Planning application
L&G Homes Phase 1 Residential Land at North East Didcot Didcot
Works: Trees Several homes
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Discharge of conditions 3- land use budget, 10- lifetime homes, 13- housing delivery document, 15- design code, 20- landscaping, environment and ecology, 26- surface and foul eater drainage, 28- new vehicular access, 29- roads, footpaths, access details and implementation, 30- tree protection, 31- landscaping, 32- landscape management plan, 34- electric charging points, 37- details of external lighting, 40- cycle parking facilities and 41- boundary treatment to application ref P15/S2902/O. Outline planning application with details of the means of access only to be considered for a new and integrated neighbourhood to the northeast of Didcot of up to 1880 homes (with up to 40% being Affordable Housing) and comprising: (i) two new primary schools; (ii) a new secondary school; (iii) a new leisure/sports facility and sports pitches, including a pavillion; (iv) a neighbourhood centre comprising: a 1500 sqm Class A1 (shop) use; up to 5 units, each up to 200 sqm, of small flexible units within Classes A1, A2, A3, A4 or A5; a Class A4 or A3 or mixed use Public House/restaurant; a Class C1 hotel; and a Class D1 non-residential institutional use (for example a creche or children's day nursery); (v) a new community hall; (vi) a Class C3 residential Extra Care Housing facility; (vii)new areas of green infrastructure including amenity green space, allotments and children's play areas; and (viii) a comprehensive suite of other supporting town-wide and site-specific associated infrastructure (As amended by revised master plan 21 November 2016 and additional information 8 January 2016).
As published by the council, reference P19/S1258/DIS
Application record
- Reference
- P19/S1258/DIS
- Type
- Other (Discharge Conditions)
- Status
- Conditions
- Decision
- Granted As published: Partially Discharged
- Received
- 15 Apr 2019
- Validated
- 18 Apr 2019
- Decided
- 26 Nov 2021
Timeline
Dates from the published record
-
15 Apr 2019
Received by South Oxfordshire
-
18 Apr 2019
Validated
Checked as complete and ready for consideration.
-
26 Nov 2021
Decision issued: Partially Discharged
-
29 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
41 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
South Oxfordshire granted permission on 26 November 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Other condition discharge and variation applications
In South Oxfordshire
-
P26/S2980/S73 Granted
Rectory Pavilion, Chinnor Rugby Football Club Kingsey Road Thame OX9 3JL
Variation of condition 4 (Hours of use of floodlighting), of planning permission P26/S1549/FUL (Construction of 8 floodlights with luminaires to provide floodlighting to existing rugby pitch following removal of existing lights).
-
P26/S3564/DIS Granted
Newlands, Northend, Henley-on-Thames, RG9 6LQ
Discharge of conditions 7 (surface water drainage works) and 8 (foul drainage works) on application ref. P25/S0770/S73 Variation of condition 2 (approved plans) on application P23/S2783/FUL (Demolition of the existing dwelling and erection of replacement dwelling with associated parking and landscaping) - brick work in lieu of render.
-
P26/S2573/DIS Granted
The Boathouse, 2 The Moorings, Sheepwash Lane, Whitchurch-on-Thames, RG8 7RA
Discharge of Conditions 5 (Construction Environmental Management Plan), 6 (Bat & Bird Boxes) and 7 (Lighting) on Planning Permission P26/S0178/FUL (Demolition of existing and construction of a self-build replacement boathouse incorporating a wet dock, dry boat store and workshop at ground level, with two-bedroom residential accommodation above).
-
P26/S3287/DIS Granted
Two Tanners Cottages 25 Tanners Lane Chalkhouse Green Reading RG4 9AE
Discharge of conditions 6(construction method statement for bats) and 7(enhancements for bats (and nesting birds)) on application ref. P24/S3165/HH Two storey side/rear extension. Single storey rear extension. Front porch extension.
-
P26/S1773/DIS Granted
Land at Oxford Brookes University Wheatley Campus Waterperry Road Holton OX33 1HX
Discharge condition(s) 8 (Drainage details) on planning application P17/S4254/O. Outline planning application, with all matters reserved for subsequent approval except details of vehicular access, for demolition of all existing structures and redevelopment of the site with up to 500 dwellings and associated works including; engineering operations, including site clearance, remediation, remodelling and deposition of inert fill material arising from demolition on site; installation of new and modification of existing services and utilities; construction of foul and surface water drainage systems, including SuDS; creation of noise mitigation bund and fencing; creation of public open space, leisure, sport and recreation facilities including equipped play areas; ecological mitigation works; construction of a building for community/sport use and associated car parking; construction of internal estate roads, private drives and other highways infrastructure and construction of pedestrian footpaths.