Cowley Substation Blackberry Lane near Sandford OX44 9BD
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Construction and operation of a 49.9MW battery storage facility, access road and hard surfacing; and a habitat management area on land to the South of the existing Cowley substation. As clarified by Applicant's email dated 3 April 2019 and as further clarified and amended by Botanical Report, Habitat Management Plan, Updated Net Gain Assessment accompanying Agent's letter dated 29 May 2019 and Agent's letter dated 15 July 2019.
As published by the council, reference P19/S0623/FUL
Application record
- Reference
- P19/S0623/FUL
- Type
- Major (Full Application)
- Status
- Permitted
- Decision
- Granted As published: Planning Permission
- Received
- 25 Feb 2019
- Validated
- 26 Feb 2019
- Decided
- 19 Jul 2019
- Postcode
- OX44 9BD
Site history
Applications at this address on the South Oxfordshire register
This site has had 2 applications since 2019: 1 approved, 0 refused.
-
P19/S2260/SCR Decided
Cowley Substation Blackberry Lane near Sandford OX44 9BD
Screening opinion in connection with application P19/S0623/FUL (Construction and operation of a 49.9MW battery storage facility, access road and hard surfacing; and a habitat management area on land to the South of the existing Cowley substation).
Timeline
Dates from the published record
-
25 Feb 2019
Received by South Oxfordshire
-
26 Feb 2019
Validated
Checked as complete and ready for consideration.
-
19 Jul 2019
Decision issued: Planning Permission
-
29 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
2 later applications on the register refer to this one:
-
P19/S3045/DIS Granted
Cowley Main Sub Station Lower Blackberry Lane Garsington OX44 9BD
Discharge of conditions 5 - construction environmental management plan, 6 - submission of revised woodland management plan and 7 - construction traffic management plan on application ref. P19/S0623/FUL Construction and operation of a 49.9MW battery storage facility, access road and hard surfacing; and a habitat management area on land to the South of the existing Cowley substation. As clarified by Applicant's email dated 3 April 2019 and as further clarified and amended by Botanical Report, Habitat Management Plan, Updated Net Gain Assessment accompanying Agent's letter dated 29 May 2019 and Agent's letter dated 15 July 2019.
-
P19/S2260/SCR Decided
Cowley Substation Blackberry Lane near Sandford OX44 9BD
Screening opinion in connection with application P19/S0623/FUL (Construction and operation of a 49.9MW battery storage facility, access road and hard surfacing; and a habitat management area on land to the South of the existing Cowley substation).
Documents
Plans, drawings, consultee responses and the officer's report
53 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
South Oxfordshire granted permission on 19 July 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
National Grid Cowley Sub Station, Blackberry Lane, near Greater Leys, OX44 9BD
Request for a formal Environmental Impact Assessment Screening Opinion for a proposed development located by Cowley Substation.
Decided Outline 3 docs -
Land RunningFrom Sth Of Grenoble Rd To Horspath Depot-Horspath Rd+RedbridgeP+R-Abingdon Rd Grenoble Road Oxford Oxfordshire
79% historically approved · decision due ~14 Apr
PLEASE NOTE THIS IS NOT A PLANNING APPLICATION. THIS IS FOR CONSULTATION PURPOSES ONLY. Consultation on the Scoping Opinion for a proposed residential led, mixed used community.
Awaiting decision Outline 15 docs -
Land RunningFrom Sth Of Grenoble Rd To Horspath Depot-Horspath Rd+RedbridgeP+R-Abingdon Rd Grenoble Road Oxford Oxfordshire
Details submitted in compliance with condition 6 (Remediation strategy) of planning permission 20/00320/FUL.
Granted Conditions 4 docs -
Land RunningFrom Sth Of Grenoble Rd To Horspath Depot-Horspath Rd+RedbridgeP+R-Abingdon Rd Grenoble Road Oxford Oxfordshire
Details submitted in compliance with conditions 4 (Reinstatement upon completion), 6 (Remediation strategy) and 9 (No construction within 5m of water main) of planning permission 20/00320/FUL.
Split decision Conditions 8 docs -
47 Columbine Gardens Oxford OX4 7LH
Conversion of garage to habitable space. Insertion of 2no. windows.
Granted Full applications Windows or glazing 34 docs
Other full applications
In South Oxfordshire
-
P26/S3490/FUL Granted
26 High Street Thame OX9 2BZ
Proposed freestanding canopy located within existing courtyard
-
P26/S3283/FUL Granted
Maple Croft Mongewell Wallingford OX10 8BP
Change of use from ancillary accommodation to separate dwelling (retrospective).
-
P26/S1647/FUL Granted
Greyhone Leigh, Colmore Lane, Kingwood, Henley-on-Thames, RG9 5LX
Erection of a self-build detached dwelling with associated parking and landscaping
-
P26/S1596/FUL Granted
Former grain store Sheepcote Farm Mongewell OX10 8BP
Change of use of farm store to storage (B8) use.
-
P26/S2455/FUL Granted
2 Neals Farm Cottages Neals Lane Wyfold RG4 9JF
Extension and alterations to existing workshop and home office.