Discharged
- Received
- 7 Oct 2019
- Validated
- 7 Oct 2019
- Decided
- 19 Nov 2019
Site history
Applications at this address on the South Oxfordshire register
This site has had 2 applications since 2019: 2 approved, 0 refused.
-
P19/S1955/FUL Granted
Mersey Way Didcot
Construction of a pipe bridge and associated works to existing road bridge structure.
Timeline
Dates from the published record
-
7 Oct 2019
Received by South Oxfordshire
-
19 Nov 2019
Decision issued: Fully Discharged
-
29 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
P19/S1955/FUL Granted
Mersey Way Didcot
Construction of a pipe bridge and associated works to existing road bridge structure.
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
South Oxfordshire granted permission on 19 November 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Other condition discharge and variation applications
In South Oxfordshire
-
P26/S2980/S73 Granted
Rectory Pavilion, Chinnor Rugby Football Club Kingsey Road Thame OX9 3JL
Variation of condition 4 (Hours of use of floodlighting), of planning permission P26/S1549/FUL (Construction of 8 floodlights with luminaires to provide floodlighting to existing rugby pitch following removal of existing lights).
-
P26/S3564/DIS Granted
Newlands, Northend, Henley-on-Thames, RG9 6LQ
Discharge of conditions 7 (surface water drainage works) and 8 (foul drainage works) on application ref. P25/S0770/S73 Variation of condition 2 (approved plans) on application P23/S2783/FUL (Demolition of the existing dwelling and erection of replacement dwelling with associated parking and landscaping) - brick work in lieu of render.
-
P26/S2573/DIS Granted
The Boathouse, 2 The Moorings, Sheepwash Lane, Whitchurch-on-Thames, RG8 7RA
Discharge of Conditions 5 (Construction Environmental Management Plan), 6 (Bat & Bird Boxes) and 7 (Lighting) on Planning Permission P26/S0178/FUL (Demolition of existing and construction of a self-build replacement boathouse incorporating a wet dock, dry boat store and workshop at ground level, with two-bedroom residential accommodation above).
-
P26/S3287/DIS Granted
Two Tanners Cottages 25 Tanners Lane Chalkhouse Green Reading RG4 9AE
Discharge of conditions 6(construction method statement for bats) and 7(enhancements for bats (and nesting birds)) on application ref. P24/S3165/HH Two storey side/rear extension. Single storey rear extension. Front porch extension.
-
P26/S1773/DIS Granted
Land at Oxford Brookes University Wheatley Campus Waterperry Road Holton OX33 1HX
Discharge condition(s) 8 (Drainage details) on planning application P17/S4254/O. Outline planning application, with all matters reserved for subsequent approval except details of vehicular access, for demolition of all existing structures and redevelopment of the site with up to 500 dwellings and associated works including; engineering operations, including site clearance, remediation, remodelling and deposition of inert fill material arising from demolition on site; installation of new and modification of existing services and utilities; construction of foul and surface water drainage systems, including SuDS; creation of noise mitigation bund and fencing; creation of public open space, leisure, sport and recreation facilities including equipped play areas; ecological mitigation works; construction of a building for community/sport use and associated car parking; construction of internal estate roads, private drives and other highways infrastructure and construction of pedestrian footpaths.